METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS

FIELD: construction.SUBSTANCE: invention relates to construction and construction of buried structures, for example, tunnels and subway stations. Method of correction of subsidence trough at erection of underground structure by closed method in weak soils includes drilling of wells and initial creat...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Starkov Aleksej Yurevich, Lebedev Mikhail Olegovich, Maslak Vladimir Aleksandrovich, Bezrodnyj Konstantin Petrovich
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Starkov Aleksej Yurevich
Lebedev Mikhail Olegovich
Maslak Vladimir Aleksandrovich
Bezrodnyj Konstantin Petrovich
description FIELD: construction.SUBSTANCE: invention relates to construction and construction of buried structures, for example, tunnels and subway stations. Method of correction of subsidence trough at erection of underground structure by closed method in weak soils includes drilling of wells and initial creation of pre-fixed stabilizing layers of rock massif between foundation of building and area of arrangement of underground structure erected with the help of underground tunneling, with formation of alternating fixed stabilizing layers and loose extensible layers of rock mass. Further, the hardening solution is injected into loose expandable layers of the rock mass, located between the foundation of the building, fixed with stabilizing layers and erected underground structure, which is carried out during erection of the underground structure, taking into account the development of subsidence trough. In unfilled expanded layers of rock mass before construction of underground structure sensors are installed to measure parameters of stresses and deformations in rock mass, for this purpose additional wells are drilled for installation of sensors. Parameters are measured prior to driving an underground mine by erection of an underground structure and when they are changed during underground drilling, a hardening solution is injected into these layers until the values of stress and strain parameters in the rock massif between the foundation of the building and area of underground structure location, determined before underground tunneling.EFFECT: technical result consists in improvement of accuracy of time of beginning and completion of works on injection of hardening solution and reduction of volumes of consumed materials for elimination of deformation of soil under foundations of buildings and structures at underground driving during construction, for example, tunnel of underground.1 cl, 2 dwg Изобретение относится к строительству и касается возведения заглубленных сооружений, например тоннелей и станций метрополитена. Способ коррекции мульды осадок при возведении подземного сооружения закрытым способом в слабых грунтах включает в себя бурение скважин и первоначальное создание предварительно закрепленных стабилизирующих слоев породного массива между фундаментом здания и областью размещения подземного сооружения, возводимого с помощью подземной проходки, с образованием чередования закрепленных стабилизирующих слоев и незакрепленных расширяемых слоев породного массива.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2715784C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2715784C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2715784C13</originalsourceid><addsrcrecordid>eNqNjLsKwkAQRdNYiPoP8wMW8UFsk9lJshh3YHaWYBWCrJWPQPx_VEhhaXU5nMOdJ_cTac0GuARkEUK17L7kQ-GtIYcEKhyqGnIF-gmCMyTVRzkDXiWgBiEozoANezIwHVsHLeVH8Gwbv0xm1_42xtW0iwRKUqzXcXh2cRz6S3zEVydhk6X77LDDdPtH8gbKKzbJ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS</title><source>esp@cenet</source><creator>Starkov Aleksej Yurevich ; Lebedev Mikhail Olegovich ; Maslak Vladimir Aleksandrovich ; Bezrodnyj Konstantin Petrovich</creator><creatorcontrib>Starkov Aleksej Yurevich ; Lebedev Mikhail Olegovich ; Maslak Vladimir Aleksandrovich ; Bezrodnyj Konstantin Petrovich</creatorcontrib><description>FIELD: construction.SUBSTANCE: invention relates to construction and construction of buried structures, for example, tunnels and subway stations. Method of correction of subsidence trough at erection of underground structure by closed method in weak soils includes drilling of wells and initial creation of pre-fixed stabilizing layers of rock massif between foundation of building and area of arrangement of underground structure erected with the help of underground tunneling, with formation of alternating fixed stabilizing layers and loose extensible layers of rock mass. Further, the hardening solution is injected into loose expandable layers of the rock mass, located between the foundation of the building, fixed with stabilizing layers and erected underground structure, which is carried out during erection of the underground structure, taking into account the development of subsidence trough. In unfilled expanded layers of rock mass before construction of underground structure sensors are installed to measure parameters of stresses and deformations in rock mass, for this purpose additional wells are drilled for installation of sensors. Parameters are measured prior to driving an underground mine by erection of an underground structure and when they are changed during underground drilling, a hardening solution is injected into these layers until the values of stress and strain parameters in the rock massif between the foundation of the building and area of underground structure location, determined before underground tunneling.EFFECT: technical result consists in improvement of accuracy of time of beginning and completion of works on injection of hardening solution and reduction of volumes of consumed materials for elimination of deformation of soil under foundations of buildings and structures at underground driving during construction, for example, tunnel of underground.1 cl, 2 dwg Изобретение относится к строительству и касается возведения заглубленных сооружений, например тоннелей и станций метрополитена. Способ коррекции мульды осадок при возведении подземного сооружения закрытым способом в слабых грунтах включает в себя бурение скважин и первоначальное создание предварительно закрепленных стабилизирующих слоев породного массива между фундаментом здания и областью размещения подземного сооружения, возводимого с помощью подземной проходки, с образованием чередования закрепленных стабилизирующих слоев и незакрепленных расширяемых слоев породного массива. Последующее инъецирование твердеющего раствора в незакрепленные расширяемые слои породного массива, расположенные между фундаментом здания, закрепленные стабилизирующими слоями и возводимым подземным сооружением, проводимого в процессе возведения подземного сооружения с учетом развития мульды осадок. В незакрепленных расширяемых слоях породного массива перед началом возведения подземного сооружения устанавливают датчики для измерения параметров напряжений и деформаций в породном массиве, для чего производят бурение дополнительных скважин для установки датчиков. Измерения параметров начинают до проходки подземной выработки по возведению подземного сооружения и при их изменении во время подземной проходки инъецируют в эти слои твердеющий раствор до восстановления величин параметров напряжений и деформаций в породном массиве между фундаментом здания и областью размещения подземного сооружения, определенных до начала подземной проходки. Технический результат состоит в повышении точности времени начала и окончания работ по инъекции твердеющего раствора и снижении объемов расходуемых материалов для устранения деформаций грунта под фундаментами зданий и сооружений при подземной проходке во время сооружения, например, тоннеля метрополитена. 2 ил.</description><language>eng ; rus</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>2020</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200303&amp;DB=EPODOC&amp;CC=RU&amp;NR=2715784C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20200303&amp;DB=EPODOC&amp;CC=RU&amp;NR=2715784C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Starkov Aleksej Yurevich</creatorcontrib><creatorcontrib>Lebedev Mikhail Olegovich</creatorcontrib><creatorcontrib>Maslak Vladimir Aleksandrovich</creatorcontrib><creatorcontrib>Bezrodnyj Konstantin Petrovich</creatorcontrib><title>METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS</title><description>FIELD: construction.SUBSTANCE: invention relates to construction and construction of buried structures, for example, tunnels and subway stations. Method of correction of subsidence trough at erection of underground structure by closed method in weak soils includes drilling of wells and initial creation of pre-fixed stabilizing layers of rock massif between foundation of building and area of arrangement of underground structure erected with the help of underground tunneling, with formation of alternating fixed stabilizing layers and loose extensible layers of rock mass. Further, the hardening solution is injected into loose expandable layers of the rock mass, located between the foundation of the building, fixed with stabilizing layers and erected underground structure, which is carried out during erection of the underground structure, taking into account the development of subsidence trough. In unfilled expanded layers of rock mass before construction of underground structure sensors are installed to measure parameters of stresses and deformations in rock mass, for this purpose additional wells are drilled for installation of sensors. Parameters are measured prior to driving an underground mine by erection of an underground structure and when they are changed during underground drilling, a hardening solution is injected into these layers until the values of stress and strain parameters in the rock massif between the foundation of the building and area of underground structure location, determined before underground tunneling.EFFECT: technical result consists in improvement of accuracy of time of beginning and completion of works on injection of hardening solution and reduction of volumes of consumed materials for elimination of deformation of soil under foundations of buildings and structures at underground driving during construction, for example, tunnel of underground.1 cl, 2 dwg Изобретение относится к строительству и касается возведения заглубленных сооружений, например тоннелей и станций метрополитена. Способ коррекции мульды осадок при возведении подземного сооружения закрытым способом в слабых грунтах включает в себя бурение скважин и первоначальное создание предварительно закрепленных стабилизирующих слоев породного массива между фундаментом здания и областью размещения подземного сооружения, возводимого с помощью подземной проходки, с образованием чередования закрепленных стабилизирующих слоев и незакрепленных расширяемых слоев породного массива. Последующее инъецирование твердеющего раствора в незакрепленные расширяемые слои породного массива, расположенные между фундаментом здания, закрепленные стабилизирующими слоями и возводимым подземным сооружением, проводимого в процессе возведения подземного сооружения с учетом развития мульды осадок. В незакрепленных расширяемых слоях породного массива перед началом возведения подземного сооружения устанавливают датчики для измерения параметров напряжений и деформаций в породном массиве, для чего производят бурение дополнительных скважин для установки датчиков. Измерения параметров начинают до проходки подземной выработки по возведению подземного сооружения и при их изменении во время подземной проходки инъецируют в эти слои твердеющий раствор до восстановления величин параметров напряжений и деформаций в породном массиве между фундаментом здания и областью размещения подземного сооружения, определенных до начала подземной проходки. Технический результат состоит в повышении точности времени начала и окончания работ по инъекции твердеющего раствора и снижении объемов расходуемых материалов для устранения деформаций грунта под фундаментами зданий и сооружений при подземной проходке во время сооружения, например, тоннеля метрополитена. 2 ил.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2020</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjLsKwkAQRdNYiPoP8wMW8UFsk9lJshh3YHaWYBWCrJWPQPx_VEhhaXU5nMOdJ_cTac0GuARkEUK17L7kQ-GtIYcEKhyqGnIF-gmCMyTVRzkDXiWgBiEozoANezIwHVsHLeVH8Gwbv0xm1_42xtW0iwRKUqzXcXh2cRz6S3zEVydhk6X77LDDdPtH8gbKKzbJ</recordid><startdate>20200303</startdate><enddate>20200303</enddate><creator>Starkov Aleksej Yurevich</creator><creator>Lebedev Mikhail Olegovich</creator><creator>Maslak Vladimir Aleksandrovich</creator><creator>Bezrodnyj Konstantin Petrovich</creator><scope>EVB</scope></search><sort><creationdate>20200303</creationdate><title>METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS</title><author>Starkov Aleksej Yurevich ; Lebedev Mikhail Olegovich ; Maslak Vladimir Aleksandrovich ; Bezrodnyj Konstantin Petrovich</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2715784C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2020</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>Starkov Aleksej Yurevich</creatorcontrib><creatorcontrib>Lebedev Mikhail Olegovich</creatorcontrib><creatorcontrib>Maslak Vladimir Aleksandrovich</creatorcontrib><creatorcontrib>Bezrodnyj Konstantin Petrovich</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Starkov Aleksej Yurevich</au><au>Lebedev Mikhail Olegovich</au><au>Maslak Vladimir Aleksandrovich</au><au>Bezrodnyj Konstantin Petrovich</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS</title><date>2020-03-03</date><risdate>2020</risdate><abstract>FIELD: construction.SUBSTANCE: invention relates to construction and construction of buried structures, for example, tunnels and subway stations. Method of correction of subsidence trough at erection of underground structure by closed method in weak soils includes drilling of wells and initial creation of pre-fixed stabilizing layers of rock massif between foundation of building and area of arrangement of underground structure erected with the help of underground tunneling, with formation of alternating fixed stabilizing layers and loose extensible layers of rock mass. Further, the hardening solution is injected into loose expandable layers of the rock mass, located between the foundation of the building, fixed with stabilizing layers and erected underground structure, which is carried out during erection of the underground structure, taking into account the development of subsidence trough. In unfilled expanded layers of rock mass before construction of underground structure sensors are installed to measure parameters of stresses and deformations in rock mass, for this purpose additional wells are drilled for installation of sensors. Parameters are measured prior to driving an underground mine by erection of an underground structure and when they are changed during underground drilling, a hardening solution is injected into these layers until the values of stress and strain parameters in the rock massif between the foundation of the building and area of underground structure location, determined before underground tunneling.EFFECT: technical result consists in improvement of accuracy of time of beginning and completion of works on injection of hardening solution and reduction of volumes of consumed materials for elimination of deformation of soil under foundations of buildings and structures at underground driving during construction, for example, tunnel of underground.1 cl, 2 dwg Изобретение относится к строительству и касается возведения заглубленных сооружений, например тоннелей и станций метрополитена. Способ коррекции мульды осадок при возведении подземного сооружения закрытым способом в слабых грунтах включает в себя бурение скважин и первоначальное создание предварительно закрепленных стабилизирующих слоев породного массива между фундаментом здания и областью размещения подземного сооружения, возводимого с помощью подземной проходки, с образованием чередования закрепленных стабилизирующих слоев и незакрепленных расширяемых слоев породного массива. Последующее инъецирование твердеющего раствора в незакрепленные расширяемые слои породного массива, расположенные между фундаментом здания, закрепленные стабилизирующими слоями и возводимым подземным сооружением, проводимого в процессе возведения подземного сооружения с учетом развития мульды осадок. В незакрепленных расширяемых слоях породного массива перед началом возведения подземного сооружения устанавливают датчики для измерения параметров напряжений и деформаций в породном массиве, для чего производят бурение дополнительных скважин для установки датчиков. Измерения параметров начинают до проходки подземной выработки по возведению подземного сооружения и при их изменении во время подземной проходки инъецируют в эти слои твердеющий раствор до восстановления величин параметров напряжений и деформаций в породном массиве между фундаментом здания и областью размещения подземного сооружения, определенных до начала подземной проходки. Технический результат состоит в повышении точности времени начала и окончания работ по инъекции твердеющего раствора и снижении объемов расходуемых материалов для устранения деформаций грунта под фундаментами зданий и сооружений при подземной проходке во время сооружения, например, тоннеля метрополитена. 2 ил.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; rus
recordid cdi_epo_espacenet_RU2715784C1
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title METHOD OF CORRECTION OF SUBSIDENCE TROUGH AT ERECTION OF UNDERGROUND STRUCTURE BY CLOSED METHOD IN WEAK SOILS
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-27T03%3A47%3A46IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Starkov%20Aleksej%20Yurevich&rft.date=2020-03-03&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2715784C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true