WELL CONVERSION METHOD, INCLUDING FLOODED WELLS, FOR OPERATION WITH TWO PRODUCTION STRINGS AND DEVICE FOR ITS IMPLEMENTATION
FIELD: oil and gas industry.SUBSTANCE: method running-in and suspension of the central production string, installation of the upper part of X-mas tree, refitting of the wellhead by installation of system for monitoring and control of the well operation, performance of gas-dynamics research, flow sta...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | FILIPPOV ANDREJ GENNAD'EVICH DIKAMOV DMITRIJ VLADIMIROVICH SHULJATIKOV IGOR' VLADIMIROVICH DONCHENKO MIKHAIL ALEKSANDROVICH JAREMENKO MIKHAIL VITAL'EVICH MINLIKAEV VALERIJ ZIRJAKOVICH |
description | FIELD: oil and gas industry.SUBSTANCE: method running-in and suspension of the central production string, installation of the upper part of X-mas tree, refitting of the wellhead by installation of system for monitoring and control of the well operation, performance of gas-dynamics research, flow start-up of the well through two production ring and system for monitoring and control of the well operation. At the beginning and ending of the main production string the upper and lower bits are installed respectively and a plug and a pilot-operated valve in closed position is joined to the upper and lower bits. Then the central production string is mounted to the launching and lifting gear, the master valve is closed, a radial pipe holder is installed at the master valve, an a stop valve is installed over the master valve at the pipe holder, a preventer is joined to it and a double-chamber pressuriser is installed at the preventer, an injector is connected to the upper butt end of the pressuriser and a launching and lifting mechanism is installed in direct vicinity from the well. Thereafter the central production string is passed by its end through the injector, which is used to move the central production string, the central production string is passed through the double-chamber pressuriser, pressure is supplied to its closing hydraulic cavities thus compressing packing seals of the upper and lower chamber of the double-chamber pressuriser and the central production string is sealed. Then it is run down up to the master valve level, the central production string is run down to the position when the upper bit with plug is at the level of the injector upper butt end, the rod is connected to the plug, pressure is delivered to the opening hydraulic cavity in the upper chamber of the pressuriser, in result the packing seal of the upper chamber of the double-chamber pressuriser is released, the central production string is run down to the position when the plug is below the packing seal of the upper chamber in the double-chamber pressuriser. Pressure is supplied to the closing hydraulic cavity of the upper chamber in the double-chamber pressuriser thus sealing the rod. Pressure is supplied to the opening hydraulic cavity of the lower chamber in the pressuriser, in result the packing seal of the lower chamber in the double-chamber pressuriser is released, the central production string is run down to the position when the plug is below the packing seal of the lower cha |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2523270C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2523270C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2523270C13</originalsourceid><addsrcrecordid>eNqNy8EKgkAQxnEvHaJ6h3kAg1Kis-yOObDuyO6sHkViO0UJduzhS-kBOn3w8f-tk3eHxoBi26LzxBZqlIp1CmSVCZrsBUrDrFHDXPoUSnbADbpC5rwjqUA6hsaxDmr5vLiv81BYDRpbUrggEg9UNwZrtLLobbK6Dfcp7n67SaBEUdU-js8-TuNwjY_46l3ITlmenQ_qmP-RfAA0VTsQ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>WELL CONVERSION METHOD, INCLUDING FLOODED WELLS, FOR OPERATION WITH TWO PRODUCTION STRINGS AND DEVICE FOR ITS IMPLEMENTATION</title><source>esp@cenet</source><creator>FILIPPOV ANDREJ GENNAD'EVICH ; DIKAMOV DMITRIJ VLADIMIROVICH ; SHULJATIKOV IGOR' VLADIMIROVICH ; DONCHENKO MIKHAIL ALEKSANDROVICH ; JAREMENKO MIKHAIL VITAL'EVICH ; MINLIKAEV VALERIJ ZIRJAKOVICH</creator><creatorcontrib>FILIPPOV ANDREJ GENNAD'EVICH ; DIKAMOV DMITRIJ VLADIMIROVICH ; SHULJATIKOV IGOR' VLADIMIROVICH ; DONCHENKO MIKHAIL ALEKSANDROVICH ; JAREMENKO MIKHAIL VITAL'EVICH ; MINLIKAEV VALERIJ ZIRJAKOVICH</creatorcontrib><description>FIELD: oil and gas industry.SUBSTANCE: method running-in and suspension of the central production string, installation of the upper part of X-mas tree, refitting of the wellhead by installation of system for monitoring and control of the well operation, performance of gas-dynamics research, flow start-up of the well through two production ring and system for monitoring and control of the well operation. At the beginning and ending of the main production string the upper and lower bits are installed respectively and a plug and a pilot-operated valve in closed position is joined to the upper and lower bits. Then the central production string is mounted to the launching and lifting gear, the master valve is closed, a radial pipe holder is installed at the master valve, an a stop valve is installed over the master valve at the pipe holder, a preventer is joined to it and a double-chamber pressuriser is installed at the preventer, an injector is connected to the upper butt end of the pressuriser and a launching and lifting mechanism is installed in direct vicinity from the well. Thereafter the central production string is passed by its end through the injector, which is used to move the central production string, the central production string is passed through the double-chamber pressuriser, pressure is supplied to its closing hydraulic cavities thus compressing packing seals of the upper and lower chamber of the double-chamber pressuriser and the central production string is sealed. Then it is run down up to the master valve level, the central production string is run down to the position when the upper bit with plug is at the level of the injector upper butt end, the rod is connected to the plug, pressure is delivered to the opening hydraulic cavity in the upper chamber of the pressuriser, in result the packing seal of the upper chamber of the double-chamber pressuriser is released, the central production string is run down to the position when the plug is below the packing seal of the upper chamber in the double-chamber pressuriser. Pressure is supplied to the closing hydraulic cavity of the upper chamber in the double-chamber pressuriser thus sealing the rod. Pressure is supplied to the opening hydraulic cavity of the lower chamber in the pressuriser, in result the packing seal of the lower chamber in the double-chamber pressuriser is released, the central production string is run down to the position when the plug is below the packing seal of the lower chamber in the double-chamber pressuriser, thereafter pressure is supplied to the closing hydraulic cavity of the lower chamber in the double-chamber pressuriser thus sealing the rod, then the central production string is passed through the preventer and the stop valve placed over the master valve until seating surface of the upper bit coincides with seating surface of the radial pipe holder of the central production string, the upper bit of the central production string is fixed in the radial pipe holder of the central production string by means of radial fixtures, then the plug is removed from the upper bit by the rod, the plug is lifted higher than the level of stop valve placed over the master valve, the above stop valve is closed and pressure is supplied to the opening hydraulic cavities in the double-chamber pressuriser, in result packing seals of the upper and lowers chambers in the pressuriser are released. Thereafter the rod with plug is removed, the BOP preventer is dismounted, the launching and lifting gear is dismounted, the upper part of X-mas tree is mounted to the stop valve placed over the master valve and the above stop valve is opened, the pilot-controlled valve is subject to external action thus fixing it in an open position, in result volumes of the main and the central production strings are united. Additionally invention claims device for method implementation.EFFECT: reduction of labour intensity, costs and time for works performance.2 cl, 7 dwg
Изобретение относится к нефтяной и газовой отраслям промышленности и может быть применено для перевода скважин на эксплуатацию по двум лифтовым колоннам без глушения скважины. Способ включает спуск и подвеску центральной лифтовой колонны, установку верхней части фонтанной арматуры, переоборудование устьевой обвязки путем установки в ее составе управляющего комплекса контроля и управления работой скважины, проведение газодинамических исследований, пуск скважины в шлейф по двум лифтовым колоннам через управляющий комплекс контроля и управления работой скважины. В основную лифтовую колонну скважины на ее начало и конец герметично устанавливают соответственно верхний и нижний наконечники, к верхнему и нижнему наконечникам герметично присоединяют соответственно пробку и управляемый клапан, находящийся в закрытом состоянии. Затем центральную лифтовую колонну монтируют в спускоподъемное устройство, перекрывают коренную задвижку, на коренную задвижку устанавливают радиальный трубодержатель центральной лифтовой колонны, на который устанавливают надкоренную задвижку, к ней присоединяют превентор, на превентор устанавливают двухкамерный герметизатор, к верхнему торцу герметизатора присоединяют инжектор, а в непосредственной близости от скважины устанавливают спускоподъемное устройство. После этого пропускают центральную лифтовую колонну концом через инжектор, с помощью которого в дальнейшем осуществляют перемещение центральной лифтовой колонны, которую пропускают через двухкамерный герметизатор, подают давление в его закрывающие гидравлические полости, тем самым сжимают уплотнительные ман�</description><language>eng ; rus</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2014</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20140720&DB=EPODOC&CC=RU&NR=2523270C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20140720&DB=EPODOC&CC=RU&NR=2523270C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FILIPPOV ANDREJ GENNAD'EVICH</creatorcontrib><creatorcontrib>DIKAMOV DMITRIJ VLADIMIROVICH</creatorcontrib><creatorcontrib>SHULJATIKOV IGOR' VLADIMIROVICH</creatorcontrib><creatorcontrib>DONCHENKO MIKHAIL ALEKSANDROVICH</creatorcontrib><creatorcontrib>JAREMENKO MIKHAIL VITAL'EVICH</creatorcontrib><creatorcontrib>MINLIKAEV VALERIJ ZIRJAKOVICH</creatorcontrib><title>WELL CONVERSION METHOD, INCLUDING FLOODED WELLS, FOR OPERATION WITH TWO PRODUCTION STRINGS AND DEVICE FOR ITS IMPLEMENTATION</title><description>FIELD: oil and gas industry.SUBSTANCE: method running-in and suspension of the central production string, installation of the upper part of X-mas tree, refitting of the wellhead by installation of system for monitoring and control of the well operation, performance of gas-dynamics research, flow start-up of the well through two production ring and system for monitoring and control of the well operation. At the beginning and ending of the main production string the upper and lower bits are installed respectively and a plug and a pilot-operated valve in closed position is joined to the upper and lower bits. Then the central production string is mounted to the launching and lifting gear, the master valve is closed, a radial pipe holder is installed at the master valve, an a stop valve is installed over the master valve at the pipe holder, a preventer is joined to it and a double-chamber pressuriser is installed at the preventer, an injector is connected to the upper butt end of the pressuriser and a launching and lifting mechanism is installed in direct vicinity from the well. Thereafter the central production string is passed by its end through the injector, which is used to move the central production string, the central production string is passed through the double-chamber pressuriser, pressure is supplied to its closing hydraulic cavities thus compressing packing seals of the upper and lower chamber of the double-chamber pressuriser and the central production string is sealed. Then it is run down up to the master valve level, the central production string is run down to the position when the upper bit with plug is at the level of the injector upper butt end, the rod is connected to the plug, pressure is delivered to the opening hydraulic cavity in the upper chamber of the pressuriser, in result the packing seal of the upper chamber of the double-chamber pressuriser is released, the central production string is run down to the position when the plug is below the packing seal of the upper chamber in the double-chamber pressuriser. Pressure is supplied to the closing hydraulic cavity of the upper chamber in the double-chamber pressuriser thus sealing the rod. Pressure is supplied to the opening hydraulic cavity of the lower chamber in the pressuriser, in result the packing seal of the lower chamber in the double-chamber pressuriser is released, the central production string is run down to the position when the plug is below the packing seal of the lower chamber in the double-chamber pressuriser, thereafter pressure is supplied to the closing hydraulic cavity of the lower chamber in the double-chamber pressuriser thus sealing the rod, then the central production string is passed through the preventer and the stop valve placed over the master valve until seating surface of the upper bit coincides with seating surface of the radial pipe holder of the central production string, the upper bit of the central production string is fixed in the radial pipe holder of the central production string by means of radial fixtures, then the plug is removed from the upper bit by the rod, the plug is lifted higher than the level of stop valve placed over the master valve, the above stop valve is closed and pressure is supplied to the opening hydraulic cavities in the double-chamber pressuriser, in result packing seals of the upper and lowers chambers in the pressuriser are released. Thereafter the rod with plug is removed, the BOP preventer is dismounted, the launching and lifting gear is dismounted, the upper part of X-mas tree is mounted to the stop valve placed over the master valve and the above stop valve is opened, the pilot-controlled valve is subject to external action thus fixing it in an open position, in result volumes of the main and the central production strings are united. Additionally invention claims device for method implementation.EFFECT: reduction of labour intensity, costs and time for works performance.2 cl, 7 dwg
Изобретение относится к нефтяной и газовой отраслям промышленности и может быть применено для перевода скважин на эксплуатацию по двум лифтовым колоннам без глушения скважины. Способ включает спуск и подвеску центральной лифтовой колонны, установку верхней части фонтанной арматуры, переоборудование устьевой обвязки путем установки в ее составе управляющего комплекса контроля и управления работой скважины, проведение газодинамических исследований, пуск скважины в шлейф по двум лифтовым колоннам через управляющий комплекс контроля и управления работой скважины. В основную лифтовую колонну скважины на ее начало и конец герметично устанавливают соответственно верхний и нижний наконечники, к верхнему и нижнему наконечникам герметично присоединяют соответственно пробку и управляемый клапан, находящийся в закрытом состоянии. Затем центральную лифтовую колонну монтируют в спускоподъемное устройство, перекрывают коренную задвижку, на коренную задвижку устанавливают радиальный трубодержатель центральной лифтовой колонны, на который устанавливают надкоренную задвижку, к ней присоединяют превентор, на превентор устанавливают двухкамерный герметизатор, к верхнему торцу герметизатора присоединяют инжектор, а в непосредственной близости от скважины устанавливают спускоподъемное устройство. После этого пропускают центральную лифтовую колонну концом через инжектор, с помощью которого в дальнейшем осуществляют перемещение центральной лифтовой колонны, которую пропускают через двухкамерный герметизатор, подают давление в его закрывающие гидравлические полости, тем самым сжимают уплотнительные ман�</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2014</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNy8EKgkAQxnEvHaJ6h3kAg1Kis-yOObDuyO6sHkViO0UJduzhS-kBOn3w8f-tk3eHxoBi26LzxBZqlIp1CmSVCZrsBUrDrFHDXPoUSnbADbpC5rwjqUA6hsaxDmr5vLiv81BYDRpbUrggEg9UNwZrtLLobbK6Dfcp7n67SaBEUdU-js8-TuNwjY_46l3ITlmenQ_qmP-RfAA0VTsQ</recordid><startdate>20140720</startdate><enddate>20140720</enddate><creator>FILIPPOV ANDREJ GENNAD'EVICH</creator><creator>DIKAMOV DMITRIJ VLADIMIROVICH</creator><creator>SHULJATIKOV IGOR' VLADIMIROVICH</creator><creator>DONCHENKO MIKHAIL ALEKSANDROVICH</creator><creator>JAREMENKO MIKHAIL VITAL'EVICH</creator><creator>MINLIKAEV VALERIJ ZIRJAKOVICH</creator><scope>EVB</scope></search><sort><creationdate>20140720</creationdate><title>WELL CONVERSION METHOD, INCLUDING FLOODED WELLS, FOR OPERATION WITH TWO PRODUCTION STRINGS AND DEVICE FOR ITS IMPLEMENTATION</title><author>FILIPPOV ANDREJ GENNAD'EVICH ; DIKAMOV DMITRIJ VLADIMIROVICH ; SHULJATIKOV IGOR' VLADIMIROVICH ; DONCHENKO MIKHAIL ALEKSANDROVICH ; JAREMENKO MIKHAIL VITAL'EVICH ; MINLIKAEV VALERIJ ZIRJAKOVICH</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2523270C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2014</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>FILIPPOV ANDREJ GENNAD'EVICH</creatorcontrib><creatorcontrib>DIKAMOV DMITRIJ VLADIMIROVICH</creatorcontrib><creatorcontrib>SHULJATIKOV IGOR' VLADIMIROVICH</creatorcontrib><creatorcontrib>DONCHENKO MIKHAIL ALEKSANDROVICH</creatorcontrib><creatorcontrib>JAREMENKO MIKHAIL VITAL'EVICH</creatorcontrib><creatorcontrib>MINLIKAEV VALERIJ ZIRJAKOVICH</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FILIPPOV ANDREJ GENNAD'EVICH</au><au>DIKAMOV DMITRIJ VLADIMIROVICH</au><au>SHULJATIKOV IGOR' VLADIMIROVICH</au><au>DONCHENKO MIKHAIL ALEKSANDROVICH</au><au>JAREMENKO MIKHAIL VITAL'EVICH</au><au>MINLIKAEV VALERIJ ZIRJAKOVICH</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>WELL CONVERSION METHOD, INCLUDING FLOODED WELLS, FOR OPERATION WITH TWO PRODUCTION STRINGS AND DEVICE FOR ITS IMPLEMENTATION</title><date>2014-07-20</date><risdate>2014</risdate><abstract>FIELD: oil and gas industry.SUBSTANCE: method running-in and suspension of the central production string, installation of the upper part of X-mas tree, refitting of the wellhead by installation of system for monitoring and control of the well operation, performance of gas-dynamics research, flow start-up of the well through two production ring and system for monitoring and control of the well operation. At the beginning and ending of the main production string the upper and lower bits are installed respectively and a plug and a pilot-operated valve in closed position is joined to the upper and lower bits. Then the central production string is mounted to the launching and lifting gear, the master valve is closed, a radial pipe holder is installed at the master valve, an a stop valve is installed over the master valve at the pipe holder, a preventer is joined to it and a double-chamber pressuriser is installed at the preventer, an injector is connected to the upper butt end of the pressuriser and a launching and lifting mechanism is installed in direct vicinity from the well. Thereafter the central production string is passed by its end through the injector, which is used to move the central production string, the central production string is passed through the double-chamber pressuriser, pressure is supplied to its closing hydraulic cavities thus compressing packing seals of the upper and lower chamber of the double-chamber pressuriser and the central production string is sealed. Then it is run down up to the master valve level, the central production string is run down to the position when the upper bit with plug is at the level of the injector upper butt end, the rod is connected to the plug, pressure is delivered to the opening hydraulic cavity in the upper chamber of the pressuriser, in result the packing seal of the upper chamber of the double-chamber pressuriser is released, the central production string is run down to the position when the plug is below the packing seal of the upper chamber in the double-chamber pressuriser. Pressure is supplied to the closing hydraulic cavity of the upper chamber in the double-chamber pressuriser thus sealing the rod. Pressure is supplied to the opening hydraulic cavity of the lower chamber in the pressuriser, in result the packing seal of the lower chamber in the double-chamber pressuriser is released, the central production string is run down to the position when the plug is below the packing seal of the lower chamber in the double-chamber pressuriser, thereafter pressure is supplied to the closing hydraulic cavity of the lower chamber in the double-chamber pressuriser thus sealing the rod, then the central production string is passed through the preventer and the stop valve placed over the master valve until seating surface of the upper bit coincides with seating surface of the radial pipe holder of the central production string, the upper bit of the central production string is fixed in the radial pipe holder of the central production string by means of radial fixtures, then the plug is removed from the upper bit by the rod, the plug is lifted higher than the level of stop valve placed over the master valve, the above stop valve is closed and pressure is supplied to the opening hydraulic cavities in the double-chamber pressuriser, in result packing seals of the upper and lowers chambers in the pressuriser are released. Thereafter the rod with plug is removed, the BOP preventer is dismounted, the launching and lifting gear is dismounted, the upper part of X-mas tree is mounted to the stop valve placed over the master valve and the above stop valve is opened, the pilot-controlled valve is subject to external action thus fixing it in an open position, in result volumes of the main and the central production strings are united. Additionally invention claims device for method implementation.EFFECT: reduction of labour intensity, costs and time for works performance.2 cl, 7 dwg
Изобретение относится к нефтяной и газовой отраслям промышленности и может быть применено для перевода скважин на эксплуатацию по двум лифтовым колоннам без глушения скважины. Способ включает спуск и подвеску центральной лифтовой колонны, установку верхней части фонтанной арматуры, переоборудование устьевой обвязки путем установки в ее составе управляющего комплекса контроля и управления работой скважины, проведение газодинамических исследований, пуск скважины в шлейф по двум лифтовым колоннам через управляющий комплекс контроля и управления работой скважины. В основную лифтовую колонну скважины на ее начало и конец герметично устанавливают соответственно верхний и нижний наконечники, к верхнему и нижнему наконечникам герметично присоединяют соответственно пробку и управляемый клапан, находящийся в закрытом состоянии. Затем центральную лифтовую колонну монтируют в спускоподъемное устройство, перекрывают коренную задвижку, на коренную задвижку устанавливают радиальный трубодержатель центральной лифтовой колонны, на который устанавливают надкоренную задвижку, к ней присоединяют превентор, на превентор устанавливают двухкамерный герметизатор, к верхнему торцу герметизатора присоединяют инжектор, а в непосредственной близости от скважины устанавливают спускоподъемное устройство. После этого пропускают центральную лифтовую колонну концом через инжектор, с помощью которого в дальнейшем осуществляют перемещение центральной лифтовой колонны, которую пропускают через двухкамерный герметизатор, подают давление в его закрывающие гидравлические полости, тем самым сжимают уплотнительные ман�</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; rus |
recordid | cdi_epo_espacenet_RU2523270C1 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | WELL CONVERSION METHOD, INCLUDING FLOODED WELLS, FOR OPERATION WITH TWO PRODUCTION STRINGS AND DEVICE FOR ITS IMPLEMENTATION |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-22T13%3A41%3A56IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FILIPPOV%20ANDREJ%20GENNAD'EVICH&rft.date=2014-07-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2523270C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |