METHOD FOR DEVELOPMENT WORKING AT CONSTRUCTION OF SUBSTRUCTURES
A method for development working at construction of substructures includes drifting with cross section of arched form, at that form of cross section of working is arranged as a truncated ellipse with its cut coinciding with floor of the working, and center is placed at distance from floor, at that l...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus ; ukr |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Zusammenfassung: | A method for development working at construction of substructures includes drifting with cross section of arched form, at that form of cross section of working is arranged as a truncated ellipse with its cut coinciding with floor of the working, and center is placed at distance from floor, at that large axis of ellipse is directed at angle to dip line.
Способ проведения подготовительной выработки при построении подземных сооружений, который включает проходку горизонтальной выработки с поперечным сечением сводчатой формы, причем форму поперечного сечения выработки выполняют в виде усеченного эллипса, срез которого совпадает с подошвой выработки, а его центр размещают на расстоянии 1,2 м от подошвы, при этом большую ось эллипса направляют под углом к линии падения пласта.
Спосіб проведення підготовчої виробки при побудові підземних споруд, що включає проходження горизонтальної виробки з поперечним перерізом склепінчастої форми, причому форму поперечного перерізу виробки виконують у вигляді зрізаного еліпса, зріз якого збігається з підошвою виробки, а його центр розміщують на відстані від підошви, при цьому велику вісь еліпса спрямовують під кутом до лінії падіння пласта. |
---|