METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS
FIELD: construction.SUBSTANCE: invention relates to construction, namely, to construction of inclined tunnels in weak water-saturated soils at construction of metro stations and mining industry during mine shafts driving in unstable and flooded rocks. In order to implement the method of inclined tun...
Gespeichert in:
Hauptverfasser: | , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Starkov Aleksej Yurevich Morozov Andrej Vladislavovich Lebedev Mikhail Olegovich Markov Vladimir Andreevich Maslak Vladimir Aleksandrovich Bezrodnyj Konstantin Petrovich Ukhanov Aleksej Valentinovich |
description | FIELD: construction.SUBSTANCE: invention relates to construction, namely, to construction of inclined tunnels in weak water-saturated soils at construction of metro stations and mining industry during mine shafts driving in unstable and flooded rocks. In order to implement the method of inclined tunnels construction in weak water-saturated soils, vertical wells are drilled at required depth along the tunnel contour. Then at design elevations in area of passage of tunnel in drilled wells there performed is formation of soil-cement massif based on soil-cement piles. Then, inclined wells are drilled in the array along the inclined tunnel contour and as close as possible to the outer surface of the inclined tunnel diameter. Freezing columns are installed in inclined wells and freezing of soil-cement mass layer is performed, which provides formation of combined anti-filtration enclosure along external diameter of inclined tunnel consisting of frozen soil-cement soil. At that, freezing process is performed only after complete hardening of soil-cement composition in soil-cement piles. Then, ground rocks are developed inside combined anti-filtration enclosure with simultaneous construction of lining of inclined tunnel.EFFECT: technical result is increased mechanical strength and reliability of the anti-filtration enclosure, safe operation of the anti-filtration guard, reduction of energy consumption for freezing of soil rocks at creation of inclined tunnels, as well as reduction of volumes of soil destruction in process of freezing and settling of earth surface at thawing of soil after completion of works on construction of inclined tunnel.1 cl, 2 dwg
Изобретение относится к строительству, а именно способам сооружения наклонных тоннелей в слабых водонасыщенных грунтах при сооружении станций метрополитена и горной промышленности при проходке шахтных стволов в неустойчивых и обводненных породах. Достигаемый технический результат - повышение механической прочности и надежности противофильтрационного ограждения, обеспечение безаварийности работы противофильтрационного ограждения, снижение энергозатрат на замораживание грунтовых пород при создании наклонных тоннелей, а также уменьшение объемов деструкции грунта в процессе замораживания и осадки земной поверхности при оттаивании грунта после завершении работ по сооружению наклонного тоннеля. Для реализации способа сооружения наклонных тоннелей в слабых водонасыщенных грунтах первоначально вдоль контура тоннеля осуществл |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2739880C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2739880C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2739880C13</originalsourceid><addsrcrecordid>eNrjZHD1dQ3x8HdR8HdT8PRz9vH0c3VRCAn183P1CVZw9vcLDgkKdQ7x9PcDyiqEuzp6K4Q7hrgG6QY7hoQGAVkuCsH-nj7BPAysaYk5xam8UJqbQcHNNcTZQze1ID8-tbggMTk1L7UkPijUyNzY0sLCwNnQmAglAE0BLBw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS</title><source>esp@cenet</source><creator>Starkov Aleksej Yurevich ; Morozov Andrej Vladislavovich ; Lebedev Mikhail Olegovich ; Markov Vladimir Andreevich ; Maslak Vladimir Aleksandrovich ; Bezrodnyj Konstantin Petrovich ; Ukhanov Aleksej Valentinovich</creator><creatorcontrib>Starkov Aleksej Yurevich ; Morozov Andrej Vladislavovich ; Lebedev Mikhail Olegovich ; Markov Vladimir Andreevich ; Maslak Vladimir Aleksandrovich ; Bezrodnyj Konstantin Petrovich ; Ukhanov Aleksej Valentinovich</creatorcontrib><description>FIELD: construction.SUBSTANCE: invention relates to construction, namely, to construction of inclined tunnels in weak water-saturated soils at construction of metro stations and mining industry during mine shafts driving in unstable and flooded rocks. In order to implement the method of inclined tunnels construction in weak water-saturated soils, vertical wells are drilled at required depth along the tunnel contour. Then at design elevations in area of passage of tunnel in drilled wells there performed is formation of soil-cement massif based on soil-cement piles. Then, inclined wells are drilled in the array along the inclined tunnel contour and as close as possible to the outer surface of the inclined tunnel diameter. Freezing columns are installed in inclined wells and freezing of soil-cement mass layer is performed, which provides formation of combined anti-filtration enclosure along external diameter of inclined tunnel consisting of frozen soil-cement soil. At that, freezing process is performed only after complete hardening of soil-cement composition in soil-cement piles. Then, ground rocks are developed inside combined anti-filtration enclosure with simultaneous construction of lining of inclined tunnel.EFFECT: technical result is increased mechanical strength and reliability of the anti-filtration enclosure, safe operation of the anti-filtration guard, reduction of energy consumption for freezing of soil rocks at creation of inclined tunnels, as well as reduction of volumes of soil destruction in process of freezing and settling of earth surface at thawing of soil after completion of works on construction of inclined tunnel.1 cl, 2 dwg
Изобретение относится к строительству, а именно способам сооружения наклонных тоннелей в слабых водонасыщенных грунтах при сооружении станций метрополитена и горной промышленности при проходке шахтных стволов в неустойчивых и обводненных породах. Достигаемый технический результат - повышение механической прочности и надежности противофильтрационного ограждения, обеспечение безаварийности работы противофильтрационного ограждения, снижение энергозатрат на замораживание грунтовых пород при создании наклонных тоннелей, а также уменьшение объемов деструкции грунта в процессе замораживания и осадки земной поверхности при оттаивании грунта после завершении работ по сооружению наклонного тоннеля. Для реализации способа сооружения наклонных тоннелей в слабых водонасыщенных грунтах первоначально вдоль контура тоннеля осуществляют бурение вертикальных скважин на необходимую глубину. Затем на проектных отметках в области прохождения тоннеля в пробуренных скважинах производят формирование грунтоцементного массива на основе грунтоцементных свай. Затем в массиве бурят наклонные скважины вдоль контура наклонного тоннеля и максимально близко к внешней поверхности диаметра наклонного тоннеля. В наклонные скважины устанавливают замораживающие колонки и производят замораживания слоя грунтоцементного массива, что обеспечивает формирование комбинированного противофильтрационного ограждения по внешнему диаметру наклонного тоннеля, состоящего из промороженного грунтоцементного грунта. При этом процесс замораживания осуществляют только после полного отвердения грунтоцементного состава в грунтоцементных сваях. Затем производят разработку грунтовых пород внутри комбинированного противофильтрационного ограждения с одновременным возведением обделки наклонного тоннеля. 2 ил.</description><language>eng ; rus</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; SHAFTS ; TUNNELS</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201229&DB=EPODOC&CC=RU&NR=2739880C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20201229&DB=EPODOC&CC=RU&NR=2739880C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Starkov Aleksej Yurevich</creatorcontrib><creatorcontrib>Morozov Andrej Vladislavovich</creatorcontrib><creatorcontrib>Lebedev Mikhail Olegovich</creatorcontrib><creatorcontrib>Markov Vladimir Andreevich</creatorcontrib><creatorcontrib>Maslak Vladimir Aleksandrovich</creatorcontrib><creatorcontrib>Bezrodnyj Konstantin Petrovich</creatorcontrib><creatorcontrib>Ukhanov Aleksej Valentinovich</creatorcontrib><title>METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS</title><description>FIELD: construction.SUBSTANCE: invention relates to construction, namely, to construction of inclined tunnels in weak water-saturated soils at construction of metro stations and mining industry during mine shafts driving in unstable and flooded rocks. In order to implement the method of inclined tunnels construction in weak water-saturated soils, vertical wells are drilled at required depth along the tunnel contour. Then at design elevations in area of passage of tunnel in drilled wells there performed is formation of soil-cement massif based on soil-cement piles. Then, inclined wells are drilled in the array along the inclined tunnel contour and as close as possible to the outer surface of the inclined tunnel diameter. Freezing columns are installed in inclined wells and freezing of soil-cement mass layer is performed, which provides formation of combined anti-filtration enclosure along external diameter of inclined tunnel consisting of frozen soil-cement soil. At that, freezing process is performed only after complete hardening of soil-cement composition in soil-cement piles. Then, ground rocks are developed inside combined anti-filtration enclosure with simultaneous construction of lining of inclined tunnel.EFFECT: technical result is increased mechanical strength and reliability of the anti-filtration enclosure, safe operation of the anti-filtration guard, reduction of energy consumption for freezing of soil rocks at creation of inclined tunnels, as well as reduction of volumes of soil destruction in process of freezing and settling of earth surface at thawing of soil after completion of works on construction of inclined tunnel.1 cl, 2 dwg
Изобретение относится к строительству, а именно способам сооружения наклонных тоннелей в слабых водонасыщенных грунтах при сооружении станций метрополитена и горной промышленности при проходке шахтных стволов в неустойчивых и обводненных породах. Достигаемый технический результат - повышение механической прочности и надежности противофильтрационного ограждения, обеспечение безаварийности работы противофильтрационного ограждения, снижение энергозатрат на замораживание грунтовых пород при создании наклонных тоннелей, а также уменьшение объемов деструкции грунта в процессе замораживания и осадки земной поверхности при оттаивании грунта после завершении работ по сооружению наклонного тоннеля. Для реализации способа сооружения наклонных тоннелей в слабых водонасыщенных грунтах первоначально вдоль контура тоннеля осуществляют бурение вертикальных скважин на необходимую глубину. Затем на проектных отметках в области прохождения тоннеля в пробуренных скважинах производят формирование грунтоцементного массива на основе грунтоцементных свай. Затем в массиве бурят наклонные скважины вдоль контура наклонного тоннеля и максимально близко к внешней поверхности диаметра наклонного тоннеля. В наклонные скважины устанавливают замораживающие колонки и производят замораживания слоя грунтоцементного массива, что обеспечивает формирование комбинированного противофильтрационного ограждения по внешнему диаметру наклонного тоннеля, состоящего из промороженного грунтоцементного грунта. При этом процесс замораживания осуществляют только после полного отвердения грунтоцементного состава в грунтоцементных сваях. Затем производят разработку грунтовых пород внутри комбинированного противофильтрационного ограждения с одновременным возведением обделки наклонного тоннеля. 2 ил.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHD1dQ3x8HdR8HdT8PRz9vH0c3VRCAn183P1CVZw9vcLDgkKdQ7x9PcDyiqEuzp6K4Q7hrgG6QY7hoQGAVkuCsH-nj7BPAysaYk5xam8UJqbQcHNNcTZQze1ID8-tbggMTk1L7UkPijUyNzY0sLCwNnQmAglAE0BLBw</recordid><startdate>20201229</startdate><enddate>20201229</enddate><creator>Starkov Aleksej Yurevich</creator><creator>Morozov Andrej Vladislavovich</creator><creator>Lebedev Mikhail Olegovich</creator><creator>Markov Vladimir Andreevich</creator><creator>Maslak Vladimir Aleksandrovich</creator><creator>Bezrodnyj Konstantin Petrovich</creator><creator>Ukhanov Aleksej Valentinovich</creator><scope>EVB</scope></search><sort><creationdate>20201229</creationdate><title>METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS</title><author>Starkov Aleksej Yurevich ; Morozov Andrej Vladislavovich ; Lebedev Mikhail Olegovich ; Markov Vladimir Andreevich ; Maslak Vladimir Aleksandrovich ; Bezrodnyj Konstantin Petrovich ; Ukhanov Aleksej Valentinovich</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2739880C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2020</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>Starkov Aleksej Yurevich</creatorcontrib><creatorcontrib>Morozov Andrej Vladislavovich</creatorcontrib><creatorcontrib>Lebedev Mikhail Olegovich</creatorcontrib><creatorcontrib>Markov Vladimir Andreevich</creatorcontrib><creatorcontrib>Maslak Vladimir Aleksandrovich</creatorcontrib><creatorcontrib>Bezrodnyj Konstantin Petrovich</creatorcontrib><creatorcontrib>Ukhanov Aleksej Valentinovich</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Starkov Aleksej Yurevich</au><au>Morozov Andrej Vladislavovich</au><au>Lebedev Mikhail Olegovich</au><au>Markov Vladimir Andreevich</au><au>Maslak Vladimir Aleksandrovich</au><au>Bezrodnyj Konstantin Petrovich</au><au>Ukhanov Aleksej Valentinovich</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS</title><date>2020-12-29</date><risdate>2020</risdate><abstract>FIELD: construction.SUBSTANCE: invention relates to construction, namely, to construction of inclined tunnels in weak water-saturated soils at construction of metro stations and mining industry during mine shafts driving in unstable and flooded rocks. In order to implement the method of inclined tunnels construction in weak water-saturated soils, vertical wells are drilled at required depth along the tunnel contour. Then at design elevations in area of passage of tunnel in drilled wells there performed is formation of soil-cement massif based on soil-cement piles. Then, inclined wells are drilled in the array along the inclined tunnel contour and as close as possible to the outer surface of the inclined tunnel diameter. Freezing columns are installed in inclined wells and freezing of soil-cement mass layer is performed, which provides formation of combined anti-filtration enclosure along external diameter of inclined tunnel consisting of frozen soil-cement soil. At that, freezing process is performed only after complete hardening of soil-cement composition in soil-cement piles. Then, ground rocks are developed inside combined anti-filtration enclosure with simultaneous construction of lining of inclined tunnel.EFFECT: technical result is increased mechanical strength and reliability of the anti-filtration enclosure, safe operation of the anti-filtration guard, reduction of energy consumption for freezing of soil rocks at creation of inclined tunnels, as well as reduction of volumes of soil destruction in process of freezing and settling of earth surface at thawing of soil after completion of works on construction of inclined tunnel.1 cl, 2 dwg
Изобретение относится к строительству, а именно способам сооружения наклонных тоннелей в слабых водонасыщенных грунтах при сооружении станций метрополитена и горной промышленности при проходке шахтных стволов в неустойчивых и обводненных породах. Достигаемый технический результат - повышение механической прочности и надежности противофильтрационного ограждения, обеспечение безаварийности работы противофильтрационного ограждения, снижение энергозатрат на замораживание грунтовых пород при создании наклонных тоннелей, а также уменьшение объемов деструкции грунта в процессе замораживания и осадки земной поверхности при оттаивании грунта после завершении работ по сооружению наклонного тоннеля. Для реализации способа сооружения наклонных тоннелей в слабых водонасыщенных грунтах первоначально вдоль контура тоннеля осуществляют бурение вертикальных скважин на необходимую глубину. Затем на проектных отметках в области прохождения тоннеля в пробуренных скважинах производят формирование грунтоцементного массива на основе грунтоцементных свай. Затем в массиве бурят наклонные скважины вдоль контура наклонного тоннеля и максимально близко к внешней поверхности диаметра наклонного тоннеля. В наклонные скважины устанавливают замораживающие колонки и производят замораживания слоя грунтоцементного массива, что обеспечивает формирование комбинированного противофильтрационного ограждения по внешнему диаметру наклонного тоннеля, состоящего из промороженного грунтоцементного грунта. При этом процесс замораживания осуществляют только после полного отвердения грунтоцементного состава в грунтоцементных сваях. Затем производят разработку грунтовых пород внутри комбинированного противофильтрационного ограждения с одновременным возведением обделки наклонного тоннеля. 2 ил.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; rus |
recordid | cdi_epo_espacenet_RU2739880C1 |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING SHAFTS TUNNELS |
title | METHOD OF INCLINED TUNNELS CONSTRUCTION IN WEAK WATER-SATURATED SOILS |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-25T08%3A18%3A40IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Starkov%20Aleksej%20Yurevich&rft.date=2020-12-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2739880C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |