DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT

A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The de...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: HICKS SCOTT DENISON, MARTIN, JR. JAMES A
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator HICKS SCOTT DENISON
MARTIN, JR. JAMES A
description A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The defined at least one EV calculation rule is used to calculate the Evs. The at least one EV calculation rule, which includes the components, the locations, and the formulae, is stored. Defining the at least one EV calculation rule includes: identifying the components used to calculate the Evs; identifying the locations in which the components are located; and identifying the formulae specifying how the components are combined to create the EVs.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2013006694A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2013006694A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2013006694A13</originalsourceid><addsrcrecordid>eNrjZDB3cQ1xDfL19HMM8fT3U_B3U3B1DPJzdVEIc_QJdQ0GCQQE-bsHuQaD2Y4gnpercwgPA2taYk5xKi-U5mZQdnMNcfbQTS3Ij08tLkhMTs1LLYkPDTYyMDQ2MDAzszRxNDQmThUAyXQo7g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT</title><source>esp@cenet</source><creator>HICKS SCOTT DENISON ; MARTIN, JR. JAMES A</creator><creatorcontrib>HICKS SCOTT DENISON ; MARTIN, JR. JAMES A</creatorcontrib><description>A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The defined at least one EV calculation rule is used to calculate the Evs. The at least one EV calculation rule, which includes the components, the locations, and the formulae, is stored. Defining the at least one EV calculation rule includes: identifying the components used to calculate the Evs; identifying the locations in which the components are located; and identifying the formulae specifying how the components are combined to create the EVs.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2013</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20130103&amp;DB=EPODOC&amp;CC=US&amp;NR=2013006694A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20130103&amp;DB=EPODOC&amp;CC=US&amp;NR=2013006694A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>HICKS SCOTT DENISON</creatorcontrib><creatorcontrib>MARTIN, JR. JAMES A</creatorcontrib><title>DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT</title><description>A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The defined at least one EV calculation rule is used to calculate the Evs. The at least one EV calculation rule, which includes the components, the locations, and the formulae, is stored. Defining the at least one EV calculation rule includes: identifying the components used to calculate the Evs; identifying the locations in which the components are located; and identifying the formulae specifying how the components are combined to create the EVs.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2013</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDB3cQ1xDfL19HMM8fT3U_B3U3B1DPJzdVEIc_QJdQ0GCQQE-bsHuQaD2Y4gnpercwgPA2taYk5xKi-U5mZQdnMNcfbQTS3Ij08tLkhMTs1LLYkPDTYyMDQ2MDAzszRxNDQmThUAyXQo7g</recordid><startdate>20130103</startdate><enddate>20130103</enddate><creator>HICKS SCOTT DENISON</creator><creator>MARTIN, JR. JAMES A</creator><scope>EVB</scope></search><sort><creationdate>20130103</creationdate><title>DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT</title><author>HICKS SCOTT DENISON ; MARTIN, JR. JAMES A</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2013006694A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2013</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>HICKS SCOTT DENISON</creatorcontrib><creatorcontrib>MARTIN, JR. JAMES A</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>HICKS SCOTT DENISON</au><au>MARTIN, JR. JAMES A</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT</title><date>2013-01-03</date><risdate>2013</risdate><abstract>A system and method for determining earned values (EVs) of progress of a project. At least one EV calculation rule is defined for calculating EVs in terms of components to be combined into the EVs, locations in which the components are located, and formulae required to combine the components. The defined at least one EV calculation rule is used to calculate the Evs. The at least one EV calculation rule, which includes the components, the locations, and the formulae, is stored. Defining the at least one EV calculation rule includes: identifying the components used to calculate the Evs; identifying the locations in which the components are located; and identifying the formulae specifying how the components are combined to create the EVs.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US2013006694A1
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title DETERMINATION OF EARNED VALUES OF PROGRESS OF A PROJECT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T06%3A58%3A17IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=HICKS%20SCOTT%20DENISON&rft.date=2013-01-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2013006694A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true