Drilling control

A method can include receiving block position data of a rig prior to addition of a length of pipe to a drillstring, where the drillstring is disposed at least in part in a borehole and supported by the rig; receiving block position data of the rig after addition of the length of pipe to the drillstr...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Meehan, Richard, Belaskie, James
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Meehan, Richard
Belaskie, James
description A method can include receiving block position data of a rig prior to addition of a length of pipe to a drillstring, where the drillstring is disposed at least in part in a borehole and supported by the rig; receiving block position data of the rig after addition of the length of pipe to the drillstring; and controlling position of the drillstring with respect to time using the rig and at least a portion of the block position data for landing a drill bit of the drillstring on a bottom of the borehole.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US11891890B2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US11891890B2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US11891890B23</originalsourceid><addsrcrecordid>eNrjZBBwKcrMycnMS1dIzs8rKcrP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8aHBhoYWlkBk4GRkTIwaALdTH4s</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Drilling control</title><source>esp@cenet</source><creator>Meehan, Richard ; Belaskie, James</creator><creatorcontrib>Meehan, Richard ; Belaskie, James</creatorcontrib><description>A method can include receiving block position data of a rig prior to addition of a length of pipe to a drillstring, where the drillstring is disposed at least in part in a borehole and supported by the rig; receiving block position data of the rig after addition of the length of pipe to the drillstring; and controlling position of the drillstring with respect to time using the rig and at least a portion of the block position data for landing a drill bit of the drillstring on a bottom of the borehole.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2024</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240206&amp;DB=EPODOC&amp;CC=US&amp;NR=11891890B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20240206&amp;DB=EPODOC&amp;CC=US&amp;NR=11891890B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Meehan, Richard</creatorcontrib><creatorcontrib>Belaskie, James</creatorcontrib><title>Drilling control</title><description>A method can include receiving block position data of a rig prior to addition of a length of pipe to a drillstring, where the drillstring is disposed at least in part in a borehole and supported by the rig; receiving block position data of the rig after addition of the length of pipe to the drillstring; and controlling position of the drillstring with respect to time using the rig and at least a portion of the block position data for landing a drill bit of the drillstring on a bottom of the borehole.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2024</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBBwKcrMycnMS1dIzs8rKcrP4WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8aHBhoYWlkBk4GRkTIwaALdTH4s</recordid><startdate>20240206</startdate><enddate>20240206</enddate><creator>Meehan, Richard</creator><creator>Belaskie, James</creator><scope>EVB</scope></search><sort><creationdate>20240206</creationdate><title>Drilling control</title><author>Meehan, Richard ; Belaskie, James</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US11891890B23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2024</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>Meehan, Richard</creatorcontrib><creatorcontrib>Belaskie, James</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Meehan, Richard</au><au>Belaskie, James</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Drilling control</title><date>2024-02-06</date><risdate>2024</risdate><abstract>A method can include receiving block position data of a rig prior to addition of a length of pipe to a drillstring, where the drillstring is disposed at least in part in a borehole and supported by the rig; receiving block position data of the rig after addition of the length of pipe to the drillstring; and controlling position of the drillstring with respect to time using the rig and at least a portion of the block position data for landing a drill bit of the drillstring on a bottom of the borehole.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US11891890B2
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title Drilling control
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-23T11%3A20%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Meehan,%20Richard&rft.date=2024-02-06&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS11891890B2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true