High pressure test pump system for offshore cementing skid
A high pressure fluid pump system of a fluid injection system includes a large volume displacement system, having a large volume pump, and low volume displacement system, having a low volume pump, a programmable logic control (PLC) computer coupled with each displacement system. The large volume dis...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Hall, Randall Turner Imel, Chip L Cline, Gary Lee Sneed, Craig A |
description | A high pressure fluid pump system of a fluid injection system includes a large volume displacement system, having a large volume pump, and low volume displacement system, having a low volume pump, a programmable logic control (PLC) computer coupled with each displacement system. The large volume displacement system is configured to incrementally or continuously increase a pressure of a fluid in a downhole to a predetermined pressure setting below a maximum pressure setting, and the low volume displacement system is configured to increase the pressure of the fluid from the predetermined pressure setting to a pressure setting above the predetermined pressure setting and at or below the maximum pressure setting. The functioning of the high pressure fluid pump system can be monitored, controlled and tested by the PLC computer. One or more graphical user interfaces can be coupled to the PLC computer for user input. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US11060366B2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US11060366B2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US11060366B23</originalsourceid><addsrcrecordid>eNrjZLDyyEzPUCgoSi0uLi1KVShJLS5RKCjNLVAoriwuSc1VSMsvUshPSyvOyAfKJqfmpuaVZOalKxRnZ6bwMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JL40GBDQwMzA2MzMycjY2LUAACX5y9r</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>High pressure test pump system for offshore cementing skid</title><source>esp@cenet</source><creator>Hall, Randall Turner ; Imel, Chip L ; Cline, Gary Lee ; Sneed, Craig A</creator><creatorcontrib>Hall, Randall Turner ; Imel, Chip L ; Cline, Gary Lee ; Sneed, Craig A</creatorcontrib><description>A high pressure fluid pump system of a fluid injection system includes a large volume displacement system, having a large volume pump, and low volume displacement system, having a low volume pump, a programmable logic control (PLC) computer coupled with each displacement system. The large volume displacement system is configured to incrementally or continuously increase a pressure of a fluid in a downhole to a predetermined pressure setting below a maximum pressure setting, and the low volume displacement system is configured to increase the pressure of the fluid from the predetermined pressure setting to a pressure setting above the predetermined pressure setting and at or below the maximum pressure setting. The functioning of the high pressure fluid pump system can be monitored, controlled and tested by the PLC computer. One or more graphical user interfaces can be coupled to the PLC computer for user input.</description><language>eng</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210713&DB=EPODOC&CC=US&NR=11060366B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20210713&DB=EPODOC&CC=US&NR=11060366B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Hall, Randall Turner</creatorcontrib><creatorcontrib>Imel, Chip L</creatorcontrib><creatorcontrib>Cline, Gary Lee</creatorcontrib><creatorcontrib>Sneed, Craig A</creatorcontrib><title>High pressure test pump system for offshore cementing skid</title><description>A high pressure fluid pump system of a fluid injection system includes a large volume displacement system, having a large volume pump, and low volume displacement system, having a low volume pump, a programmable logic control (PLC) computer coupled with each displacement system. The large volume displacement system is configured to incrementally or continuously increase a pressure of a fluid in a downhole to a predetermined pressure setting below a maximum pressure setting, and the low volume displacement system is configured to increase the pressure of the fluid from the predetermined pressure setting to a pressure setting above the predetermined pressure setting and at or below the maximum pressure setting. The functioning of the high pressure fluid pump system can be monitored, controlled and tested by the PLC computer. One or more graphical user interfaces can be coupled to the PLC computer for user input.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLDyyEzPUCgoSi0uLi1KVShJLS5RKCjNLVAoriwuSc1VSMsvUshPSyvOyAfKJqfmpuaVZOalKxRnZ6bwMLCmJeYUp_JCaW4GRTfXEGcP3dSC_PjU4oLE5NS81JL40GBDQwMzA2MzMycjY2LUAACX5y9r</recordid><startdate>20210713</startdate><enddate>20210713</enddate><creator>Hall, Randall Turner</creator><creator>Imel, Chip L</creator><creator>Cline, Gary Lee</creator><creator>Sneed, Craig A</creator><scope>EVB</scope></search><sort><creationdate>20210713</creationdate><title>High pressure test pump system for offshore cementing skid</title><author>Hall, Randall Turner ; Imel, Chip L ; Cline, Gary Lee ; Sneed, Craig A</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US11060366B23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2021</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>Hall, Randall Turner</creatorcontrib><creatorcontrib>Imel, Chip L</creatorcontrib><creatorcontrib>Cline, Gary Lee</creatorcontrib><creatorcontrib>Sneed, Craig A</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Hall, Randall Turner</au><au>Imel, Chip L</au><au>Cline, Gary Lee</au><au>Sneed, Craig A</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>High pressure test pump system for offshore cementing skid</title><date>2021-07-13</date><risdate>2021</risdate><abstract>A high pressure fluid pump system of a fluid injection system includes a large volume displacement system, having a large volume pump, and low volume displacement system, having a low volume pump, a programmable logic control (PLC) computer coupled with each displacement system. The large volume displacement system is configured to incrementally or continuously increase a pressure of a fluid in a downhole to a predetermined pressure setting below a maximum pressure setting, and the low volume displacement system is configured to increase the pressure of the fluid from the predetermined pressure setting to a pressure setting above the predetermined pressure setting and at or below the maximum pressure setting. The functioning of the high pressure fluid pump system can be monitored, controlled and tested by the PLC computer. One or more graphical user interfaces can be coupled to the PLC computer for user input.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US11060366B2 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | High pressure test pump system for offshore cementing skid |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-19T02%3A09%3A32IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Hall,%20Randall%20Turner&rft.date=2021-07-13&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS11060366B2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |