Required time prediction apparatus, control method, and non-transitory storage medium

A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Shinoda, Shigeki, Senda, Yuzo, Inoue, Hirofumi, Sekine, Shigeru, Tominaga, Shin
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Shinoda, Shigeki
Senda, Yuzo
Inoue, Hirofumi
Sekine, Shigeru
Tominaga, Shin
description A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information enabling to determine an assumed departure date and time assuming departure from the departure facility or an assumed arrival date and time assuming arrival at the destination facility. The apparatus (2000) estimates a waiting time at each facility being present between the departure facility and the destination facility, regarding a case of assuming departure from the departure facility at the assumed departure date and time, or a case of assuming arrival at the destination facility at the assumed arrival date and time. Then, the apparatus (2000) computes, based on the estimated waiting time, a predicted required time from departure from the departure facility to arrival at the destination facility.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US11847592B2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US11847592B2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US11847592B23</originalsourceid><addsrcrecordid>eNqNijEOwjAMALMwIOAPZm-HFhCwgkDMQOfKagxEauyQOAO_JwMPYLm74aamu9I7u0gW1HmCUMoN6oQBQ8CImlMFg7BGGcGTvsRWgGyBhWuNyMmpxA-kQnxSWazLfm4mDxwTLX6emeX5dD9eagrSUwo4EJP23a1pduvtZt8e2tU_zxcfYDnm</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Required time prediction apparatus, control method, and non-transitory storage medium</title><source>esp@cenet</source><creator>Shinoda, Shigeki ; Senda, Yuzo ; Inoue, Hirofumi ; Sekine, Shigeru ; Tominaga, Shin</creator><creatorcontrib>Shinoda, Shigeki ; Senda, Yuzo ; Inoue, Hirofumi ; Sekine, Shigeru ; Tominaga, Shin</creatorcontrib><description>A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information enabling to determine an assumed departure date and time assuming departure from the departure facility or an assumed arrival date and time assuming arrival at the destination facility. The apparatus (2000) estimates a waiting time at each facility being present between the departure facility and the destination facility, regarding a case of assuming departure from the departure facility at the assumed departure date and time, or a case of assuming arrival at the destination facility at the assumed arrival date and time. Then, the apparatus (2000) computes, based on the estimated waiting time, a predicted required time from departure from the departure facility to arrival at the destination facility.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231219&amp;DB=EPODOC&amp;CC=US&amp;NR=11847592B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20231219&amp;DB=EPODOC&amp;CC=US&amp;NR=11847592B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Shinoda, Shigeki</creatorcontrib><creatorcontrib>Senda, Yuzo</creatorcontrib><creatorcontrib>Inoue, Hirofumi</creatorcontrib><creatorcontrib>Sekine, Shigeru</creatorcontrib><creatorcontrib>Tominaga, Shin</creatorcontrib><title>Required time prediction apparatus, control method, and non-transitory storage medium</title><description>A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information enabling to determine an assumed departure date and time assuming departure from the departure facility or an assumed arrival date and time assuming arrival at the destination facility. The apparatus (2000) estimates a waiting time at each facility being present between the departure facility and the destination facility, regarding a case of assuming departure from the departure facility at the assumed departure date and time, or a case of assuming arrival at the destination facility at the assumed arrival date and time. Then, the apparatus (2000) computes, based on the estimated waiting time, a predicted required time from departure from the departure facility to arrival at the destination facility.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEOwjAMALMwIOAPZm-HFhCwgkDMQOfKagxEauyQOAO_JwMPYLm74aamu9I7u0gW1HmCUMoN6oQBQ8CImlMFg7BGGcGTvsRWgGyBhWuNyMmpxA-kQnxSWazLfm4mDxwTLX6emeX5dD9eagrSUwo4EJP23a1pduvtZt8e2tU_zxcfYDnm</recordid><startdate>20231219</startdate><enddate>20231219</enddate><creator>Shinoda, Shigeki</creator><creator>Senda, Yuzo</creator><creator>Inoue, Hirofumi</creator><creator>Sekine, Shigeru</creator><creator>Tominaga, Shin</creator><scope>EVB</scope></search><sort><creationdate>20231219</creationdate><title>Required time prediction apparatus, control method, and non-transitory storage medium</title><author>Shinoda, Shigeki ; Senda, Yuzo ; Inoue, Hirofumi ; Sekine, Shigeru ; Tominaga, Shin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US11847592B23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>Shinoda, Shigeki</creatorcontrib><creatorcontrib>Senda, Yuzo</creatorcontrib><creatorcontrib>Inoue, Hirofumi</creatorcontrib><creatorcontrib>Sekine, Shigeru</creatorcontrib><creatorcontrib>Tominaga, Shin</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Shinoda, Shigeki</au><au>Senda, Yuzo</au><au>Inoue, Hirofumi</au><au>Sekine, Shigeru</au><au>Tominaga, Shin</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Required time prediction apparatus, control method, and non-transitory storage medium</title><date>2023-12-19</date><risdate>2023</risdate><abstract>A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information enabling to determine an assumed departure date and time assuming departure from the departure facility or an assumed arrival date and time assuming arrival at the destination facility. The apparatus (2000) estimates a waiting time at each facility being present between the departure facility and the destination facility, regarding a case of assuming departure from the departure facility at the assumed departure date and time, or a case of assuming arrival at the destination facility at the assumed arrival date and time. Then, the apparatus (2000) computes, based on the estimated waiting time, a predicted required time from departure from the departure facility to arrival at the destination facility.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_US11847592B2
source esp@cenet
subjects CALCULATING
COMPUTING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
PHYSICS
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
title Required time prediction apparatus, control method, and non-transitory storage medium
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T06%3A09%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Shinoda,%20Shigeki&rft.date=2023-12-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS11847592B2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true