WATER PASSING STRUCTURE UNDER EMBANKMENT
FIELD: water passing structures construction. SUBSTANCE: structure under embankment is mounted in the following way. Preliminary to provide conveniences to exercise works, at distance of 15 - 20 meters up the spring 3 advanced pit is dug ( Figure does not show it) and running spring 3 is partitioned...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | BURDEJNYJ V.M SPIRIDOVICH E.A LISIN I.V LISIN V.N JAKOVLEV A.JA BEREZIN S.S |
description | FIELD: water passing structures construction. SUBSTANCE: structure under embankment is mounted in the following way. Preliminary to provide conveniences to exercise works, at distance of 15 - 20 meters up the spring 3 advanced pit is dug ( Figure does not show it) and running spring 3 is partitioned. Using water pumping out equipment water is transferred to other side of pipeline 4. Flexible canal 1 is laid in dried spring mouth 3 and using cable (Figure does not show it) located under pipe 4 canal 1 is drawn down the spring 3 current till canal ends are equally spaced from center of pipe 4. Then caps 2 are introduced from butts of flexible canal 1 butts. Flexible water passing canal 1 is tightly pressed to spring 3 bottom along lower part of half-perimeter of pipe 4. On top of canal 1 and pipe 4 beginning from its center sheet 5 of nonwoven synthetic material is laid with pressing ends 6 pressed by ground and after that whole open area of pipe 4 is blanketed by ground of 0.8 - 1.0 meter thick over upper generatrix of pipe 4. EFFECT: water passing structure allows to preserve insulation, to avoid labour consumption to provide water passing in case there is laid in embankment pipeline for medium with positive temperature. 2 dwg
Водопропускное сооружение под насыпью монтируют следующим образом. Предварительно для удобства производства работ за 15-20 м от трубопровода вверх по течению ручья 3 выкапывают приямок и перегораживают действующий ручей. Водоотливной техникой накапливающую воду в приямке отводят на другую сторону трубопровода 4. В осушенном русле ручья 3 раскладывают эластичный канал 1 и посредством троса, находящимся под трубой 4, канал 1 протаскивают вниз по течению ручья 3 до равного удаления концов канала от центра трубы 4. Затем с торцов эластичного канала 1 заводят оголовки 2. Эластичный водопропускной канал 1 плотно прижимают к дну ручья 3 по нижней части полупериметра трубы 4. По верху эластичного канала 1 и трубы 4 от ее центра раскладывают полотнище 5 из нетканого синтетического материала с защемлением концов грунтом 6, после чего весь открытый участок трубы 4 засыпают грунтом на 0,8-1,0 м от верхней образующей трубы 4. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU95101592A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU95101592A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU95101592A3</originalsourceid><addsrcrecordid>eNrjZNAIdwxxDVIIcAwO9vRzVwgOCQp1DgkNclUI9XMBirv6Ojn6efu6-oXwMLCmJeYUp_JCaW4GBTfXEGcP3dSC_PjU4oLE5NS81JL4oFBLU0MDQ1NLI0djIpQAAOXBJCI</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>WATER PASSING STRUCTURE UNDER EMBANKMENT</title><source>esp@cenet</source><creator>BURDEJNYJ V.M ; SPIRIDOVICH E.A ; LISIN I.V ; LISIN V.N ; JAKOVLEV A.JA ; BEREZIN S.S</creator><creatorcontrib>BURDEJNYJ V.M ; SPIRIDOVICH E.A ; LISIN I.V ; LISIN V.N ; JAKOVLEV A.JA ; BEREZIN S.S</creatorcontrib><description>FIELD: water passing structures construction. SUBSTANCE: structure under embankment is mounted in the following way. Preliminary to provide conveniences to exercise works, at distance of 15 - 20 meters up the spring 3 advanced pit is dug ( Figure does not show it) and running spring 3 is partitioned. Using water pumping out equipment water is transferred to other side of pipeline 4. Flexible canal 1 is laid in dried spring mouth 3 and using cable (Figure does not show it) located under pipe 4 canal 1 is drawn down the spring 3 current till canal ends are equally spaced from center of pipe 4. Then caps 2 are introduced from butts of flexible canal 1 butts. Flexible water passing canal 1 is tightly pressed to spring 3 bottom along lower part of half-perimeter of pipe 4. On top of canal 1 and pipe 4 beginning from its center sheet 5 of nonwoven synthetic material is laid with pressing ends 6 pressed by ground and after that whole open area of pipe 4 is blanketed by ground of 0.8 - 1.0 meter thick over upper generatrix of pipe 4. EFFECT: water passing structure allows to preserve insulation, to avoid labour consumption to provide water passing in case there is laid in embankment pipeline for medium with positive temperature. 2 dwg
Водопропускное сооружение под насыпью монтируют следующим образом. Предварительно для удобства производства работ за 15-20 м от трубопровода вверх по течению ручья 3 выкапывают приямок и перегораживают действующий ручей. Водоотливной техникой накапливающую воду в приямке отводят на другую сторону трубопровода 4. В осушенном русле ручья 3 раскладывают эластичный канал 1 и посредством троса, находящимся под трубой 4, канал 1 протаскивают вниз по течению ручья 3 до равного удаления концов канала от центра трубы 4. Затем с торцов эластичного канала 1 заводят оголовки 2. Эластичный водопропускной канал 1 плотно прижимают к дну ручья 3 по нижней части полупериметра трубы 4. По верху эластичного канала 1 и трубы 4 от ее центра раскладывают полотнище 5 из нетканого синтетического материала с защемлением концов грунтом 6, после чего весь открытый участок трубы 4 засыпают грунтом на 0,8-1,0 м от верхней образующей трубы 4.</description><language>eng ; rus</language><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS</subject><creationdate>1996</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19960810&DB=EPODOC&CC=RU&NR=95101592A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19960810&DB=EPODOC&CC=RU&NR=95101592A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>BURDEJNYJ V.M</creatorcontrib><creatorcontrib>SPIRIDOVICH E.A</creatorcontrib><creatorcontrib>LISIN I.V</creatorcontrib><creatorcontrib>LISIN V.N</creatorcontrib><creatorcontrib>JAKOVLEV A.JA</creatorcontrib><creatorcontrib>BEREZIN S.S</creatorcontrib><title>WATER PASSING STRUCTURE UNDER EMBANKMENT</title><description>FIELD: water passing structures construction. SUBSTANCE: structure under embankment is mounted in the following way. Preliminary to provide conveniences to exercise works, at distance of 15 - 20 meters up the spring 3 advanced pit is dug ( Figure does not show it) and running spring 3 is partitioned. Using water pumping out equipment water is transferred to other side of pipeline 4. Flexible canal 1 is laid in dried spring mouth 3 and using cable (Figure does not show it) located under pipe 4 canal 1 is drawn down the spring 3 current till canal ends are equally spaced from center of pipe 4. Then caps 2 are introduced from butts of flexible canal 1 butts. Flexible water passing canal 1 is tightly pressed to spring 3 bottom along lower part of half-perimeter of pipe 4. On top of canal 1 and pipe 4 beginning from its center sheet 5 of nonwoven synthetic material is laid with pressing ends 6 pressed by ground and after that whole open area of pipe 4 is blanketed by ground of 0.8 - 1.0 meter thick over upper generatrix of pipe 4. EFFECT: water passing structure allows to preserve insulation, to avoid labour consumption to provide water passing in case there is laid in embankment pipeline for medium with positive temperature. 2 dwg
Водопропускное сооружение под насыпью монтируют следующим образом. Предварительно для удобства производства работ за 15-20 м от трубопровода вверх по течению ручья 3 выкапывают приямок и перегораживают действующий ручей. Водоотливной техникой накапливающую воду в приямке отводят на другую сторону трубопровода 4. В осушенном русле ручья 3 раскладывают эластичный канал 1 и посредством троса, находящимся под трубой 4, канал 1 протаскивают вниз по течению ручья 3 до равного удаления концов канала от центра трубы 4. Затем с торцов эластичного канала 1 заводят оголовки 2. Эластичный водопропускной канал 1 плотно прижимают к дну ручья 3 по нижней части полупериметра трубы 4. По верху эластичного канала 1 и трубы 4 от ее центра раскладывают полотнище 5 из нетканого синтетического материала с защемлением концов грунтом 6, после чего весь открытый участок трубы 4 засыпают грунтом на 0,8-1,0 м от верхней образующей трубы 4.</description><subject>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1996</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAIdwxxDVIIcAwO9vRzVwgOCQp1DgkNclUI9XMBirv6Ojn6efu6-oXwMLCmJeYUp_JCaW4GBTfXEGcP3dSC_PjU4oLE5NS81JL4oFBLU0MDQ1NLI0djIpQAAOXBJCI</recordid><startdate>19960810</startdate><enddate>19960810</enddate><creator>BURDEJNYJ V.M</creator><creator>SPIRIDOVICH E.A</creator><creator>LISIN I.V</creator><creator>LISIN V.N</creator><creator>JAKOVLEV A.JA</creator><creator>BEREZIN S.S</creator><scope>EVB</scope></search><sort><creationdate>19960810</creationdate><title>WATER PASSING STRUCTURE UNDER EMBANKMENT</title><author>BURDEJNYJ V.M ; SPIRIDOVICH E.A ; LISIN I.V ; LISIN V.N ; JAKOVLEV A.JA ; BEREZIN S.S</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU95101592A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>1996</creationdate><topic>ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>BURDEJNYJ V.M</creatorcontrib><creatorcontrib>SPIRIDOVICH E.A</creatorcontrib><creatorcontrib>LISIN I.V</creatorcontrib><creatorcontrib>LISIN V.N</creatorcontrib><creatorcontrib>JAKOVLEV A.JA</creatorcontrib><creatorcontrib>BEREZIN S.S</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>BURDEJNYJ V.M</au><au>SPIRIDOVICH E.A</au><au>LISIN I.V</au><au>LISIN V.N</au><au>JAKOVLEV A.JA</au><au>BEREZIN S.S</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>WATER PASSING STRUCTURE UNDER EMBANKMENT</title><date>1996-08-10</date><risdate>1996</risdate><abstract>FIELD: water passing structures construction. SUBSTANCE: structure under embankment is mounted in the following way. Preliminary to provide conveniences to exercise works, at distance of 15 - 20 meters up the spring 3 advanced pit is dug ( Figure does not show it) and running spring 3 is partitioned. Using water pumping out equipment water is transferred to other side of pipeline 4. Flexible canal 1 is laid in dried spring mouth 3 and using cable (Figure does not show it) located under pipe 4 canal 1 is drawn down the spring 3 current till canal ends are equally spaced from center of pipe 4. Then caps 2 are introduced from butts of flexible canal 1 butts. Flexible water passing canal 1 is tightly pressed to spring 3 bottom along lower part of half-perimeter of pipe 4. On top of canal 1 and pipe 4 beginning from its center sheet 5 of nonwoven synthetic material is laid with pressing ends 6 pressed by ground and after that whole open area of pipe 4 is blanketed by ground of 0.8 - 1.0 meter thick over upper generatrix of pipe 4. EFFECT: water passing structure allows to preserve insulation, to avoid labour consumption to provide water passing in case there is laid in embankment pipeline for medium with positive temperature. 2 dwg
Водопропускное сооружение под насыпью монтируют следующим образом. Предварительно для удобства производства работ за 15-20 м от трубопровода вверх по течению ручья 3 выкапывают приямок и перегораживают действующий ручей. Водоотливной техникой накапливающую воду в приямке отводят на другую сторону трубопровода 4. В осушенном русле ручья 3 раскладывают эластичный канал 1 и посредством троса, находящимся под трубой 4, канал 1 протаскивают вниз по течению ручья 3 до равного удаления концов канала от центра трубы 4. Затем с торцов эластичного канала 1 заводят оголовки 2. Эластичный водопропускной канал 1 плотно прижимают к дну ручья 3 по нижней части полупериметра трубы 4. По верху эластичного канала 1 и трубы 4 от ее центра раскладывают полотнище 5 из нетканого синтетического материала с защемлением концов грунтом 6, после чего весь открытый участок трубы 4 засыпают грунтом на 0,8-1,0 м от верхней образующей трубы 4.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; rus |
recordid | cdi_epo_espacenet_RU95101592A |
source | esp@cenet |
subjects | ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTIONOF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, ORTHE LIKE CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS |
title | WATER PASSING STRUCTURE UNDER EMBANKMENT |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-10T06%3A09%3A33IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=BURDEJNYJ%20V.M&rft.date=1996-08-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU95101592A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |