METHOD OF CONSTRUCTION OF WELLS WITH LARGE DIAMETER
FIELD: mining.SUBSTANCE: invention relates to mining, it is used for expansion of pilot wells at mining and extraction of minerals. Method of constructing wells with large diameter includes drilling a pilot well with a drill rig with a drill string, drilling of said pilot well to preset diameter by...
Gespeichert in:
Hauptverfasser: | , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | Karpov Vladimir Nikolaevich Eremenko Vitalij Andreevich Goldobin Vyacheslav Andreevich Lantsevich Mikhail Aleksandrovich Levenson Samuil Yakovlevich Timonin Vladimir Vladimirovich Tkachuk Andrej Konstantinovich Chernienkov Evgenij Mikhajlovich Zabolotskaya Nadezhda Nazimovna |
description | FIELD: mining.SUBSTANCE: invention relates to mining, it is used for expansion of pilot wells at mining and extraction of minerals. Method of constructing wells with large diameter includes drilling a pilot well with a drill rig with a drill string, drilling of said pilot well to preset diameter by expander equipped with rock cutting tool and installed in lower part of drill string, removal of drill cuttings from transport and sorting working, at that, movement of expander is performed by means of winch with rope. Drilling machine and said winch with rope are installed on movable platform fixed above the constructed well. To drill pilot well, a tangential-percussion reamer is used, equipped with a centering device directed to pilot well, and rock-breaking tool in form of at least two blocks of movable elements, equipped with separate motors for rotation of shafts of said movable elements.EFFECT: enabling increase in the pilot well drilling-up rate with the least energy-intensive expander action on the rock mass, enlarging the application area of the method by means of the pilot well drilling and with the day surface drilling, and using underground workings, using simple, less expensive and more wear-resistant equipment.3 cl, 5 dwg
Изобретение относится к горному делу, используется для расширения пилот-скважин при разработке и добыче полезных ископаемых. Способ сооружения скважин большого диаметра включает бурение пилот-скважины буровым станком с буровой колонной, разбуривание упомянутой пилот-скважины до заданного диаметра расширителем, оснащенным породоразрушающим инструментом и установленным в нижней части буровой колонны, удаление бурового шлама из транспортно-сортировочной выработки, при этом перемещение расширителя осуществляют посредством лебёдки с тросом. Буровой станок и указанную лебёдку с тросом устанавливают на передвижную платформу, зафиксированную над сооружаемой скважиной. Для разбуривания пилот-скважины используют расширитель тангенциально-ударного действия, оборудованный центрирующим устройством, направленным в пилот-скважину, и породоразрушающим инструментом в виде по меньшей мере двух блоков подвижных элементов, оснащенных отдельными двигателями для вращения валов упомянутых подвижных элементов. Обеспечивается увеличение скорости разбуривания пилот-скважины при наименее энергоемком воздействии расширителем на породный массив, расширение области применения способа путём возможности разбуривания пилот-скважины и с дневной поверхности, и с и |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2709863C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2709863C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2709863C13</originalsourceid><addsrcrecordid>eNrjZDD2dQ3x8HdR8HdTcPb3Cw4JCnUO8fT3A_HDXX18ghXCPUM8FHwcg9xdFVw8HYGqXYN4GFjTEnOKU3mhNDeDgptriLOHbmpBfnxqcUFicmpeakl8UKiRuYGlhZmxs6ExEUoAVr0m3w</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF CONSTRUCTION OF WELLS WITH LARGE DIAMETER</title><source>esp@cenet</source><creator>Karpov Vladimir Nikolaevich ; Eremenko Vitalij Andreevich ; Goldobin Vyacheslav Andreevich ; Lantsevich Mikhail Aleksandrovich ; Levenson Samuil Yakovlevich ; Timonin Vladimir Vladimirovich ; Tkachuk Andrej Konstantinovich ; Chernienkov Evgenij Mikhajlovich ; Zabolotskaya Nadezhda Nazimovna</creator><creatorcontrib>Karpov Vladimir Nikolaevich ; Eremenko Vitalij Andreevich ; Goldobin Vyacheslav Andreevich ; Lantsevich Mikhail Aleksandrovich ; Levenson Samuil Yakovlevich ; Timonin Vladimir Vladimirovich ; Tkachuk Andrej Konstantinovich ; Chernienkov Evgenij Mikhajlovich ; Zabolotskaya Nadezhda Nazimovna</creatorcontrib><description>FIELD: mining.SUBSTANCE: invention relates to mining, it is used for expansion of pilot wells at mining and extraction of minerals. Method of constructing wells with large diameter includes drilling a pilot well with a drill rig with a drill string, drilling of said pilot well to preset diameter by expander equipped with rock cutting tool and installed in lower part of drill string, removal of drill cuttings from transport and sorting working, at that, movement of expander is performed by means of winch with rope. Drilling machine and said winch with rope are installed on movable platform fixed above the constructed well. To drill pilot well, a tangential-percussion reamer is used, equipped with a centering device directed to pilot well, and rock-breaking tool in form of at least two blocks of movable elements, equipped with separate motors for rotation of shafts of said movable elements.EFFECT: enabling increase in the pilot well drilling-up rate with the least energy-intensive expander action on the rock mass, enlarging the application area of the method by means of the pilot well drilling and with the day surface drilling, and using underground workings, using simple, less expensive and more wear-resistant equipment.3 cl, 5 dwg
Изобретение относится к горному делу, используется для расширения пилот-скважин при разработке и добыче полезных ископаемых. Способ сооружения скважин большого диаметра включает бурение пилот-скважины буровым станком с буровой колонной, разбуривание упомянутой пилот-скважины до заданного диаметра расширителем, оснащенным породоразрушающим инструментом и установленным в нижней части буровой колонны, удаление бурового шлама из транспортно-сортировочной выработки, при этом перемещение расширителя осуществляют посредством лебёдки с тросом. Буровой станок и указанную лебёдку с тросом устанавливают на передвижную платформу, зафиксированную над сооружаемой скважиной. Для разбуривания пилот-скважины используют расширитель тангенциально-ударного действия, оборудованный центрирующим устройством, направленным в пилот-скважину, и породоразрушающим инструментом в виде по меньшей мере двух блоков подвижных элементов, оснащенных отдельными двигателями для вращения валов упомянутых подвижных элементов. Обеспечивается увеличение скорости разбуривания пилот-скважины при наименее энергоемком воздействии расширителем на породный массив, расширение области применения способа путём возможности разбуривания пилот-скважины и с дневной поверхности, и с использованием подземных выработок, использование простого, менее дорогостоящего и более износостойкого оборудования. 2 з.п. ф-лы, 5 ил.</description><language>eng ; rus</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; MINING OR QUARRYING ; SHAFTS ; TUNNELS</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20191223&DB=EPODOC&CC=RU&NR=2709863C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20191223&DB=EPODOC&CC=RU&NR=2709863C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Karpov Vladimir Nikolaevich</creatorcontrib><creatorcontrib>Eremenko Vitalij Andreevich</creatorcontrib><creatorcontrib>Goldobin Vyacheslav Andreevich</creatorcontrib><creatorcontrib>Lantsevich Mikhail Aleksandrovich</creatorcontrib><creatorcontrib>Levenson Samuil Yakovlevich</creatorcontrib><creatorcontrib>Timonin Vladimir Vladimirovich</creatorcontrib><creatorcontrib>Tkachuk Andrej Konstantinovich</creatorcontrib><creatorcontrib>Chernienkov Evgenij Mikhajlovich</creatorcontrib><creatorcontrib>Zabolotskaya Nadezhda Nazimovna</creatorcontrib><title>METHOD OF CONSTRUCTION OF WELLS WITH LARGE DIAMETER</title><description>FIELD: mining.SUBSTANCE: invention relates to mining, it is used for expansion of pilot wells at mining and extraction of minerals. Method of constructing wells with large diameter includes drilling a pilot well with a drill rig with a drill string, drilling of said pilot well to preset diameter by expander equipped with rock cutting tool and installed in lower part of drill string, removal of drill cuttings from transport and sorting working, at that, movement of expander is performed by means of winch with rope. Drilling machine and said winch with rope are installed on movable platform fixed above the constructed well. To drill pilot well, a tangential-percussion reamer is used, equipped with a centering device directed to pilot well, and rock-breaking tool in form of at least two blocks of movable elements, equipped with separate motors for rotation of shafts of said movable elements.EFFECT: enabling increase in the pilot well drilling-up rate with the least energy-intensive expander action on the rock mass, enlarging the application area of the method by means of the pilot well drilling and with the day surface drilling, and using underground workings, using simple, less expensive and more wear-resistant equipment.3 cl, 5 dwg
Изобретение относится к горному делу, используется для расширения пилот-скважин при разработке и добыче полезных ископаемых. Способ сооружения скважин большого диаметра включает бурение пилот-скважины буровым станком с буровой колонной, разбуривание упомянутой пилот-скважины до заданного диаметра расширителем, оснащенным породоразрушающим инструментом и установленным в нижней части буровой колонны, удаление бурового шлама из транспортно-сортировочной выработки, при этом перемещение расширителя осуществляют посредством лебёдки с тросом. Буровой станок и указанную лебёдку с тросом устанавливают на передвижную платформу, зафиксированную над сооружаемой скважиной. Для разбуривания пилот-скважины используют расширитель тангенциально-ударного действия, оборудованный центрирующим устройством, направленным в пилот-скважину, и породоразрушающим инструментом в виде по меньшей мере двух блоков подвижных элементов, оснащенных отдельными двигателями для вращения валов упомянутых подвижных элементов. Обеспечивается увеличение скорости разбуривания пилот-скважины при наименее энергоемком воздействии расширителем на породный массив, расширение области применения способа путём возможности разбуривания пилот-скважины и с дневной поверхности, и с использованием подземных выработок, использование простого, менее дорогостоящего и более износостойкого оборудования. 2 з.п. ф-лы, 5 ил.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>MINING OR QUARRYING</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDD2dQ3x8HdR8HdTcPb3Cw4JCnUO8fT3A_HDXX18ghXCPUM8FHwcg9xdFVw8HYGqXYN4GFjTEnOKU3mhNDeDgptriLOHbmpBfnxqcUFicmpeakl8UKiRuYGlhZmxs6ExEUoAVr0m3w</recordid><startdate>20191223</startdate><enddate>20191223</enddate><creator>Karpov Vladimir Nikolaevich</creator><creator>Eremenko Vitalij Andreevich</creator><creator>Goldobin Vyacheslav Andreevich</creator><creator>Lantsevich Mikhail Aleksandrovich</creator><creator>Levenson Samuil Yakovlevich</creator><creator>Timonin Vladimir Vladimirovich</creator><creator>Tkachuk Andrej Konstantinovich</creator><creator>Chernienkov Evgenij Mikhajlovich</creator><creator>Zabolotskaya Nadezhda Nazimovna</creator><scope>EVB</scope></search><sort><creationdate>20191223</creationdate><title>METHOD OF CONSTRUCTION OF WELLS WITH LARGE DIAMETER</title><author>Karpov Vladimir Nikolaevich ; Eremenko Vitalij Andreevich ; Goldobin Vyacheslav Andreevich ; Lantsevich Mikhail Aleksandrovich ; Levenson Samuil Yakovlevich ; Timonin Vladimir Vladimirovich ; Tkachuk Andrej Konstantinovich ; Chernienkov Evgenij Mikhajlovich ; Zabolotskaya Nadezhda Nazimovna</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2709863C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2019</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>MINING OR QUARRYING</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>Karpov Vladimir Nikolaevich</creatorcontrib><creatorcontrib>Eremenko Vitalij Andreevich</creatorcontrib><creatorcontrib>Goldobin Vyacheslav Andreevich</creatorcontrib><creatorcontrib>Lantsevich Mikhail Aleksandrovich</creatorcontrib><creatorcontrib>Levenson Samuil Yakovlevich</creatorcontrib><creatorcontrib>Timonin Vladimir Vladimirovich</creatorcontrib><creatorcontrib>Tkachuk Andrej Konstantinovich</creatorcontrib><creatorcontrib>Chernienkov Evgenij Mikhajlovich</creatorcontrib><creatorcontrib>Zabolotskaya Nadezhda Nazimovna</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Karpov Vladimir Nikolaevich</au><au>Eremenko Vitalij Andreevich</au><au>Goldobin Vyacheslav Andreevich</au><au>Lantsevich Mikhail Aleksandrovich</au><au>Levenson Samuil Yakovlevich</au><au>Timonin Vladimir Vladimirovich</au><au>Tkachuk Andrej Konstantinovich</au><au>Chernienkov Evgenij Mikhajlovich</au><au>Zabolotskaya Nadezhda Nazimovna</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF CONSTRUCTION OF WELLS WITH LARGE DIAMETER</title><date>2019-12-23</date><risdate>2019</risdate><abstract>FIELD: mining.SUBSTANCE: invention relates to mining, it is used for expansion of pilot wells at mining and extraction of minerals. Method of constructing wells with large diameter includes drilling a pilot well with a drill rig with a drill string, drilling of said pilot well to preset diameter by expander equipped with rock cutting tool and installed in lower part of drill string, removal of drill cuttings from transport and sorting working, at that, movement of expander is performed by means of winch with rope. Drilling machine and said winch with rope are installed on movable platform fixed above the constructed well. To drill pilot well, a tangential-percussion reamer is used, equipped with a centering device directed to pilot well, and rock-breaking tool in form of at least two blocks of movable elements, equipped with separate motors for rotation of shafts of said movable elements.EFFECT: enabling increase in the pilot well drilling-up rate with the least energy-intensive expander action on the rock mass, enlarging the application area of the method by means of the pilot well drilling and with the day surface drilling, and using underground workings, using simple, less expensive and more wear-resistant equipment.3 cl, 5 dwg
Изобретение относится к горному делу, используется для расширения пилот-скважин при разработке и добыче полезных ископаемых. Способ сооружения скважин большого диаметра включает бурение пилот-скважины буровым станком с буровой колонной, разбуривание упомянутой пилот-скважины до заданного диаметра расширителем, оснащенным породоразрушающим инструментом и установленным в нижней части буровой колонны, удаление бурового шлама из транспортно-сортировочной выработки, при этом перемещение расширителя осуществляют посредством лебёдки с тросом. Буровой станок и указанную лебёдку с тросом устанавливают на передвижную платформу, зафиксированную над сооружаемой скважиной. Для разбуривания пилот-скважины используют расширитель тангенциально-ударного действия, оборудованный центрирующим устройством, направленным в пилот-скважину, и породоразрушающим инструментом в виде по меньшей мере двух блоков подвижных элементов, оснащенных отдельными двигателями для вращения валов упомянутых подвижных элементов. Обеспечивается увеличение скорости разбуривания пилот-скважины при наименее энергоемком воздействии расширителем на породный массив, расширение области применения способа путём возможности разбуривания пилот-скважины и с дневной поверхности, и с использованием подземных выработок, использование простого, менее дорогостоящего и более износостойкого оборудования. 2 з.п. ф-лы, 5 ил.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; rus |
recordid | cdi_epo_espacenet_RU2709863C1 |
source | esp@cenet |
subjects | EARTH DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING MINING OR QUARRYING SHAFTS TUNNELS |
title | METHOD OF CONSTRUCTION OF WELLS WITH LARGE DIAMETER |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T02%3A34%3A47IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Karpov%20Vladimir%20Nikolaevich&rft.date=2019-12-23&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2709863C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |