DEVELOPMENT METHOD OF DEPOSITS OF VISCOUS OILS AND BITUMENS
FIELD: oil and gas industry.SUBSTANCE: development method of deposits of viscous oils and bitumens involves construction of a production well with a horizontal mined section in a productive formation, construction of an injection well with a horizontal mined section located above the similar section...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ZARIPOV AZAT TIMER'JANOVICH KHISAMOV RAIS SALIKHOVICH IDIJATULLINA ZARINA SALAVATOVNA IBATULLIN RAVIL' RUSTAMOVICH ARZAMASTSEV ALEKSANDR IVANOVICH |
description | FIELD: oil and gas industry.SUBSTANCE: development method of deposits of viscous oils and bitumens involves construction of a production well with a horizontal mined section in a productive formation, construction of an injection well with a horizontal mined section located above the similar section of the production well in the same formation at the distance of at least 4 metres, pumping of heat carrier to the injection well and extraction of the formation product from the production well, performance of temperature control of the extracted product of the well and flow rate control of the production well when at every reduction of flow rate or when temperature of the formation product of up to 90% of temperature of heat carrier breakthrough from the injection well to the production well is achieved there performed is insulation in equal section subsequently from the injection well mine face; after that, operation of wells is performed in a customary mode. Besides, the horizontal section of the injection well is built towards the horizontal section of the production well; the injection well is divided into sections with a pitch of 20-50 m; series heat carrier pumping is performed to each section, starting from the mine face with their further insulation with preservation of the distance excluding heat carrier breakthrough to the previous section. After heat carrier is pumped to the last section of the injection well, injection of heat carrier is performed throughout the length of the injection well in the volume approximately equal to total pumping volume to all the sections. The horizontal section of the production well is located at the level of at least 2 metres above oil-water contact.EFFECT: improving displacement efficiency of viscous oils and bitumens, including by increasing the coverage of the formation with an action agent, additional production of viscous oils and bitumens due to subsequent treatment of the whole formation with simultaneous reduction of costs and simplification of construction of horizontal wells.2 cl, 3 dwg
Предложение относится к нефтяной промышленности. Технический результат - увеличение эффективности вытеснения вязких нефтей и битумов, в том числе путем увеличения охвата пласта агентом воздействия, получение дополнительной добычи вязких нефтей и битумов за счет последовательной отработки всего пласта с одновременным снижением затрат и упрощением строительства горизонтальных скважин. Способ разработки залежей вязких нефтей и |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2509880C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2509880C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2509880C13</originalsourceid><addsrcrecordid>eNrjZLB2cQ1z9fEP8HX1C1HwdQ3x8HdR8HdTcHEN8A_2DAkGscM8g539Q4FMT59gBUc_FwUnz5BQoPpgHgbWtMSc4lReKM3NoODmGuLsoZtakB-fWlyQmJyal1oSHxRqZGpgaWFh4GxoTIQSAJxfKSg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>DEVELOPMENT METHOD OF DEPOSITS OF VISCOUS OILS AND BITUMENS</title><source>esp@cenet</source><creator>ZARIPOV AZAT TIMER'JANOVICH ; KHISAMOV RAIS SALIKHOVICH ; IDIJATULLINA ZARINA SALAVATOVNA ; IBATULLIN RAVIL' RUSTAMOVICH ; ARZAMASTSEV ALEKSANDR IVANOVICH</creator><creatorcontrib>ZARIPOV AZAT TIMER'JANOVICH ; KHISAMOV RAIS SALIKHOVICH ; IDIJATULLINA ZARINA SALAVATOVNA ; IBATULLIN RAVIL' RUSTAMOVICH ; ARZAMASTSEV ALEKSANDR IVANOVICH</creatorcontrib><description>FIELD: oil and gas industry.SUBSTANCE: development method of deposits of viscous oils and bitumens involves construction of a production well with a horizontal mined section in a productive formation, construction of an injection well with a horizontal mined section located above the similar section of the production well in the same formation at the distance of at least 4 metres, pumping of heat carrier to the injection well and extraction of the formation product from the production well, performance of temperature control of the extracted product of the well and flow rate control of the production well when at every reduction of flow rate or when temperature of the formation product of up to 90% of temperature of heat carrier breakthrough from the injection well to the production well is achieved there performed is insulation in equal section subsequently from the injection well mine face; after that, operation of wells is performed in a customary mode. Besides, the horizontal section of the injection well is built towards the horizontal section of the production well; the injection well is divided into sections with a pitch of 20-50 m; series heat carrier pumping is performed to each section, starting from the mine face with their further insulation with preservation of the distance excluding heat carrier breakthrough to the previous section. After heat carrier is pumped to the last section of the injection well, injection of heat carrier is performed throughout the length of the injection well in the volume approximately equal to total pumping volume to all the sections. The horizontal section of the production well is located at the level of at least 2 metres above oil-water contact.EFFECT: improving displacement efficiency of viscous oils and bitumens, including by increasing the coverage of the formation with an action agent, additional production of viscous oils and bitumens due to subsequent treatment of the whole formation with simultaneous reduction of costs and simplification of construction of horizontal wells.2 cl, 3 dwg
Предложение относится к нефтяной промышленности. Технический результат - увеличение эффективности вытеснения вязких нефтей и битумов, в том числе путем увеличения охвата пласта агентом воздействия, получение дополнительной добычи вязких нефтей и битумов за счет последовательной отработки всего пласта с одновременным снижением затрат и упрощением строительства горизонтальных скважин. Способ разработки залежей вязких нефтей и битумов включает строительство добывающей скважины с горизонтальным вскрытым участком в продуктивном пласте, строительство нагнетательной скважины с горизонтальным вскрытым участком, расположенным над аналогичным участком добывающей скважины в этом же пласте на расстоянии не менее 4 м, закачку теплоносителя в нагнетательную скважину и отбор продукции пласта из добывающей скважины, проведение контроля по температуре добываемой продукции скважины и ее дебиту из добывающей скважины, когда при каждом снижении дебита или при достижении температуры продукции пласта до 90% от температуры прорыва теплоносителя из нагнетательной скважины в добывающую производят изоляцию равными участками последовательно от забоя нагнетательной скважины, после чего проводят работу скважин в обычном режиме. Причем горизонтальный участок нагнетательной скважины строят навстречу горизонтальному участку добывающей скважины, нагнетательную скважину разбивают на участки с шагом 20-50 м, закачку теплоносителя производят в каждый участок последовательно, начиная от забоя с последующей их изоляцией с выдерживанием расстояния, исключающего прорыв теплоносителя в предыдущий участок. После закачки тепл�</description><language>eng ; rus</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2014</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20140320&DB=EPODOC&CC=RU&NR=2509880C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20140320&DB=EPODOC&CC=RU&NR=2509880C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ZARIPOV AZAT TIMER'JANOVICH</creatorcontrib><creatorcontrib>KHISAMOV RAIS SALIKHOVICH</creatorcontrib><creatorcontrib>IDIJATULLINA ZARINA SALAVATOVNA</creatorcontrib><creatorcontrib>IBATULLIN RAVIL' RUSTAMOVICH</creatorcontrib><creatorcontrib>ARZAMASTSEV ALEKSANDR IVANOVICH</creatorcontrib><title>DEVELOPMENT METHOD OF DEPOSITS OF VISCOUS OILS AND BITUMENS</title><description>FIELD: oil and gas industry.SUBSTANCE: development method of deposits of viscous oils and bitumens involves construction of a production well with a horizontal mined section in a productive formation, construction of an injection well with a horizontal mined section located above the similar section of the production well in the same formation at the distance of at least 4 metres, pumping of heat carrier to the injection well and extraction of the formation product from the production well, performance of temperature control of the extracted product of the well and flow rate control of the production well when at every reduction of flow rate or when temperature of the formation product of up to 90% of temperature of heat carrier breakthrough from the injection well to the production well is achieved there performed is insulation in equal section subsequently from the injection well mine face; after that, operation of wells is performed in a customary mode. Besides, the horizontal section of the injection well is built towards the horizontal section of the production well; the injection well is divided into sections with a pitch of 20-50 m; series heat carrier pumping is performed to each section, starting from the mine face with their further insulation with preservation of the distance excluding heat carrier breakthrough to the previous section. After heat carrier is pumped to the last section of the injection well, injection of heat carrier is performed throughout the length of the injection well in the volume approximately equal to total pumping volume to all the sections. The horizontal section of the production well is located at the level of at least 2 metres above oil-water contact.EFFECT: improving displacement efficiency of viscous oils and bitumens, including by increasing the coverage of the formation with an action agent, additional production of viscous oils and bitumens due to subsequent treatment of the whole formation with simultaneous reduction of costs and simplification of construction of horizontal wells.2 cl, 3 dwg
Предложение относится к нефтяной промышленности. Технический результат - увеличение эффективности вытеснения вязких нефтей и битумов, в том числе путем увеличения охвата пласта агентом воздействия, получение дополнительной добычи вязких нефтей и битумов за счет последовательной отработки всего пласта с одновременным снижением затрат и упрощением строительства горизонтальных скважин. Способ разработки залежей вязких нефтей и битумов включает строительство добывающей скважины с горизонтальным вскрытым участком в продуктивном пласте, строительство нагнетательной скважины с горизонтальным вскрытым участком, расположенным над аналогичным участком добывающей скважины в этом же пласте на расстоянии не менее 4 м, закачку теплоносителя в нагнетательную скважину и отбор продукции пласта из добывающей скважины, проведение контроля по температуре добываемой продукции скважины и ее дебиту из добывающей скважины, когда при каждом снижении дебита или при достижении температуры продукции пласта до 90% от температуры прорыва теплоносителя из нагнетательной скважины в добывающую производят изоляцию равными участками последовательно от забоя нагнетательной скважины, после чего проводят работу скважин в обычном режиме. Причем горизонтальный участок нагнетательной скважины строят навстречу горизонтальному участку добывающей скважины, нагнетательную скважину разбивают на участки с шагом 20-50 м, закачку теплоносителя производят в каждый участок последовательно, начиная от забоя с последующей их изоляцией с выдерживанием расстояния, исключающего прорыв теплоносителя в предыдущий участок. После закачки тепл�</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2014</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB2cQ1z9fEP8HX1C1HwdQ3x8HdR8HdTcHEN8A_2DAkGscM8g539Q4FMT59gBUc_FwUnz5BQoPpgHgbWtMSc4lReKM3NoODmGuLsoZtakB-fWlyQmJyal1oSHxRqZGpgaWFh4GxoTIQSAJxfKSg</recordid><startdate>20140320</startdate><enddate>20140320</enddate><creator>ZARIPOV AZAT TIMER'JANOVICH</creator><creator>KHISAMOV RAIS SALIKHOVICH</creator><creator>IDIJATULLINA ZARINA SALAVATOVNA</creator><creator>IBATULLIN RAVIL' RUSTAMOVICH</creator><creator>ARZAMASTSEV ALEKSANDR IVANOVICH</creator><scope>EVB</scope></search><sort><creationdate>20140320</creationdate><title>DEVELOPMENT METHOD OF DEPOSITS OF VISCOUS OILS AND BITUMENS</title><author>ZARIPOV AZAT TIMER'JANOVICH ; KHISAMOV RAIS SALIKHOVICH ; IDIJATULLINA ZARINA SALAVATOVNA ; IBATULLIN RAVIL' RUSTAMOVICH ; ARZAMASTSEV ALEKSANDR IVANOVICH</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2509880C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2014</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>ZARIPOV AZAT TIMER'JANOVICH</creatorcontrib><creatorcontrib>KHISAMOV RAIS SALIKHOVICH</creatorcontrib><creatorcontrib>IDIJATULLINA ZARINA SALAVATOVNA</creatorcontrib><creatorcontrib>IBATULLIN RAVIL' RUSTAMOVICH</creatorcontrib><creatorcontrib>ARZAMASTSEV ALEKSANDR IVANOVICH</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ZARIPOV AZAT TIMER'JANOVICH</au><au>KHISAMOV RAIS SALIKHOVICH</au><au>IDIJATULLINA ZARINA SALAVATOVNA</au><au>IBATULLIN RAVIL' RUSTAMOVICH</au><au>ARZAMASTSEV ALEKSANDR IVANOVICH</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>DEVELOPMENT METHOD OF DEPOSITS OF VISCOUS OILS AND BITUMENS</title><date>2014-03-20</date><risdate>2014</risdate><abstract>FIELD: oil and gas industry.SUBSTANCE: development method of deposits of viscous oils and bitumens involves construction of a production well with a horizontal mined section in a productive formation, construction of an injection well with a horizontal mined section located above the similar section of the production well in the same formation at the distance of at least 4 metres, pumping of heat carrier to the injection well and extraction of the formation product from the production well, performance of temperature control of the extracted product of the well and flow rate control of the production well when at every reduction of flow rate or when temperature of the formation product of up to 90% of temperature of heat carrier breakthrough from the injection well to the production well is achieved there performed is insulation in equal section subsequently from the injection well mine face; after that, operation of wells is performed in a customary mode. Besides, the horizontal section of the injection well is built towards the horizontal section of the production well; the injection well is divided into sections with a pitch of 20-50 m; series heat carrier pumping is performed to each section, starting from the mine face with their further insulation with preservation of the distance excluding heat carrier breakthrough to the previous section. After heat carrier is pumped to the last section of the injection well, injection of heat carrier is performed throughout the length of the injection well in the volume approximately equal to total pumping volume to all the sections. The horizontal section of the production well is located at the level of at least 2 metres above oil-water contact.EFFECT: improving displacement efficiency of viscous oils and bitumens, including by increasing the coverage of the formation with an action agent, additional production of viscous oils and bitumens due to subsequent treatment of the whole formation with simultaneous reduction of costs and simplification of construction of horizontal wells.2 cl, 3 dwg
Предложение относится к нефтяной промышленности. Технический результат - увеличение эффективности вытеснения вязких нефтей и битумов, в том числе путем увеличения охвата пласта агентом воздействия, получение дополнительной добычи вязких нефтей и битумов за счет последовательной отработки всего пласта с одновременным снижением затрат и упрощением строительства горизонтальных скважин. Способ разработки залежей вязких нефтей и битумов включает строительство добывающей скважины с горизонтальным вскрытым участком в продуктивном пласте, строительство нагнетательной скважины с горизонтальным вскрытым участком, расположенным над аналогичным участком добывающей скважины в этом же пласте на расстоянии не менее 4 м, закачку теплоносителя в нагнетательную скважину и отбор продукции пласта из добывающей скважины, проведение контроля по температуре добываемой продукции скважины и ее дебиту из добывающей скважины, когда при каждом снижении дебита или при достижении температуры продукции пласта до 90% от температуры прорыва теплоносителя из нагнетательной скважины в добывающую производят изоляцию равными участками последовательно от забоя нагнетательной скважины, после чего проводят работу скважин в обычном режиме. Причем горизонтальный участок нагнетательной скважины строят навстречу горизонтальному участку добывающей скважины, нагнетательную скважину разбивают на участки с шагом 20-50 м, закачку теплоносителя производят в каждый участок последовательно, начиная от забоя с последующей их изоляцией с выдерживанием расстояния, исключающего прорыв теплоносителя в предыдущий участок. После закачки тепл�</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; rus |
recordid | cdi_epo_espacenet_RU2509880C1 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | DEVELOPMENT METHOD OF DEPOSITS OF VISCOUS OILS AND BITUMENS |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T08%3A16%3A25IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ZARIPOV%20AZAT%20TIMER'JANOVICH&rft.date=2014-03-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2509880C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |