Construction building equipment and construction method thereof
A construction building equipment includes hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns. The multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall. The sleeve frames and the track columns are...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Xu, Guowei Liu, Heng Wang, Lei Tian, Xisheng Liu, Hanwen Qian, Shiqing Wang, Haonan Xu, Liai Li, Jin Li, Di Wen, Shilong Wang, Wei Deng, Huiwen Ding, Weixiang Wang, Jun Zhao, Yanhua Zhang, Zhihua Liu, Xiaoqing Chen, Dong Lu, Huayong Zhu, Leilei Zhang, Buyue |
description | A construction building equipment includes hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns. The multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall. The sleeve frames and the track columns are clamped on the hanging pedestals. The sleeve frames are clamped on outer sides of the track columns. The lower reversing boxes are fixed at upper ends of the sleeve frames. The hydraulic cylinders are connected with the upper reversing boxes and the lower reversing boxes. Side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes. Upper ends of the track columns are fixedly connected with a top platform. Hangers and formworks are suspended on the top platform through booms. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US11655641B2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US11655641B2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US11655641B23</originalsourceid><addsrcrecordid>eNrjZLB3zs8rLikqTS7JzM9TSCrNzEnJzEtXSC0szSzITc0rUUjMS1FIRlaTm1qSkZ-iUJKRWpSan8bDwJqWmFOcyguluRkU3VxDnD10Uwvy41OLCxKTU_NSS-JDgw0NzUxNzUwMnYyMiVEDABCQMhE</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Construction building equipment and construction method thereof</title><source>esp@cenet</source><creator>Xu, Guowei ; Liu, Heng ; Wang, Lei ; Tian, Xisheng ; Liu, Hanwen ; Qian, Shiqing ; Wang, Haonan ; Xu, Liai ; Li, Jin ; Li, Di ; Wen, Shilong ; Wang, Wei ; Deng, Huiwen ; Ding, Weixiang ; Wang, Jun ; Zhao, Yanhua ; Zhang, Zhihua ; Liu, Xiaoqing ; Chen, Dong ; Lu, Huayong ; Zhu, Leilei ; Zhang, Buyue</creator><creatorcontrib>Xu, Guowei ; Liu, Heng ; Wang, Lei ; Tian, Xisheng ; Liu, Hanwen ; Qian, Shiqing ; Wang, Haonan ; Xu, Liai ; Li, Jin ; Li, Di ; Wen, Shilong ; Wang, Wei ; Deng, Huiwen ; Ding, Weixiang ; Wang, Jun ; Zhao, Yanhua ; Zhang, Zhihua ; Liu, Xiaoqing ; Chen, Dong ; Lu, Huayong ; Zhu, Leilei ; Zhang, Buyue</creatorcontrib><description>A construction building equipment includes hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns. The multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall. The sleeve frames and the track columns are clamped on the hanging pedestals. The sleeve frames are clamped on outer sides of the track columns. The lower reversing boxes are fixed at upper ends of the sleeve frames. The hydraulic cylinders are connected with the upper reversing boxes and the lower reversing boxes. Side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes. Upper ends of the track columns are fixedly connected with a top platform. Hangers and formworks are suspended on the top platform through booms.</description><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; FIXED CONSTRUCTIONS ; FORMS ; HANDLING BUILDING MATERIALS ON THE SITE ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SHUTTERING</subject><creationdate>2023</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230523&DB=EPODOC&CC=US&NR=11655641B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20230523&DB=EPODOC&CC=US&NR=11655641B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Xu, Guowei</creatorcontrib><creatorcontrib>Liu, Heng</creatorcontrib><creatorcontrib>Wang, Lei</creatorcontrib><creatorcontrib>Tian, Xisheng</creatorcontrib><creatorcontrib>Liu, Hanwen</creatorcontrib><creatorcontrib>Qian, Shiqing</creatorcontrib><creatorcontrib>Wang, Haonan</creatorcontrib><creatorcontrib>Xu, Liai</creatorcontrib><creatorcontrib>Li, Jin</creatorcontrib><creatorcontrib>Li, Di</creatorcontrib><creatorcontrib>Wen, Shilong</creatorcontrib><creatorcontrib>Wang, Wei</creatorcontrib><creatorcontrib>Deng, Huiwen</creatorcontrib><creatorcontrib>Ding, Weixiang</creatorcontrib><creatorcontrib>Wang, Jun</creatorcontrib><creatorcontrib>Zhao, Yanhua</creatorcontrib><creatorcontrib>Zhang, Zhihua</creatorcontrib><creatorcontrib>Liu, Xiaoqing</creatorcontrib><creatorcontrib>Chen, Dong</creatorcontrib><creatorcontrib>Lu, Huayong</creatorcontrib><creatorcontrib>Zhu, Leilei</creatorcontrib><creatorcontrib>Zhang, Buyue</creatorcontrib><title>Construction building equipment and construction method thereof</title><description>A construction building equipment includes hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns. The multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall. The sleeve frames and the track columns are clamped on the hanging pedestals. The sleeve frames are clamped on outer sides of the track columns. The lower reversing boxes are fixed at upper ends of the sleeve frames. The hydraulic cylinders are connected with the upper reversing boxes and the lower reversing boxes. Side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes. Upper ends of the track columns are fixedly connected with a top platform. Hangers and formworks are suspended on the top platform through booms.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2023</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB3zs8rLikqTS7JzM9TSCrNzEnJzEtXSC0szSzITc0rUUjMS1FIRlaTm1qSkZ-iUJKRWpSan8bDwJqWmFOcyguluRkU3VxDnD10Uwvy41OLCxKTU_NSS-JDgw0NzUxNzUwMnYyMiVEDABCQMhE</recordid><startdate>20230523</startdate><enddate>20230523</enddate><creator>Xu, Guowei</creator><creator>Liu, Heng</creator><creator>Wang, Lei</creator><creator>Tian, Xisheng</creator><creator>Liu, Hanwen</creator><creator>Qian, Shiqing</creator><creator>Wang, Haonan</creator><creator>Xu, Liai</creator><creator>Li, Jin</creator><creator>Li, Di</creator><creator>Wen, Shilong</creator><creator>Wang, Wei</creator><creator>Deng, Huiwen</creator><creator>Ding, Weixiang</creator><creator>Wang, Jun</creator><creator>Zhao, Yanhua</creator><creator>Zhang, Zhihua</creator><creator>Liu, Xiaoqing</creator><creator>Chen, Dong</creator><creator>Lu, Huayong</creator><creator>Zhu, Leilei</creator><creator>Zhang, Buyue</creator><scope>EVB</scope></search><sort><creationdate>20230523</creationdate><title>Construction building equipment and construction method thereof</title><author>Xu, Guowei ; Liu, Heng ; Wang, Lei ; Tian, Xisheng ; Liu, Hanwen ; Qian, Shiqing ; Wang, Haonan ; Xu, Liai ; Li, Jin ; Li, Di ; Wen, Shilong ; Wang, Wei ; Deng, Huiwen ; Ding, Weixiang ; Wang, Jun ; Zhao, Yanhua ; Zhang, Zhihua ; Liu, Xiaoqing ; Chen, Dong ; Lu, Huayong ; Zhu, Leilei ; Zhang, Buyue</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US11655641B23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2023</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><toplevel>online_resources</toplevel><creatorcontrib>Xu, Guowei</creatorcontrib><creatorcontrib>Liu, Heng</creatorcontrib><creatorcontrib>Wang, Lei</creatorcontrib><creatorcontrib>Tian, Xisheng</creatorcontrib><creatorcontrib>Liu, Hanwen</creatorcontrib><creatorcontrib>Qian, Shiqing</creatorcontrib><creatorcontrib>Wang, Haonan</creatorcontrib><creatorcontrib>Xu, Liai</creatorcontrib><creatorcontrib>Li, Jin</creatorcontrib><creatorcontrib>Li, Di</creatorcontrib><creatorcontrib>Wen, Shilong</creatorcontrib><creatorcontrib>Wang, Wei</creatorcontrib><creatorcontrib>Deng, Huiwen</creatorcontrib><creatorcontrib>Ding, Weixiang</creatorcontrib><creatorcontrib>Wang, Jun</creatorcontrib><creatorcontrib>Zhao, Yanhua</creatorcontrib><creatorcontrib>Zhang, Zhihua</creatorcontrib><creatorcontrib>Liu, Xiaoqing</creatorcontrib><creatorcontrib>Chen, Dong</creatorcontrib><creatorcontrib>Lu, Huayong</creatorcontrib><creatorcontrib>Zhu, Leilei</creatorcontrib><creatorcontrib>Zhang, Buyue</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Xu, Guowei</au><au>Liu, Heng</au><au>Wang, Lei</au><au>Tian, Xisheng</au><au>Liu, Hanwen</au><au>Qian, Shiqing</au><au>Wang, Haonan</au><au>Xu, Liai</au><au>Li, Jin</au><au>Li, Di</au><au>Wen, Shilong</au><au>Wang, Wei</au><au>Deng, Huiwen</au><au>Ding, Weixiang</au><au>Wang, Jun</au><au>Zhao, Yanhua</au><au>Zhang, Zhihua</au><au>Liu, Xiaoqing</au><au>Chen, Dong</au><au>Lu, Huayong</au><au>Zhu, Leilei</au><au>Zhang, Buyue</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Construction building equipment and construction method thereof</title><date>2023-05-23</date><risdate>2023</risdate><abstract>A construction building equipment includes hanging pedestals, sleeve frames, hydraulic cylinders, upper reversing boxes, lower reversing boxes and track columns. The multiple hanging pedestals are fixed on an outer side of a shear wall of an external wall. The sleeve frames and the track columns are clamped on the hanging pedestals. The sleeve frames are clamped on outer sides of the track columns. The lower reversing boxes are fixed at upper ends of the sleeve frames. The hydraulic cylinders are connected with the upper reversing boxes and the lower reversing boxes. Side surfaces of the track columns are provided with pane holes for cooperative climbing of the upper reversing boxes and the lower reversing boxes. Upper ends of the track columns are fixedly connected with a top platform. Hangers and formworks are suspended on the top platform through booms.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US11655641B2 |
source | esp@cenet |
subjects | BUILDING BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE FIXED CONSTRUCTIONS FORMS HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS SCAFFOLDING SHUTTERING |
title | Construction building equipment and construction method thereof |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-06T08%3A20%3A36IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Xu,%20Guowei&rft.date=2023-05-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS11655641B2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |