METHOD FOR DETERMINING FILTRATION PARAMETERS OF FORMATION
FIELD: oil and gas industry.SUBSTANCE: method involves the following sequence of actions: after continuous well operation cycle during at least 30 days, a long-term (at least 3 days) level recovery curve is recorded, as per which current productivity of formations is evaluated; then, on the basis of...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!