Method of Improving Waterflood Performance using Barrier Fractures and Inflow Control Devices
Methods including providing a substantially horizontal wellbore having at least one productive interval within a hydrocarbon reservoir and forming at least one non-conductive transverse fracture in the reservoir along the substantially horizontal wellbore. An injection well is also provided. A fluid...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | EAST LOYD E SIERRA LEOPOLDO SOLIMAN MOHAMED Y |
description | Methods including providing a substantially horizontal wellbore having at least one productive interval within a hydrocarbon reservoir and forming at least one non-conductive transverse fracture in the reservoir along the substantially horizontal wellbore. An injection well is also provided. A fluid is injected into the reservoir through the injection well to displace hydrocarbons within the reservoir toward a production portion of the substantially horizontal wellbore. Hydrocarbons are drained from the reservoir into at least one production interval of the substantially horizontal wellbore. Fluid production from the at least one production interval into the substantially horizontal wellbore flows through an inflow control device that can restrict the fluid flow. A non-conductive transverse fracture can form a barrier within the reservoir to divert injected fluids to increase sweep efficiency and reduce the influx of injected fluids into the production interval. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US2012160484A1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US2012160484A1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US2012160484A13</originalsourceid><addsrcrecordid>eNqNisEKgkAURd20iOofHrQOHJNwW5bkIggqWoU8xjcl6Dx5M9rvN0Ef0Opczj3T6HEi_-Ia2EDZ9cJjY59wR09iWg7-HAZLh1YTDO577lCkIYFCUPtByAHaGkob-jfkbL1wC3saG01uHk0Mto4WP86iZXG45scV9VyR61GTJV_dLkmsErWJ0yzdqvV_1QfPhDzs</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Method of Improving Waterflood Performance using Barrier Fractures and Inflow Control Devices</title><source>esp@cenet</source><creator>EAST LOYD E ; SIERRA LEOPOLDO ; SOLIMAN MOHAMED Y</creator><creatorcontrib>EAST LOYD E ; SIERRA LEOPOLDO ; SOLIMAN MOHAMED Y</creatorcontrib><description>Methods including providing a substantially horizontal wellbore having at least one productive interval within a hydrocarbon reservoir and forming at least one non-conductive transverse fracture in the reservoir along the substantially horizontal wellbore. An injection well is also provided. A fluid is injected into the reservoir through the injection well to displace hydrocarbons within the reservoir toward a production portion of the substantially horizontal wellbore. Hydrocarbons are drained from the reservoir into at least one production interval of the substantially horizontal wellbore. Fluid production from the at least one production interval into the substantially horizontal wellbore flows through an inflow control device that can restrict the fluid flow. A non-conductive transverse fracture can form a barrier within the reservoir to divert injected fluids to increase sweep efficiency and reduce the influx of injected fluids into the production interval.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120628&DB=EPODOC&CC=US&NR=2012160484A1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120628&DB=EPODOC&CC=US&NR=2012160484A1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>EAST LOYD E</creatorcontrib><creatorcontrib>SIERRA LEOPOLDO</creatorcontrib><creatorcontrib>SOLIMAN MOHAMED Y</creatorcontrib><title>Method of Improving Waterflood Performance using Barrier Fractures and Inflow Control Devices</title><description>Methods including providing a substantially horizontal wellbore having at least one productive interval within a hydrocarbon reservoir and forming at least one non-conductive transverse fracture in the reservoir along the substantially horizontal wellbore. An injection well is also provided. A fluid is injected into the reservoir through the injection well to displace hydrocarbons within the reservoir toward a production portion of the substantially horizontal wellbore. Hydrocarbons are drained from the reservoir into at least one production interval of the substantially horizontal wellbore. Fluid production from the at least one production interval into the substantially horizontal wellbore flows through an inflow control device that can restrict the fluid flow. A non-conductive transverse fracture can form a barrier within the reservoir to divert injected fluids to increase sweep efficiency and reduce the influx of injected fluids into the production interval.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNisEKgkAURd20iOofHrQOHJNwW5bkIggqWoU8xjcl6Dx5M9rvN0Ef0Opczj3T6HEi_-Ia2EDZ9cJjY59wR09iWg7-HAZLh1YTDO577lCkIYFCUPtByAHaGkob-jfkbL1wC3saG01uHk0Mto4WP86iZXG45scV9VyR61GTJV_dLkmsErWJ0yzdqvV_1QfPhDzs</recordid><startdate>20120628</startdate><enddate>20120628</enddate><creator>EAST LOYD E</creator><creator>SIERRA LEOPOLDO</creator><creator>SOLIMAN MOHAMED Y</creator><scope>EVB</scope></search><sort><creationdate>20120628</creationdate><title>Method of Improving Waterflood Performance using Barrier Fractures and Inflow Control Devices</title><author>EAST LOYD E ; SIERRA LEOPOLDO ; SOLIMAN MOHAMED Y</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US2012160484A13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2012</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>EAST LOYD E</creatorcontrib><creatorcontrib>SIERRA LEOPOLDO</creatorcontrib><creatorcontrib>SOLIMAN MOHAMED Y</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>EAST LOYD E</au><au>SIERRA LEOPOLDO</au><au>SOLIMAN MOHAMED Y</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Method of Improving Waterflood Performance using Barrier Fractures and Inflow Control Devices</title><date>2012-06-28</date><risdate>2012</risdate><abstract>Methods including providing a substantially horizontal wellbore having at least one productive interval within a hydrocarbon reservoir and forming at least one non-conductive transverse fracture in the reservoir along the substantially horizontal wellbore. An injection well is also provided. A fluid is injected into the reservoir through the injection well to displace hydrocarbons within the reservoir toward a production portion of the substantially horizontal wellbore. Hydrocarbons are drained from the reservoir into at least one production interval of the substantially horizontal wellbore. Fluid production from the at least one production interval into the substantially horizontal wellbore flows through an inflow control device that can restrict the fluid flow. A non-conductive transverse fracture can form a barrier within the reservoir to divert injected fluids to increase sweep efficiency and reduce the influx of injected fluids into the production interval.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US2012160484A1 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | Method of Improving Waterflood Performance using Barrier Fractures and Inflow Control Devices |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-07T04%3A34%3A16IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=EAST%20LOYD%20E&rft.date=2012-06-28&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS2012160484A1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |