Risk Analysis to Improve Operational Workforce Planning
Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the w...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | HOJBY SOREN ZHANG KIT YUE |
description | Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the workforce plan. Changes made to the workforce by a lower level manager can be rolled up to an upper level manager for review and approval before the changes are finalized. Furthermore, upper level managers can generate sub-plans for lower level managers. Sub-plans can include planning criteria that is created by an upper level manager for a lower level manager. The lower level managers can report back to the upper level manager on the completion of the sub-plan when the lower level manager rolls up his changes to the workforce plan for the manager to review. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2016098653A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2016098653A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2016098653A13</originalsourceid><addsrcrecordid>eNrjZDAPyizOVnDMS8ypLM4sVijJV_DMLSjKL0tV8C9ILUosycwHSimE5xdlp-UXJacqBOQk5uVl5qXzMLCmJeYUp_JCaW4GZTfXEGcP3dSC_PjU4oLE5NS81JL40GAjA0MzA0sLM1NjR0Nj4lQBAIZSLus</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Risk Analysis to Improve Operational Workforce Planning</title><source>esp@cenet</source><creator>HOJBY SOREN ; ZHANG KIT YUE</creator><creatorcontrib>HOJBY SOREN ; ZHANG KIT YUE</creatorcontrib><description>Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the workforce plan. Changes made to the workforce by a lower level manager can be rolled up to an upper level manager for review and approval before the changes are finalized. Furthermore, upper level managers can generate sub-plans for lower level managers. Sub-plans can include planning criteria that is created by an upper level manager for a lower level manager. The lower level managers can report back to the upper level manager on the completion of the sub-plan when the lower level manager rolls up his changes to the workforce plan for the manager to review.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2016</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20160407&DB=EPODOC&CC=US&NR=2016098653A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20160407&DB=EPODOC&CC=US&NR=2016098653A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HOJBY SOREN</creatorcontrib><creatorcontrib>ZHANG KIT YUE</creatorcontrib><title>Risk Analysis to Improve Operational Workforce Planning</title><description>Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the workforce plan. Changes made to the workforce by a lower level manager can be rolled up to an upper level manager for review and approval before the changes are finalized. Furthermore, upper level managers can generate sub-plans for lower level managers. Sub-plans can include planning criteria that is created by an upper level manager for a lower level manager. The lower level managers can report back to the upper level manager on the completion of the sub-plan when the lower level manager rolls up his changes to the workforce plan for the manager to review.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2016</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAPyizOVnDMS8ypLM4sVijJV_DMLSjKL0tV8C9ILUosycwHSimE5xdlp-UXJacqBOQk5uVl5qXzMLCmJeYUp_JCaW4GZTfXEGcP3dSC_PjU4oLE5NS81JL40GAjA0MzA0sLM1NjR0Nj4lQBAIZSLus</recordid><startdate>20160407</startdate><enddate>20160407</enddate><creator>HOJBY SOREN</creator><creator>ZHANG KIT YUE</creator><scope>EVB</scope></search><sort><creationdate>20160407</creationdate><title>Risk Analysis to Improve Operational Workforce Planning</title><author>HOJBY SOREN ; ZHANG KIT YUE</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2016098653A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2016</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>HOJBY SOREN</creatorcontrib><creatorcontrib>ZHANG KIT YUE</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HOJBY SOREN</au><au>ZHANG KIT YUE</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Risk Analysis to Improve Operational Workforce Planning</title><date>2016-04-07</date><risdate>2016</risdate><abstract>Techniques are described for operational workforce planning tool. The planning tool can be utilized by a manager to analyze an existing workforce plan. A manager within the organization can adjust the workforce plan based on planning criteria. The adjustments can be stored as planning tasks of the workforce plan. Changes made to the workforce by a lower level manager can be rolled up to an upper level manager for review and approval before the changes are finalized. Furthermore, upper level managers can generate sub-plans for lower level managers. Sub-plans can include planning criteria that is created by an upper level manager for a lower level manager. The lower level managers can report back to the upper level manager on the completion of the sub-plan when the lower level manager rolls up his changes to the workforce plan for the manager to review.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2016098653A1 |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Risk Analysis to Improve Operational Workforce Planning |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T19%3A24%3A01IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HOJBY%20SOREN&rft.date=2016-04-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2016098653A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |