DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT
A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The de...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | HICKS SCOTT DENISON MARTIN, JR. JAMES A |
description | A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The defined at least one EV calculation rule is used to calculate the Evs. The at least one EV calculation rule, which includes the components, the locations, and the formulae, is stored. Defining the at least one EV calculation rule includes: identifying the components used to calculate the Evs; identifying the locations in which the components are located; and identifying the formulae specifying how the components are combined to create the EVs. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2013006694A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2013006694A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2013006694A13</originalsourceid><addsrcrecordid>eNrjZDB3cQ1xDfL19HMM8fT3U_B3U3B1DPJzdVEIc_QJdQ0GCQQE-bsHuQaD2Y4gnpercwgPA2taYk5xKi-U5mZQdnMNcfbQTS3Ij08tLkhMTs1LLYkPDTYyMDQ2MDAzszRxNDQmThUAyXQo7g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT</title><source>esp@cenet</source><creator>HICKS SCOTT DENISON ; MARTIN, JR. JAMES A</creator><creatorcontrib>HICKS SCOTT DENISON ; MARTIN, JR. JAMES A</creatorcontrib><description>A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The defined at least one EV calculation rule is used to calculate the Evs. The at least one EV calculation rule, which includes the components, the locations, and the formulae, is stored. Defining the at least one EV calculation rule includes: identifying the components used to calculate the Evs; identifying the locations in which the components are located; and identifying the formulae specifying how the components are combined to create the EVs.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2013</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20130103&DB=EPODOC&CC=US&NR=2013006694A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20130103&DB=EPODOC&CC=US&NR=2013006694A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HICKS SCOTT DENISON</creatorcontrib><creatorcontrib>MARTIN, JR. JAMES A</creatorcontrib><title>DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT</title><description>A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The defined at least one EV calculation rule is used to calculate the Evs. The at least one EV calculation rule, which includes the components, the locations, and the formulae, is stored. Defining the at least one EV calculation rule includes: identifying the components used to calculate the Evs; identifying the locations in which the components are located; and identifying the formulae specifying how the components are combined to create the EVs.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2013</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB3cQ1xDfL19HMM8fT3U_B3U3B1DPJzdVEIc_QJdQ0GCQQE-bsHuQaD2Y4gnpercwgPA2taYk5xKi-U5mZQdnMNcfbQTS3Ij08tLkhMTs1LLYkPDTYyMDQ2MDAzszRxNDQmThUAyXQo7g</recordid><startdate>20130103</startdate><enddate>20130103</enddate><creator>HICKS SCOTT DENISON</creator><creator>MARTIN, JR. JAMES A</creator><scope>EVB</scope></search><sort><creationdate>20130103</creationdate><title>DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT</title><author>HICKS SCOTT DENISON ; MARTIN, JR. JAMES A</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2013006694A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2013</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>HICKS SCOTT DENISON</creatorcontrib><creatorcontrib>MARTIN, JR. JAMES A</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HICKS SCOTT DENISON</au><au>MARTIN, JR. JAMES A</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT</title><date>2013-01-03</date><risdate>2013</risdate><abstract>A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The defined at least one EV calculation rule is used to calculate the Evs. The at least one EV calculation rule, which includes the components, the locations, and the formulae, is stored. Defining the at least one EV calculation rule includes: identifying the components used to calculate the Evs; identifying the locations in which the components are located; and identifying the formulae specifying how the components are combined to create the EVs.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2013006694A1 |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T06%3A58%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HICKS%20SCOTT%20DENISON&rft.date=2013-01-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2013006694A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |