System for controlling or monitoring a vehicle system along a route
A method includes generating a trip plan that dictates operational settings to be implemented by a vehicle system moving along a route. The trip plan is based on a temporary work order issued for a restricted segment of the route. The work order provides a maximum speed through the restricted segmen...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Paritosh, Prakarsh Wakeman, Joseph Daniel Schoonmaker, William Cherrick Sharma, Ankit Hrdlicka, Kaitlyn Ann Eldredge, David Allen Thiyagarajan, Saravanan |
description | A method includes generating a trip plan that dictates operational settings to be implemented by a vehicle system moving along a route. The trip plan is based on a temporary work order issued for a restricted segment of the route. The work order provides a maximum speed through the restricted segment for a limited time period that is expressed using a time standard. One or more of the operational settings of the trip plan specify movement of the vehicle system through the restricted segment at a vehicle speed that is less than or equal to the maximum speed. In response to determining that the temporary work order has expired, the method includes at least one of prompting an operator of the vehicle system to confirm that the work order has expired or generating a new trip plan in which the vehicle system exceeds the maximum speed through the restricted segment. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_US10279823B2</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>US10279823B2</sourcerecordid><originalsourceid>FETCH-epo_espacenet_US10279823B23</originalsourceid><addsrcrecordid>eNrjZHAOriwuSc1VSMsvUkjOzyspys_JycxLVwByc_PzMkvyi0C8RIWy1IzM5JxUhWKI8sScfLBwUX5pSSoPA2taYk5xKi-U5mZQdHMNcfbQTS3Ij08tLkhMTs1LLYkPDTY0MDK3tDAydjIyJkYNAJrzMsM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>System for controlling or monitoring a vehicle system along a route</title><source>esp@cenet</source><creator>Paritosh, Prakarsh ; Wakeman, Joseph Daniel ; Schoonmaker, William Cherrick ; Sharma, Ankit ; Hrdlicka, Kaitlyn Ann ; Eldredge, David Allen ; Thiyagarajan, Saravanan</creator><creatorcontrib>Paritosh, Prakarsh ; Wakeman, Joseph Daniel ; Schoonmaker, William Cherrick ; Sharma, Ankit ; Hrdlicka, Kaitlyn Ann ; Eldredge, David Allen ; Thiyagarajan, Saravanan</creatorcontrib><description>A method includes generating a trip plan that dictates operational settings to be implemented by a vehicle system moving along a route. The trip plan is based on a temporary work order issued for a restricted segment of the route. The work order provides a maximum speed through the restricted segment for a limited time period that is expressed using a time standard. One or more of the operational settings of the trip plan specify movement of the vehicle system through the restricted segment at a vehicle speed that is less than or equal to the maximum speed. In response to determining that the temporary work order has expired, the method includes at least one of prompting an operator of the vehicle system to confirm that the work order has expired or generating a new trip plan in which the vehicle system exceeds the maximum speed through the restricted segment.</description><language>eng</language><subject>ENSURING THE SAFETY OF RAILWAY TRAFFIC ; GUIDING RAILWAY TRAFFIC ; PERFORMING OPERATIONS ; RAILWAYS ; TRANSPORTING</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190507&DB=EPODOC&CC=US&NR=10279823B2$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76516</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20190507&DB=EPODOC&CC=US&NR=10279823B2$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Paritosh, Prakarsh</creatorcontrib><creatorcontrib>Wakeman, Joseph Daniel</creatorcontrib><creatorcontrib>Schoonmaker, William Cherrick</creatorcontrib><creatorcontrib>Sharma, Ankit</creatorcontrib><creatorcontrib>Hrdlicka, Kaitlyn Ann</creatorcontrib><creatorcontrib>Eldredge, David Allen</creatorcontrib><creatorcontrib>Thiyagarajan, Saravanan</creatorcontrib><title>System for controlling or monitoring a vehicle system along a route</title><description>A method includes generating a trip plan that dictates operational settings to be implemented by a vehicle system moving along a route. The trip plan is based on a temporary work order issued for a restricted segment of the route. The work order provides a maximum speed through the restricted segment for a limited time period that is expressed using a time standard. One or more of the operational settings of the trip plan specify movement of the vehicle system through the restricted segment at a vehicle speed that is less than or equal to the maximum speed. In response to determining that the temporary work order has expired, the method includes at least one of prompting an operator of the vehicle system to confirm that the work order has expired or generating a new trip plan in which the vehicle system exceeds the maximum speed through the restricted segment.</description><subject>ENSURING THE SAFETY OF RAILWAY TRAFFIC</subject><subject>GUIDING RAILWAY TRAFFIC</subject><subject>PERFORMING OPERATIONS</subject><subject>RAILWAYS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAOriwuSc1VSMsvUkjOzyspys_JycxLVwByc_PzMkvyi0C8RIWy1IzM5JxUhWKI8sScfLBwUX5pSSoPA2taYk5xKi-U5mZQdHMNcfbQTS3Ij08tLkhMTs1LLYkPDTY0MDK3tDAydjIyJkYNAJrzMsM</recordid><startdate>20190507</startdate><enddate>20190507</enddate><creator>Paritosh, Prakarsh</creator><creator>Wakeman, Joseph Daniel</creator><creator>Schoonmaker, William Cherrick</creator><creator>Sharma, Ankit</creator><creator>Hrdlicka, Kaitlyn Ann</creator><creator>Eldredge, David Allen</creator><creator>Thiyagarajan, Saravanan</creator><scope>EVB</scope></search><sort><creationdate>20190507</creationdate><title>System for controlling or monitoring a vehicle system along a route</title><author>Paritosh, Prakarsh ; Wakeman, Joseph Daniel ; Schoonmaker, William Cherrick ; Sharma, Ankit ; Hrdlicka, Kaitlyn Ann ; Eldredge, David Allen ; Thiyagarajan, Saravanan</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_US10279823B23</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2019</creationdate><topic>ENSURING THE SAFETY OF RAILWAY TRAFFIC</topic><topic>GUIDING RAILWAY TRAFFIC</topic><topic>PERFORMING OPERATIONS</topic><topic>RAILWAYS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>Paritosh, Prakarsh</creatorcontrib><creatorcontrib>Wakeman, Joseph Daniel</creatorcontrib><creatorcontrib>Schoonmaker, William Cherrick</creatorcontrib><creatorcontrib>Sharma, Ankit</creatorcontrib><creatorcontrib>Hrdlicka, Kaitlyn Ann</creatorcontrib><creatorcontrib>Eldredge, David Allen</creatorcontrib><creatorcontrib>Thiyagarajan, Saravanan</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Paritosh, Prakarsh</au><au>Wakeman, Joseph Daniel</au><au>Schoonmaker, William Cherrick</au><au>Sharma, Ankit</au><au>Hrdlicka, Kaitlyn Ann</au><au>Eldredge, David Allen</au><au>Thiyagarajan, Saravanan</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>System for controlling or monitoring a vehicle system along a route</title><date>2019-05-07</date><risdate>2019</risdate><abstract>A method includes generating a trip plan that dictates operational settings to be implemented by a vehicle system moving along a route. The trip plan is based on a temporary work order issued for a restricted segment of the route. The work order provides a maximum speed through the restricted segment for a limited time period that is expressed using a time standard. One or more of the operational settings of the trip plan specify movement of the vehicle system through the restricted segment at a vehicle speed that is less than or equal to the maximum speed. In response to determining that the temporary work order has expired, the method includes at least one of prompting an operator of the vehicle system to confirm that the work order has expired or generating a new trip plan in which the vehicle system exceeds the maximum speed through the restricted segment.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_US10279823B2 |
source | esp@cenet |
subjects | ENSURING THE SAFETY OF RAILWAY TRAFFIC GUIDING RAILWAY TRAFFIC PERFORMING OPERATIONS RAILWAYS TRANSPORTING |
title | System for controlling or monitoring a vehicle system along a route |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-14T03%3A06%3A30IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Paritosh,%20Prakarsh&rft.date=2019-05-07&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EUS10279823B2%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |