ICE FORMATION PREVENTION SYSTEM IN THE GAS GATHERING PIPELINE

FIELD: oil and gas industry.SUBSTANCE: invention relates to the oil and gas industry. The system for preventing ice formation in the gas gathering pipeline includes a gas gathering pipeline 1, an inhibitor supply device, a control station 9, and a gas gathering pipeline blowing device. The device fo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Rotov Aleksandr Aleksandrovich, Istomin Vladimir Aleksandrovich, Mitnitskij Roman Aleksandrovich, Buznikov Nikita Aleksandrovich
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Rotov Aleksandr Aleksandrovich
Istomin Vladimir Aleksandrovich
Mitnitskij Roman Aleksandrovich
Buznikov Nikita Aleksandrovich
description FIELD: oil and gas industry.SUBSTANCE: invention relates to the oil and gas industry. The system for preventing ice formation in the gas gathering pipeline includes a gas gathering pipeline 1, an inhibitor supply device, a control station 9, and a gas gathering pipeline blowing device. The device for purging the gas gathering pipeline includes a shut-off ball valve 11, a purge line 12, a two-phase separator 13 and a flow meter for the liquid 14 to be separated. The inhibitor supply device consists of a supply tank for the inhibitor 3, an inhibitor line 4 laid along the gas gathering pipeline 1, a pump 5 and a check valve 6. The points of inhibitor injection into the gas collecting pipeline 1 are equipped with electrically controlled two-position valves 7 and flow control washers 8. The outlet of the supply container for the inhibitor 3 through pump 5 and check valve 6 is connected to the inlet of the inhibitor line 4. Outlets of the inhibitor line 4 are connected through the electrically controlled two-position valves 7 and the flow control washers 8 to the points of the inhibitor introduction into the gas gathering line 1. The gas gathering pipeline 1 is equipped with a flow meter 2, a first drip catcher 15 at the beginning of the gas gathering pipeline, a second drip catcher 16 at the end of the gas gathering pipeline before being diverted to the purge line 12, and gas temperature measurement sensors 10 at the inhibitor injection points. The outputs of the gas temperature measurement sensors 10 are connected to the inputs of the control station 9, the outputs of which are connected to the control inputs of the electrically controlled two-position valves 7.EFFECT: increasing the operational reliability of field pipelines while saving ice inhibitor.1 cl, 1 dwg Изобретение относится к нефтегазовой промышленности. Технический результат - повышение надежности эксплуатации промысловых трубопроводов с одновременной экономией ингибитора льдообразования. Система предупреждения льдообразования в газосборном трубопроводе включает газосборный трубопровод 1, устройство подачи ингибитора, управляющую станцию 9, устройство продувки газосборного трубопровода. Устройство продувки газосборного трубопровода включает отсекающий шаровой кран 11, продувочную линию 12, двухфазный сепаратор 13 и расходомер сепарируемой жидкости 14. Устройство подачи ингибитора состоит из расходной емкости для ингибитора 3, ингибиторопровода 4, проложенного вдоль газосборного трубопровода 1, нас
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2762323C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2762323C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2762323C13</originalsourceid><addsrcrecordid>eNrjZLD1dHZVcPMP8nUM8fT3UwgIcg1z9QMzgyODQ1x9FTz9FEI8XBXcHYOBGMgK8vRzVwjwDHD18fRz5WFgTUvMKU7lhdLcDApuriHOHrqpBfnxqcUFicmpeakl8UGhRuZmRsZGxs6GxkQoAQDlmimX</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>ICE FORMATION PREVENTION SYSTEM IN THE GAS GATHERING PIPELINE</title><source>esp@cenet</source><creator>Rotov Aleksandr Aleksandrovich ; Istomin Vladimir Aleksandrovich ; Mitnitskij Roman Aleksandrovich ; Buznikov Nikita Aleksandrovich</creator><creatorcontrib>Rotov Aleksandr Aleksandrovich ; Istomin Vladimir Aleksandrovich ; Mitnitskij Roman Aleksandrovich ; Buznikov Nikita Aleksandrovich</creatorcontrib><description>FIELD: oil and gas industry.SUBSTANCE: invention relates to the oil and gas industry. The system for preventing ice formation in the gas gathering pipeline includes a gas gathering pipeline 1, an inhibitor supply device, a control station 9, and a gas gathering pipeline blowing device. The device for purging the gas gathering pipeline includes a shut-off ball valve 11, a purge line 12, a two-phase separator 13 and a flow meter for the liquid 14 to be separated. The inhibitor supply device consists of a supply tank for the inhibitor 3, an inhibitor line 4 laid along the gas gathering pipeline 1, a pump 5 and a check valve 6. The points of inhibitor injection into the gas collecting pipeline 1 are equipped with electrically controlled two-position valves 7 and flow control washers 8. The outlet of the supply container for the inhibitor 3 through pump 5 and check valve 6 is connected to the inlet of the inhibitor line 4. Outlets of the inhibitor line 4 are connected through the electrically controlled two-position valves 7 and the flow control washers 8 to the points of the inhibitor introduction into the gas gathering line 1. The gas gathering pipeline 1 is equipped with a flow meter 2, a first drip catcher 15 at the beginning of the gas gathering pipeline, a second drip catcher 16 at the end of the gas gathering pipeline before being diverted to the purge line 12, and gas temperature measurement sensors 10 at the inhibitor injection points. The outputs of the gas temperature measurement sensors 10 are connected to the inputs of the control station 9, the outputs of which are connected to the control inputs of the electrically controlled two-position valves 7.EFFECT: increasing the operational reliability of field pipelines while saving ice inhibitor.1 cl, 1 dwg Изобретение относится к нефтегазовой промышленности. Технический результат - повышение надежности эксплуатации промысловых трубопроводов с одновременной экономией ингибитора льдообразования. Система предупреждения льдообразования в газосборном трубопроводе включает газосборный трубопровод 1, устройство подачи ингибитора, управляющую станцию 9, устройство продувки газосборного трубопровода. Устройство продувки газосборного трубопровода включает отсекающий шаровой кран 11, продувочную линию 12, двухфазный сепаратор 13 и расходомер сепарируемой жидкости 14. Устройство подачи ингибитора состоит из расходной емкости для ингибитора 3, ингибиторопровода 4, проложенного вдоль газосборного трубопровода 1, насоса 5 и обратного клапана 6. Точки ввода ингибитора в газосборный трубопровод 1 снабжены электроуправляемыми двухпозиционными клапанами 7 и регулирующими расход шайбами 8. Выход расходной емкости для ингибитора 3 через насос 5 и обратный клапан 6 подключен к входу ингибиторопровода 4. Выходы ингибиторопровода 4 через электроуправляемые двухпозиционные клапана 7 и регулирующие расход шайбы 8 соединены с точками ввода ингибитора в газосборный трубопровод 1. Газосборный трубопровод 1 снабжен расходомером 2, первым каплеуловителем 15 в начале газосборного трубопровода, вторым каплеуловителем 16 в конце газосборного трубопровода перед отводом в продувочную линию 12, датчиками измерения температуры газа 10 в точках ввода ингибитора. Выходы датчиков измерения температуры газа 10 подключены на входы управляющей станции 9, выходы которой подключены к управляющим входам электроуправляемых двухпозиционных клапанов 7. 1 ил.</description><language>eng ; rus</language><subject>BLASTING ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; HEATING ; LIGHTING ; MECHANICAL ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; PIPE-LINE SYSTEMS ; PIPE-LINES ; STORING OF DISTRIBUTING GASES OR LIQUIDS ; WEAPONS</subject><creationdate>2021</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211217&amp;DB=EPODOC&amp;CC=RU&amp;NR=2762323C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20211217&amp;DB=EPODOC&amp;CC=RU&amp;NR=2762323C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Rotov Aleksandr Aleksandrovich</creatorcontrib><creatorcontrib>Istomin Vladimir Aleksandrovich</creatorcontrib><creatorcontrib>Mitnitskij Roman Aleksandrovich</creatorcontrib><creatorcontrib>Buznikov Nikita Aleksandrovich</creatorcontrib><title>ICE FORMATION PREVENTION SYSTEM IN THE GAS GATHERING PIPELINE</title><description>FIELD: oil and gas industry.SUBSTANCE: invention relates to the oil and gas industry. The system for preventing ice formation in the gas gathering pipeline includes a gas gathering pipeline 1, an inhibitor supply device, a control station 9, and a gas gathering pipeline blowing device. The device for purging the gas gathering pipeline includes a shut-off ball valve 11, a purge line 12, a two-phase separator 13 and a flow meter for the liquid 14 to be separated. The inhibitor supply device consists of a supply tank for the inhibitor 3, an inhibitor line 4 laid along the gas gathering pipeline 1, a pump 5 and a check valve 6. The points of inhibitor injection into the gas collecting pipeline 1 are equipped with electrically controlled two-position valves 7 and flow control washers 8. The outlet of the supply container for the inhibitor 3 through pump 5 and check valve 6 is connected to the inlet of the inhibitor line 4. Outlets of the inhibitor line 4 are connected through the electrically controlled two-position valves 7 and the flow control washers 8 to the points of the inhibitor introduction into the gas gathering line 1. The gas gathering pipeline 1 is equipped with a flow meter 2, a first drip catcher 15 at the beginning of the gas gathering pipeline, a second drip catcher 16 at the end of the gas gathering pipeline before being diverted to the purge line 12, and gas temperature measurement sensors 10 at the inhibitor injection points. The outputs of the gas temperature measurement sensors 10 are connected to the inputs of the control station 9, the outputs of which are connected to the control inputs of the electrically controlled two-position valves 7.EFFECT: increasing the operational reliability of field pipelines while saving ice inhibitor.1 cl, 1 dwg Изобретение относится к нефтегазовой промышленности. Технический результат - повышение надежности эксплуатации промысловых трубопроводов с одновременной экономией ингибитора льдообразования. Система предупреждения льдообразования в газосборном трубопроводе включает газосборный трубопровод 1, устройство подачи ингибитора, управляющую станцию 9, устройство продувки газосборного трубопровода. Устройство продувки газосборного трубопровода включает отсекающий шаровой кран 11, продувочную линию 12, двухфазный сепаратор 13 и расходомер сепарируемой жидкости 14. Устройство подачи ингибитора состоит из расходной емкости для ингибитора 3, ингибиторопровода 4, проложенного вдоль газосборного трубопровода 1, насоса 5 и обратного клапана 6. Точки ввода ингибитора в газосборный трубопровод 1 снабжены электроуправляемыми двухпозиционными клапанами 7 и регулирующими расход шайбами 8. Выход расходной емкости для ингибитора 3 через насос 5 и обратный клапан 6 подключен к входу ингибиторопровода 4. Выходы ингибиторопровода 4 через электроуправляемые двухпозиционные клапана 7 и регулирующие расход шайбы 8 соединены с точками ввода ингибитора в газосборный трубопровод 1. Газосборный трубопровод 1 снабжен расходомером 2, первым каплеуловителем 15 в начале газосборного трубопровода, вторым каплеуловителем 16 в конце газосборного трубопровода перед отводом в продувочную линию 12, датчиками измерения температуры газа 10 в точках ввода ингибитора. Выходы датчиков измерения температуры газа 10 подключены на входы управляющей станции 9, выходы которой подключены к управляющим входам электроуправляемых двухпозиционных клапанов 7. 1 ил.</description><subject>BLASTING</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>HEATING</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>PIPE-LINE SYSTEMS</subject><subject>PIPE-LINES</subject><subject>STORING OF DISTRIBUTING GASES OR LIQUIDS</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2021</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLD1dHZVcPMP8nUM8fT3UwgIcg1z9QMzgyODQ1x9FTz9FEI8XBXcHYOBGMgK8vRzVwjwDHD18fRz5WFgTUvMKU7lhdLcDApuriHOHrqpBfnxqcUFicmpeakl8UGhRuZmRsZGxs6GxkQoAQDlmimX</recordid><startdate>20211217</startdate><enddate>20211217</enddate><creator>Rotov Aleksandr Aleksandrovich</creator><creator>Istomin Vladimir Aleksandrovich</creator><creator>Mitnitskij Roman Aleksandrovich</creator><creator>Buznikov Nikita Aleksandrovich</creator><scope>EVB</scope></search><sort><creationdate>20211217</creationdate><title>ICE FORMATION PREVENTION SYSTEM IN THE GAS GATHERING PIPELINE</title><author>Rotov Aleksandr Aleksandrovich ; Istomin Vladimir Aleksandrovich ; Mitnitskij Roman Aleksandrovich ; Buznikov Nikita Aleksandrovich</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2762323C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2021</creationdate><topic>BLASTING</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>HEATING</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>PIPE-LINE SYSTEMS</topic><topic>PIPE-LINES</topic><topic>STORING OF DISTRIBUTING GASES OR LIQUIDS</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>Rotov Aleksandr Aleksandrovich</creatorcontrib><creatorcontrib>Istomin Vladimir Aleksandrovich</creatorcontrib><creatorcontrib>Mitnitskij Roman Aleksandrovich</creatorcontrib><creatorcontrib>Buznikov Nikita Aleksandrovich</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Rotov Aleksandr Aleksandrovich</au><au>Istomin Vladimir Aleksandrovich</au><au>Mitnitskij Roman Aleksandrovich</au><au>Buznikov Nikita Aleksandrovich</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>ICE FORMATION PREVENTION SYSTEM IN THE GAS GATHERING PIPELINE</title><date>2021-12-17</date><risdate>2021</risdate><abstract>FIELD: oil and gas industry.SUBSTANCE: invention relates to the oil and gas industry. The system for preventing ice formation in the gas gathering pipeline includes a gas gathering pipeline 1, an inhibitor supply device, a control station 9, and a gas gathering pipeline blowing device. The device for purging the gas gathering pipeline includes a shut-off ball valve 11, a purge line 12, a two-phase separator 13 and a flow meter for the liquid 14 to be separated. The inhibitor supply device consists of a supply tank for the inhibitor 3, an inhibitor line 4 laid along the gas gathering pipeline 1, a pump 5 and a check valve 6. The points of inhibitor injection into the gas collecting pipeline 1 are equipped with electrically controlled two-position valves 7 and flow control washers 8. The outlet of the supply container for the inhibitor 3 through pump 5 and check valve 6 is connected to the inlet of the inhibitor line 4. Outlets of the inhibitor line 4 are connected through the electrically controlled two-position valves 7 and the flow control washers 8 to the points of the inhibitor introduction into the gas gathering line 1. The gas gathering pipeline 1 is equipped with a flow meter 2, a first drip catcher 15 at the beginning of the gas gathering pipeline, a second drip catcher 16 at the end of the gas gathering pipeline before being diverted to the purge line 12, and gas temperature measurement sensors 10 at the inhibitor injection points. The outputs of the gas temperature measurement sensors 10 are connected to the inputs of the control station 9, the outputs of which are connected to the control inputs of the electrically controlled two-position valves 7.EFFECT: increasing the operational reliability of field pipelines while saving ice inhibitor.1 cl, 1 dwg Изобретение относится к нефтегазовой промышленности. Технический результат - повышение надежности эксплуатации промысловых трубопроводов с одновременной экономией ингибитора льдообразования. Система предупреждения льдообразования в газосборном трубопроводе включает газосборный трубопровод 1, устройство подачи ингибитора, управляющую станцию 9, устройство продувки газосборного трубопровода. Устройство продувки газосборного трубопровода включает отсекающий шаровой кран 11, продувочную линию 12, двухфазный сепаратор 13 и расходомер сепарируемой жидкости 14. Устройство подачи ингибитора состоит из расходной емкости для ингибитора 3, ингибиторопровода 4, проложенного вдоль газосборного трубопровода 1, насоса 5 и обратного клапана 6. Точки ввода ингибитора в газосборный трубопровод 1 снабжены электроуправляемыми двухпозиционными клапанами 7 и регулирующими расход шайбами 8. Выход расходной емкости для ингибитора 3 через насос 5 и обратный клапан 6 подключен к входу ингибиторопровода 4. Выходы ингибиторопровода 4 через электроуправляемые двухпозиционные клапана 7 и регулирующие расход шайбы 8 соединены с точками ввода ингибитора в газосборный трубопровод 1. Газосборный трубопровод 1 снабжен расходомером 2, первым каплеуловителем 15 в начале газосборного трубопровода, вторым каплеуловителем 16 в конце газосборного трубопровода перед отводом в продувочную линию 12, датчиками измерения температуры газа 10 в точках ввода ингибитора. Выходы датчиков измерения температуры газа 10 подключены на входы управляющей станции 9, выходы которой подключены к управляющим входам электроуправляемых двухпозиционных клапанов 7. 1 ил.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; rus
recordid cdi_epo_espacenet_RU2762323C1
source esp@cenet
subjects BLASTING
EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
HEATING
LIGHTING
MECHANICAL ENGINEERING
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
PIPE-LINE SYSTEMS
PIPE-LINES
STORING OF DISTRIBUTING GASES OR LIQUIDS
WEAPONS
title ICE FORMATION PREVENTION SYSTEM IN THE GAS GATHERING PIPELINE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-07T20%3A51%3A29IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Rotov%20Aleksandr%20Aleksandrovich&rft.date=2021-12-17&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2762323C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true