BACKFILL SCHEDULING FOR EMBARRASSINGLY PARALLEL JOBS
Backfill scheduling for embarrassingly parallel jobs. A disclosed method includes: receiving an initial schedule having a plurality of jobs scheduled over time on a plurality of nodes, determining that a first job can be split into a plurality of sub-tasks that can respectively be performed in paral...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | Backfill scheduling for embarrassingly parallel jobs. A disclosed method includes: receiving an initial schedule having a plurality of jobs scheduled over time on a plurality of nodes, determining that a first job can be split into a plurality of sub-tasks that can respectively be performed in parallel on different nodes, splitting the first job into the plurality of sub-tasks, and moving a first sub-task from its position in the initial schedule to a new position to yield a first revised schedule. |
---|