METHOD OF MANAGING GEOMECHANICAL CONDITION OF ROCK MASSIF

FIELD: mining.SUBSTANCE: invention relates to mining and can be used in the development of mineral deposits in the chamber and pillar systems of development with the laying of the goaf. This goal is achieved by defining and strengthening only that part of the inter-chamber pillar in which its deform...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: Postavnin Boris Nikolaevich, Trubetskoj Kliment Nikolaevich, Esina Ekaterina Nikolaevna, Iofis Moisej Abramovich, Fedorov Evgenij Vyacheslavovich, Krasyukova Elena Vasilevna
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator Postavnin Boris Nikolaevich
Trubetskoj Kliment Nikolaevich
Esina Ekaterina Nikolaevna
Iofis Moisej Abramovich
Fedorov Evgenij Vyacheslavovich
Krasyukova Elena Vasilevna
description FIELD: mining.SUBSTANCE: invention relates to mining and can be used in the development of mineral deposits in the chamber and pillar systems of development with the laying of the goaf. This goal is achieved by defining and strengthening only that part of the inter-chamber pillar in which its deformations exceed the permissible limits, that is, by partial laying of the developed space in the case of chamber development systems, for this, in accordance with the source data and the geometrical parameters of the backfill site, a plot of load distribution - γH and soil deposits - γH+γh on the roof of the reservoir is built, the allowable load (allowable pressure) on the ground pillar Pis determined, the line passing through the intersection point of these two graphs determines the minimum required bookmark level, and the tab itself of the worked-out space is produced below the intersection point of these diagrams, that is, where the calculated pressure on the cell is greater than the allowable one, taking into account the engineering calculation error equal to 20-30 %.EFFECT: technical result is an increase in the efficiency of the backfilling operations by partially laying the worked-out space to the level of permissible pressure on the pillar ground.1 cl, 1 dwg Изобретение относится к горному делу и может быть использовано при разработке месторождений полезных ископаемых при камерной и камерно-столбовой системах разработки с закладкой выработанного пространства. Техническим результатом является повышение эффективности ведения закладочных работ путем частичной закладки выработанного пространства до уровня допустимого давления на почву целика. Указанная цель достигается посредством определения и укрепления только той части междукамерного целика, в которой его деформации превышают допустимые пределы, т.е. путем частичной закладки выработанного пространства при камерных системах разработки, для этого, в соответствии с исходными данными и геометрическими параметрами участка закладочных работ, строят эпюру распределения нагрузки на кровлю залежи - γН и почву залежи - γН+γh, определяют допустимую нагрузку (допустимое давление) на почву целика Р, линия, проходящая через точку пересечения этих двух графиков, определяет минимально необходимый уровень закладки, а саму закладку выработанного пространства производят ниже точки пересечения этих эпюр, то есть там, где расчетное давление на целик больше допустимого, с учетом погрешности инженерных расчетов, равной 20-30%. 1
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2684647C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2684647C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2684647C13</originalsourceid><addsrcrecordid>eNrjZLD0dQ3x8HdR8HdT8HX0c3T39HNXcHf193V19nD083R29FFw9vdz8Qzx9PcDqQnyd_YGKgwO9nTjYWBNS8wpTuWF0twMCm6uIc4euqkF-fGpxQWJyal5qSXxQaFGZhYmZibmzobGRCgBAB0TKEA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF MANAGING GEOMECHANICAL CONDITION OF ROCK MASSIF</title><source>esp@cenet</source><creator>Postavnin Boris Nikolaevich ; Trubetskoj Kliment Nikolaevich ; Esina Ekaterina Nikolaevna ; Iofis Moisej Abramovich ; Fedorov Evgenij Vyacheslavovich ; Krasyukova Elena Vasilevna</creator><creatorcontrib>Postavnin Boris Nikolaevich ; Trubetskoj Kliment Nikolaevich ; Esina Ekaterina Nikolaevna ; Iofis Moisej Abramovich ; Fedorov Evgenij Vyacheslavovich ; Krasyukova Elena Vasilevna</creatorcontrib><description>FIELD: mining.SUBSTANCE: invention relates to mining and can be used in the development of mineral deposits in the chamber and pillar systems of development with the laying of the goaf. This goal is achieved by defining and strengthening only that part of the inter-chamber pillar in which its deformations exceed the permissible limits, that is, by partial laying of the developed space in the case of chamber development systems, for this, in accordance with the source data and the geometrical parameters of the backfill site, a plot of load distribution - γH and soil deposits - γH+γh on the roof of the reservoir is built, the allowable load (allowable pressure) on the ground pillar Pis determined, the line passing through the intersection point of these two graphs determines the minimum required bookmark level, and the tab itself of the worked-out space is produced below the intersection point of these diagrams, that is, where the calculated pressure on the cell is greater than the allowable one, taking into account the engineering calculation error equal to 20-30 %.EFFECT: technical result is an increase in the efficiency of the backfilling operations by partially laying the worked-out space to the level of permissible pressure on the pillar ground.1 cl, 1 dwg Изобретение относится к горному делу и может быть использовано при разработке месторождений полезных ископаемых при камерной и камерно-столбовой системах разработки с закладкой выработанного пространства. Техническим результатом является повышение эффективности ведения закладочных работ путем частичной закладки выработанного пространства до уровня допустимого давления на почву целика. Указанная цель достигается посредством определения и укрепления только той части междукамерного целика, в которой его деформации превышают допустимые пределы, т.е. путем частичной закладки выработанного пространства при камерных системах разработки, для этого, в соответствии с исходными данными и геометрическими параметрами участка закладочных работ, строят эпюру распределения нагрузки на кровлю залежи - γН и почву залежи - γН+γh, определяют допустимую нагрузку (допустимое давление) на почву целика Р, линия, проходящая через точку пересечения этих двух графиков, определяет минимально необходимый уровень закладки, а саму закладку выработанного пространства производят ниже точки пересечения этих эпюр, то есть там, где расчетное давление на целик больше допустимого, с учетом погрешности инженерных расчетов, равной 20-30%. 1 ил.</description><language>eng ; rus</language><subject>EARTH DRILLING ; FIXED CONSTRUCTIONS ; MINING ; SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><creationdate>2019</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190411&amp;DB=EPODOC&amp;CC=RU&amp;NR=2684647C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20190411&amp;DB=EPODOC&amp;CC=RU&amp;NR=2684647C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>Postavnin Boris Nikolaevich</creatorcontrib><creatorcontrib>Trubetskoj Kliment Nikolaevich</creatorcontrib><creatorcontrib>Esina Ekaterina Nikolaevna</creatorcontrib><creatorcontrib>Iofis Moisej Abramovich</creatorcontrib><creatorcontrib>Fedorov Evgenij Vyacheslavovich</creatorcontrib><creatorcontrib>Krasyukova Elena Vasilevna</creatorcontrib><title>METHOD OF MANAGING GEOMECHANICAL CONDITION OF ROCK MASSIF</title><description>FIELD: mining.SUBSTANCE: invention relates to mining and can be used in the development of mineral deposits in the chamber and pillar systems of development with the laying of the goaf. This goal is achieved by defining and strengthening only that part of the inter-chamber pillar in which its deformations exceed the permissible limits, that is, by partial laying of the developed space in the case of chamber development systems, for this, in accordance with the source data and the geometrical parameters of the backfill site, a plot of load distribution - γH and soil deposits - γH+γh on the roof of the reservoir is built, the allowable load (allowable pressure) on the ground pillar Pis determined, the line passing through the intersection point of these two graphs determines the minimum required bookmark level, and the tab itself of the worked-out space is produced below the intersection point of these diagrams, that is, where the calculated pressure on the cell is greater than the allowable one, taking into account the engineering calculation error equal to 20-30 %.EFFECT: technical result is an increase in the efficiency of the backfilling operations by partially laying the worked-out space to the level of permissible pressure on the pillar ground.1 cl, 1 dwg Изобретение относится к горному делу и может быть использовано при разработке месторождений полезных ископаемых при камерной и камерно-столбовой системах разработки с закладкой выработанного пространства. Техническим результатом является повышение эффективности ведения закладочных работ путем частичной закладки выработанного пространства до уровня допустимого давления на почву целика. Указанная цель достигается посредством определения и укрепления только той части междукамерного целика, в которой его деформации превышают допустимые пределы, т.е. путем частичной закладки выработанного пространства при камерных системах разработки, для этого, в соответствии с исходными данными и геометрическими параметрами участка закладочных работ, строят эпюру распределения нагрузки на кровлю залежи - γН и почву залежи - γН+γh, определяют допустимую нагрузку (допустимое давление) на почву целика Р, линия, проходящая через точку пересечения этих двух графиков, определяет минимально необходимый уровень закладки, а саму закладку выработанного пространства производят ниже точки пересечения этих эпюр, то есть там, где расчетное давление на целик больше допустимого, с учетом погрешности инженерных расчетов, равной 20-30%. 1 ил.</description><subject>EARTH DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2019</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLD0dQ3x8HdR8HdT8HX0c3T39HNXcHf193V19nD083R29FFw9vdz8Qzx9PcDqQnyd_YGKgwO9nTjYWBNS8wpTuWF0twMCm6uIc4euqkF-fGpxQWJyal5qSXxQaFGZhYmZibmzobGRCgBAB0TKEA</recordid><startdate>20190411</startdate><enddate>20190411</enddate><creator>Postavnin Boris Nikolaevich</creator><creator>Trubetskoj Kliment Nikolaevich</creator><creator>Esina Ekaterina Nikolaevna</creator><creator>Iofis Moisej Abramovich</creator><creator>Fedorov Evgenij Vyacheslavovich</creator><creator>Krasyukova Elena Vasilevna</creator><scope>EVB</scope></search><sort><creationdate>20190411</creationdate><title>METHOD OF MANAGING GEOMECHANICAL CONDITION OF ROCK MASSIF</title><author>Postavnin Boris Nikolaevich ; Trubetskoj Kliment Nikolaevich ; Esina Ekaterina Nikolaevna ; Iofis Moisej Abramovich ; Fedorov Evgenij Vyacheslavovich ; Krasyukova Elena Vasilevna</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2684647C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2019</creationdate><topic>EARTH DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>Postavnin Boris Nikolaevich</creatorcontrib><creatorcontrib>Trubetskoj Kliment Nikolaevich</creatorcontrib><creatorcontrib>Esina Ekaterina Nikolaevna</creatorcontrib><creatorcontrib>Iofis Moisej Abramovich</creatorcontrib><creatorcontrib>Fedorov Evgenij Vyacheslavovich</creatorcontrib><creatorcontrib>Krasyukova Elena Vasilevna</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>Postavnin Boris Nikolaevich</au><au>Trubetskoj Kliment Nikolaevich</au><au>Esina Ekaterina Nikolaevna</au><au>Iofis Moisej Abramovich</au><au>Fedorov Evgenij Vyacheslavovich</au><au>Krasyukova Elena Vasilevna</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF MANAGING GEOMECHANICAL CONDITION OF ROCK MASSIF</title><date>2019-04-11</date><risdate>2019</risdate><abstract>FIELD: mining.SUBSTANCE: invention relates to mining and can be used in the development of mineral deposits in the chamber and pillar systems of development with the laying of the goaf. This goal is achieved by defining and strengthening only that part of the inter-chamber pillar in which its deformations exceed the permissible limits, that is, by partial laying of the developed space in the case of chamber development systems, for this, in accordance with the source data and the geometrical parameters of the backfill site, a plot of load distribution - γH and soil deposits - γH+γh on the roof of the reservoir is built, the allowable load (allowable pressure) on the ground pillar Pis determined, the line passing through the intersection point of these two graphs determines the minimum required bookmark level, and the tab itself of the worked-out space is produced below the intersection point of these diagrams, that is, where the calculated pressure on the cell is greater than the allowable one, taking into account the engineering calculation error equal to 20-30 %.EFFECT: technical result is an increase in the efficiency of the backfilling operations by partially laying the worked-out space to the level of permissible pressure on the pillar ground.1 cl, 1 dwg Изобретение относится к горному делу и может быть использовано при разработке месторождений полезных ископаемых при камерной и камерно-столбовой системах разработки с закладкой выработанного пространства. Техническим результатом является повышение эффективности ведения закладочных работ путем частичной закладки выработанного пространства до уровня допустимого давления на почву целика. Указанная цель достигается посредством определения и укрепления только той части междукамерного целика, в которой его деформации превышают допустимые пределы, т.е. путем частичной закладки выработанного пространства при камерных системах разработки, для этого, в соответствии с исходными данными и геометрическими параметрами участка закладочных работ, строят эпюру распределения нагрузки на кровлю залежи - γН и почву залежи - γН+γh, определяют допустимую нагрузку (допустимое давление) на почву целика Р, линия, проходящая через точку пересечения этих двух графиков, определяет минимально необходимый уровень закладки, а саму закладку выработанного пространства производят ниже точки пересечения этих эпюр, то есть там, где расчетное давление на целик больше допустимого, с учетом погрешности инженерных расчетов, равной 20-30%. 1 ил.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; rus
recordid cdi_epo_espacenet_RU2684647C1
source esp@cenet
subjects EARTH DRILLING
FIXED CONSTRUCTIONS
MINING
SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, ORDRAINING IN OR OF MINES OR TUNNELS
title METHOD OF MANAGING GEOMECHANICAL CONDITION OF ROCK MASSIF
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-25T17%3A00%3A46IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=Postavnin%20Boris%20Nikolaevich&rft.date=2019-04-11&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2684647C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true