Required time prediction apparatus, control method, and non-transitory storage medium
A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Shinoda, Shigeki Senda, Yuzo Inoue, Hirofumi Sekine, Shigeru Tominaga, Shin |
description | A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information enabling to determine an assumed departure date and time assuming departure from the departure facility or an assumed arrival date and time assuming arrival at the destination facility. The apparatus (2000) estimates a waiting time at each facility being present between the departure facility and the destination facility, regarding a case of assuming departure from the departure facility at the assumed departure date and time, or a case of assuming arrival at the destination facility at the assumed arrival date and time. Then, the apparatus (2000) computes, based on the estimated waiting time, a predicted required time from departure from the departure facility to arrival at the destination facility. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US11847592B2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US11847592B2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US11847592B23</originalsourceid><addsrcrecordid>eNqNijEOwjAMALMwIOAPZm-HFhCwgkDMQOfKagxEauyQOAO_JwMPYLm74aamu9I7u0gW1HmCUMoN6oQBQ8CImlMFg7BGGcGTvsRWgGyBhWuNyMmpxA-kQnxSWazLfm4mDxwTLX6emeX5dD9eagrSUwo4EJP23a1pduvtZt8e2tU_zxcfYDnm</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Required time prediction apparatus, control method, and non-transitory storage medium</title><source>esp@cenet</source><creator>Shinoda, Shigeki ; Senda, Yuzo ; Inoue, Hirofumi ; Sekine, Shigeru ; Tominaga, Shin</creator><creatorcontrib>Shinoda, Shigeki ; Senda, Yuzo ; Inoue, Hirofumi ; Sekine, Shigeru ; Tominaga, Shin</creatorcontrib><description>A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information enabling to determine an assumed departure date and time assuming departure from the departure facility or an assumed arrival date and time assuming arrival at the destination facility. The apparatus (2000) estimates a waiting time at each facility being present between the departure facility and the destination facility, regarding a case of assuming departure from the departure facility at the assumed departure date and time, or a case of assuming arrival at the destination facility at the assumed arrival date and time. Then, the apparatus (2000) computes, based on the estimated waiting time, a predicted required time from departure from the departure facility to arrival at the destination facility.</description><language>eng</language><subject>CALCULATING ; COMPUTING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; PHYSICS ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231219&DB=EPODOC&CC=US&NR=11847592B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,777,882,25545,76296</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20231219&DB=EPODOC&CC=US&NR=11847592B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Shinoda, Shigeki</creatorcontrib><creatorcontrib>Senda, Yuzo</creatorcontrib><creatorcontrib>Inoue, Hirofumi</creatorcontrib><creatorcontrib>Sekine, Shigeru</creatorcontrib><creatorcontrib>Tominaga, Shin</creatorcontrib><title>Required time prediction apparatus, control method, and non-transitory storage medium</title><description>A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information enabling to determine an assumed departure date and time assuming departure from the departure facility or an assumed arrival date and time assuming arrival at the destination facility. The apparatus (2000) estimates a waiting time at each facility being present between the departure facility and the destination facility, regarding a case of assuming departure from the departure facility at the assumed departure date and time, or a case of assuming arrival at the destination facility at the assumed arrival date and time. Then, the apparatus (2000) computes, based on the estimated waiting time, a predicted required time from departure from the departure facility to arrival at the destination facility.</description><subject>CALCULATING</subject><subject>COMPUTING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>PHYSICS</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNijEOwjAMALMwIOAPZm-HFhCwgkDMQOfKagxEauyQOAO_JwMPYLm74aamu9I7u0gW1HmCUMoN6oQBQ8CImlMFg7BGGcGTvsRWgGyBhWuNyMmpxA-kQnxSWazLfm4mDxwTLX6emeX5dD9eagrSUwo4EJP23a1pduvtZt8e2tU_zxcfYDnm</recordid><startdate>20231219</startdate><enddate>20231219</enddate><creator>Shinoda, Shigeki</creator><creator>Senda, Yuzo</creator><creator>Inoue, Hirofumi</creator><creator>Sekine, Shigeru</creator><creator>Tominaga, Shin</creator><scope>EVB</scope></search><sort><creationdate>20231219</creationdate><title>Required time prediction apparatus, control method, and non-transitory storage medium</title><author>Shinoda, Shigeki ; Senda, Yuzo ; Inoue, Hirofumi ; Sekine, Shigeru ; Tominaga, Shin</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US11847592B23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2023</creationdate><topic>CALCULATING</topic><topic>COMPUTING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>PHYSICS</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><toplevel>online_resources</toplevel><creatorcontrib>Shinoda, Shigeki</creatorcontrib><creatorcontrib>Senda, Yuzo</creatorcontrib><creatorcontrib>Inoue, Hirofumi</creatorcontrib><creatorcontrib>Sekine, Shigeru</creatorcontrib><creatorcontrib>Tominaga, Shin</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Shinoda, Shigeki</au><au>Senda, Yuzo</au><au>Inoue, Hirofumi</au><au>Sekine, Shigeru</au><au>Tominaga, Shin</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Required time prediction apparatus, control method, and non-transitory storage medium</title><date>2023-12-19</date><risdate>2023</risdate><abstract>A required time prediction apparatus (2000) acquires utilization facility information and assumed date and time information. The utilization facility information is information enabling to determine a departure facility and a destination facility. The assumed date and time information is information enabling to determine an assumed departure date and time assuming departure from the departure facility or an assumed arrival date and time assuming arrival at the destination facility. The apparatus (2000) estimates a waiting time at each facility being present between the departure facility and the destination facility, regarding a case of assuming departure from the departure facility at the assumed departure date and time, or a case of assuming arrival at the destination facility at the assumed arrival date and time. Then, the apparatus (2000) computes, based on the estimated waiting time, a predicted required time from departure from the departure facility to arrival at the destination facility.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US11847592B2 |
source | esp@cenet |
subjects | CALCULATING COMPUTING COUNTING DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES PHYSICS SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR |
title | Required time prediction apparatus, control method, and non-transitory storage medium |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-19T06%3A09%3A18IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Shinoda,%20Shigeki&rft.date=2023-12-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS11847592B2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |