Risk Analysis to Improve Operational Workforce Planning

Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the w...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HOJBY SOREN, ZHANG KIT YUE
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HOJBY SOREN
ZHANG KIT YUE
description Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the workforce plan. Changes made to the workforce by a lower level manager can be rolled up to an upper level manager for review and approval before the changes are finalized. Furthermore, upper level managers can generate sub-plans for lower level managers. Sub-plans can include planning criteria that is created by an upper level manager for a lower level manager. The lower level managers can report back to the upper level manager on the completion of the sub-plan when the lower level manager rolls up his changes to the workforce plan for the manager to review.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2016098653A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2016098653A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2016098653A13</originalsourceid><addsrcrecordid>eNrjZDAPyizOVnDMS8ypLM4sVijJV_DMLSjKL0tV8C9ILUosycwHSimE5xdlp-UXJacqBOQk5uVl5qXzMLCmJeYUp_JCaW4GZTfXEGcP3dSC_PjU4oLE5NS81JL40GAjA0MzA0sLM1NjR0Nj4lQBAIZSLus</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Risk Analysis to Improve Operational Workforce Planning</title><source>esp@cenet</source><creator>HOJBY SOREN ; ZHANG KIT YUE</creator><creatorcontrib>HOJBY SOREN ; ZHANG KIT YUE</creatorcontrib><description>Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the workforce plan. Changes made to the workforce by a lower level manager can be rolled up to an upper level manager for review and approval before the changes are finalized. Furthermore, upper level managers can generate sub-plans for lower level managers. Sub-plans can include planning criteria that is created by an upper level manager for a lower level manager. The lower level managers can report back to the upper level manager on the completion of the sub-plan when the lower level manager rolls up his changes to the workforce plan for the manager to review.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160407&amp;DB=EPODOC&amp;CC=US&amp;NR=2016098653A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20160407&amp;DB=EPODOC&amp;CC=US&amp;NR=2016098653A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HOJBY SOREN</creatorcontrib><creatorcontrib>ZHANG KIT YUE</creatorcontrib><title>Risk Analysis to Improve Operational Workforce Planning</title><description>Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the workforce plan. Changes made to the workforce by a lower level manager can be rolled up to an upper level manager for review and approval before the changes are finalized. Furthermore, upper level managers can generate sub-plans for lower level managers. Sub-plans can include planning criteria that is created by an upper level manager for a lower level manager. The lower level managers can report back to the upper level manager on the completion of the sub-plan when the lower level manager rolls up his changes to the workforce plan for the manager to review.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAPyizOVnDMS8ypLM4sVijJV_DMLSjKL0tV8C9ILUosycwHSimE5xdlp-UXJacqBOQk5uVl5qXzMLCmJeYUp_JCaW4GZTfXEGcP3dSC_PjU4oLE5NS81JL40GAjA0MzA0sLM1NjR0Nj4lQBAIZSLus</recordid><startdate>20160407</startdate><enddate>20160407</enddate><creator>HOJBY SOREN</creator><creator>ZHANG KIT YUE</creator><scope>EVB</scope></search><sort><creationdate>20160407</creationdate><title>Risk Analysis to Improve Operational Workforce Planning</title><author>HOJBY SOREN ; ZHANG KIT YUE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2016098653A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2016</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>HOJBY SOREN</creatorcontrib><creatorcontrib>ZHANG KIT YUE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HOJBY SOREN</au><au>ZHANG KIT YUE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Risk Analysis to Improve Operational Workforce Planning</title><date>2016-04-07</date><risdate>2016</risdate><abstract>Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the workforce plan. Changes made to the workforce by a lower level manager can be rolled up to an upper level manager for review and approval before the changes are finalized. Furthermore, upper level managers can generate sub-plans for lower level managers. Sub-plans can include planning criteria that is created by an upper level manager for a lower level manager. The lower level managers can report back to the upper level manager on the completion of the sub-plan when the lower level manager rolls up his changes to the workforce plan for the manager to review.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US2016098653A1
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Risk Analysis to Improve Operational Workforce Planning
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T19%3A24%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HOJBY%20SOREN&rft.date=2016-04-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2016098653A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true