APPARATUS AND METHOD FOR DETERMINING A MAINTENANCE SCHEDULE
Upon application of first inputs and for a first proposed maintenance event, a lifing model responsively produces a cost of an unplanned failure for an asset. Upon application of second inputs, a performance analysis model responsively produces a cost of degradation of performance of the asset over...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Hein, Carlos Caliskan, Ezgi Billheimer, Thomas Convery, Janet Foulkes, Bradford Lagrange, Benjamin Maenza, Maria Korjenic, Alen Del Castillo, Eran Rae Diokno |
description | Upon application of first inputs and for a first proposed maintenance event, a lifing model responsively produces a cost of an unplanned failure for an asset. Upon application of second inputs, a performance analysis model responsively produces a cost of degradation of performance of the asset over time. A projected revenue for the asset is based upon third inputs. A profitability of the asset is determined for the first proposed maintenance event. Subsequently, one or more of the first inputs, the second inputs, or the third inputs are adjusted based upon a second proposed maintenance event, and an adjusted profitability determined for the proposed second maintenance event. The adjusted profitability is displayed at the display. One of the proposed maintenance events is selected. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2019102750A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2019102750A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2019102750A13</originalsourceid><addsrcrecordid>eNrjZLB2DAhwDHIMCQ1WcPRzUfB1DfHwd1Fw8w9ScHENcQ3y9fTz9HNXcFTwdfT0C3H1c_RzdlUIdvZwdQn1ceVhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfGhwUYGhpaGBkbmpgaOhsbEqQIAaxUp_w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>APPARATUS AND METHOD FOR DETERMINING A MAINTENANCE SCHEDULE</title><source>esp@cenet</source><creator>Hein, Carlos ; Caliskan, Ezgi ; Billheimer, Thomas ; Convery, Janet ; Foulkes, Bradford ; Lagrange, Benjamin ; Maenza, Maria ; Korjenic, Alen ; Del Castillo, Eran Rae Diokno</creator><creatorcontrib>Hein, Carlos ; Caliskan, Ezgi ; Billheimer, Thomas ; Convery, Janet ; Foulkes, Bradford ; Lagrange, Benjamin ; Maenza, Maria ; Korjenic, Alen ; Del Castillo, Eran Rae Diokno</creatorcontrib><description>Upon application of first inputs and for a first proposed maintenance event, a lifing model responsively produces a cost of an unplanned failure for an asset. Upon application of second inputs, a performance analysis model responsively produces a cost of degradation of performance of the asset over time. A projected revenue for the asset is based upon third inputs. A profitability of the asset is determined for the first proposed maintenance event. Subsequently, one or more of the first inputs, the second inputs, or the third inputs are adjusted based upon a second proposed maintenance event, and an adjusted profitability determined for the proposed second maintenance event. The adjusted profitability is displayed at the display. One of the proposed maintenance events is selected.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; ELECTRIC DIGITAL DATA PROCESSING ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190404&DB=EPODOC&CC=US&NR=2019102750A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190404&DB=EPODOC&CC=US&NR=2019102750A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Hein, Carlos</creatorcontrib><creatorcontrib>Caliskan, Ezgi</creatorcontrib><creatorcontrib>Billheimer, Thomas</creatorcontrib><creatorcontrib>Convery, Janet</creatorcontrib><creatorcontrib>Foulkes, Bradford</creatorcontrib><creatorcontrib>Lagrange, Benjamin</creatorcontrib><creatorcontrib>Maenza, Maria</creatorcontrib><creatorcontrib>Korjenic, Alen</creatorcontrib><creatorcontrib>Del Castillo, Eran Rae Diokno</creatorcontrib><title>APPARATUS AND METHOD FOR DETERMINING A MAINTENANCE SCHEDULE</title><description>Upon application of first inputs and for a first proposed maintenance event, a lifing model responsively produces a cost of an unplanned failure for an asset. Upon application of second inputs, a performance analysis model responsively produces a cost of degradation of performance of the asset over time. A projected revenue for the asset is based upon third inputs. A profitability of the asset is determined for the first proposed maintenance event. Subsequently, one or more of the first inputs, the second inputs, or the third inputs are adjusted based upon a second proposed maintenance event, and an adjusted profitability determined for the proposed second maintenance event. The adjusted profitability is displayed at the display. One of the proposed maintenance events is selected.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>ELECTRIC DIGITAL DATA PROCESSING</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB2DAhwDHIMCQ1WcPRzUfB1DfHwd1Fw8w9ScHENcQ3y9fTz9HNXcFTwdfT0C3H1c_RzdlUIdvZwdQn1ceVhYE1LzClO5YXS3AzKbq4hzh66qQX58anFBYnJqXmpJfGhwUYGhpaGBkbmpgaOhsbEqQIAaxUp_w</recordid><startdate>20190404</startdate><enddate>20190404</enddate><creator>Hein, Carlos</creator><creator>Caliskan, Ezgi</creator><creator>Billheimer, Thomas</creator><creator>Convery, Janet</creator><creator>Foulkes, Bradford</creator><creator>Lagrange, Benjamin</creator><creator>Maenza, Maria</creator><creator>Korjenic, Alen</creator><creator>Del Castillo, Eran Rae Diokno</creator><scope>EVB</scope></search><sort><creationdate>20190404</creationdate><title>APPARATUS AND METHOD FOR DETERMINING A MAINTENANCE SCHEDULE</title><author>Hein, Carlos ; Caliskan, Ezgi ; Billheimer, Thomas ; Convery, Janet ; Foulkes, Bradford ; Lagrange, Benjamin ; Maenza, Maria ; Korjenic, Alen ; Del Castillo, Eran Rae Diokno</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2019102750A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2019</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>ELECTRIC DIGITAL DATA PROCESSING</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>Hein, Carlos</creatorcontrib><creatorcontrib>Caliskan, Ezgi</creatorcontrib><creatorcontrib>Billheimer, Thomas</creatorcontrib><creatorcontrib>Convery, Janet</creatorcontrib><creatorcontrib>Foulkes, Bradford</creatorcontrib><creatorcontrib>Lagrange, Benjamin</creatorcontrib><creatorcontrib>Maenza, Maria</creatorcontrib><creatorcontrib>Korjenic, Alen</creatorcontrib><creatorcontrib>Del Castillo, Eran Rae Diokno</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Hein, Carlos</au><au>Caliskan, Ezgi</au><au>Billheimer, Thomas</au><au>Convery, Janet</au><au>Foulkes, Bradford</au><au>Lagrange, Benjamin</au><au>Maenza, Maria</au><au>Korjenic, Alen</au><au>Del Castillo, Eran Rae Diokno</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>APPARATUS AND METHOD FOR DETERMINING A MAINTENANCE SCHEDULE</title><date>2019-04-04</date><risdate>2019</risdate><abstract>Upon application of first inputs and for a first proposed maintenance event, a lifing model responsively produces a cost of an unplanned failure for an asset. Upon application of second inputs, a performance analysis model responsively produces a cost of degradation of performance of the asset over time. A projected revenue for the asset is based upon third inputs. A profitability of the asset is determined for the first proposed maintenance event. Subsequently, one or more of the first inputs, the second inputs, or the third inputs are adjusted based upon a second proposed maintenance event, and an adjusted profitability determined for the proposed second maintenance event. The adjusted profitability is displayed at the display. One of the proposed maintenance events is selected.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2019102750A1 |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ELECTRIC DIGITAL DATA PROCESSING PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | APPARATUS AND METHOD FOR DETERMINING A MAINTENANCE SCHEDULE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T21%3A52%3A12IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Hein,%20Carlos&rft.date=2019-04-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2019102750A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |