DEVICE FOR DETERMINING BUILD-TO-ORDER PRODUCTION PROCESS, PROGRAM, SYSTEM FOR DETERMINING BUILD-TO-ORDER PRODUCTION PROCESS, AND METHOD FOR DETERMINING BUILD-TO-ORDER PRODUCTION PROCESS

A build-to-order production process is determined in consideration of magnitude of demand. A lead time calculating section (122) calculates process-specific lead time proportional to the time at which the number of items required to produce the amount of demand for products which are periodically or...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: FUNAKI KENICHI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:A build-to-order production process is determined in consideration of magnitude of demand. A lead time calculating section (122) calculates process-specific lead time proportional to the time at which the number of items required to produce the amount of demand for products which are periodically ordered is processed for each process of manufacturing a product and selects a process in the range in which the sum value after the calculated process-specific lead time is added to the travel time between the processes does not exceed the lead time permissible by the client as a build-to-order selection process.