OIL DEPOSIT DEVELOPMENT METHOD
FIELD: oil and gas industry. ^ SUBSTANCE: according to the method the following is performed: working agent is pumped through rows of injection wells, product is extracted through rows of production wells, production wells pattern is sealed, watered production wells are changed to injection wells. S...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | MIRONOVA LJUBOV' MIKHAJLOVNA EVDOKIMOV ALEKSANDR MIKHAJLOVICH KHISAMOV RAIS SALIKHOVICH GALIMOV IL'JA FANUZOVICH RAMAZANOV RASHIT GAZNAVIEVICH |
description | FIELD: oil and gas industry. ^ SUBSTANCE: according to the method the following is performed: working agent is pumped through rows of injection wells, product is extracted through rows of production wells, production wells pattern is sealed, watered production wells are changed to injection wells. Sealing is performed starting from the second row of production wells in relation to row of injection wells. During sealing branch vertical and/or horizontal bores are drilled from production wells of the second row. At that bottom holes of new bores are arranged in productive formation between first and second rows of production wells equally spaced from bottom holes of adjacent wells. If productive formation thickness is above 1.5 m, branch horizontal bore is drilled as branch bore with length of horizontal part in productive formation not less than 30 m. If productive formation thickness is below 1.5 m, branch bore is drilled with vertical part in productive formation as branch bore. As watering out advances, simultaneous separate well operation with branch bores is started. At that as watering-out advances, watered branch bores are deactivated or changed to injection, or this is performed to wells depending on priority of watering out. As watering out of the second row of production wells advances, sealing and operation of wells is performed starting from the third row analogous to activities starting from the second row. Sealing of central row of production wells is performed towards both rows of injection wells. ^ EFFECT: increasing oil recovery of deposit and reducing the costs of wells pattern sealing. ^ 1 ex, 1 dwg
Изобретение относится к области нефтяной промышленности и может найти применение при разработке нефтяной залежи. Обеспечивает повышение нефтеотдачи залежи и снижение затрат на уплотнение сетки скважин. Сущность изобретения: по способу ведут закачку рабочего агента через ряды нагнетательных скважин, отбор продукции через ряды добывающих скважин, уплотнение сетки добывающих скважин и перевод обводнившихся добывающих скважин в нагнетательные. Уплотнение выполняют со второго от ряда нагнетательных скважин ряда добывающих скважин. При уплотнении из добывающих скважин второго ряда бурят боковые вертикальные и/или горизонтальные стволы с размещением забоев новых стволов в продуктивном пласте между первым и вторым рядами добывающих скважин равноудаленно от забоев соседних скважин. При толщине продуктивного пласта более 1,5 м в качестве бокового ствола |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2451166C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2451166C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2451166C13</originalsourceid><addsrcrecordid>eNrjZJDz9_RRcHEN8A_2DAHSYa4-_gG-rn4hCr6uIR7-LjwMrGmJOcWpvFCam0HBzTXE2UM3tSA_PrW4IDE5NS-1JD4o1MjE1NDQzMzZ0JgIJQB83SEn</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>OIL DEPOSIT DEVELOPMENT METHOD</title><source>esp@cenet</source><creator>MIRONOVA LJUBOV' MIKHAJLOVNA ; EVDOKIMOV ALEKSANDR MIKHAJLOVICH ; KHISAMOV RAIS SALIKHOVICH ; GALIMOV IL'JA FANUZOVICH ; RAMAZANOV RASHIT GAZNAVIEVICH</creator><creatorcontrib>MIRONOVA LJUBOV' MIKHAJLOVNA ; EVDOKIMOV ALEKSANDR MIKHAJLOVICH ; KHISAMOV RAIS SALIKHOVICH ; GALIMOV IL'JA FANUZOVICH ; RAMAZANOV RASHIT GAZNAVIEVICH</creatorcontrib><description>FIELD: oil and gas industry. ^ SUBSTANCE: according to the method the following is performed: working agent is pumped through rows of injection wells, product is extracted through rows of production wells, production wells pattern is sealed, watered production wells are changed to injection wells. Sealing is performed starting from the second row of production wells in relation to row of injection wells. During sealing branch vertical and/or horizontal bores are drilled from production wells of the second row. At that bottom holes of new bores are arranged in productive formation between first and second rows of production wells equally spaced from bottom holes of adjacent wells. If productive formation thickness is above 1.5 m, branch horizontal bore is drilled as branch bore with length of horizontal part in productive formation not less than 30 m. If productive formation thickness is below 1.5 m, branch bore is drilled with vertical part in productive formation as branch bore. As watering out advances, simultaneous separate well operation with branch bores is started. At that as watering-out advances, watered branch bores are deactivated or changed to injection, or this is performed to wells depending on priority of watering out. As watering out of the second row of production wells advances, sealing and operation of wells is performed starting from the third row analogous to activities starting from the second row. Sealing of central row of production wells is performed towards both rows of injection wells. ^ EFFECT: increasing oil recovery of deposit and reducing the costs of wells pattern sealing. ^ 1 ex, 1 dwg
Изобретение относится к области нефтяной промышленности и может найти применение при разработке нефтяной залежи. Обеспечивает повышение нефтеотдачи залежи и снижение затрат на уплотнение сетки скважин. Сущность изобретения: по способу ведут закачку рабочего агента через ряды нагнетательных скважин, отбор продукции через ряды добывающих скважин, уплотнение сетки добывающих скважин и перевод обводнившихся добывающих скважин в нагнетательные. Уплотнение выполняют со второго от ряда нагнетательных скважин ряда добывающих скважин. При уплотнении из добывающих скважин второго ряда бурят боковые вертикальные и/или горизонтальные стволы с размещением забоев новых стволов в продуктивном пласте между первым и вторым рядами добывающих скважин равноудаленно от забоев соседних скважин. При толщине продуктивного пласта более 1,5 м в качестве бокового ствола бурят боковой горизонтальный ствол с длиной горизонтальной части в продуктивном пласте не менее 30 м. При толщине продуктивного пласта менее 1,5 м в качестве бокового ствола бурят боковой ствол с вертикальной частью в продуктивном пласте. По мере обводнения переходят к одновременно-раздельной эксплуатации скважин с боковыми стволами, причем по мере обводнения отключают или переводят под нагнетание обводнившиеся боковые стволы или сами скважины в зависимости от очередности обводнения. По мере обводнения второго ряда добывающих скважин уплотнение и эксплуатацию скважин проводят с третьего ряда аналогично работам со второго ряда. Уплотнение центрального ряда добывающих скважин проводят в направлении обоих рядов нагнетательных скважин. 1 пр., 1 ил.</description><language>eng ; rus</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120520&DB=EPODOC&CC=RU&NR=2451166C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20120520&DB=EPODOC&CC=RU&NR=2451166C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MIRONOVA LJUBOV' MIKHAJLOVNA</creatorcontrib><creatorcontrib>EVDOKIMOV ALEKSANDR MIKHAJLOVICH</creatorcontrib><creatorcontrib>KHISAMOV RAIS SALIKHOVICH</creatorcontrib><creatorcontrib>GALIMOV IL'JA FANUZOVICH</creatorcontrib><creatorcontrib>RAMAZANOV RASHIT GAZNAVIEVICH</creatorcontrib><title>OIL DEPOSIT DEVELOPMENT METHOD</title><description>FIELD: oil and gas industry. ^ SUBSTANCE: according to the method the following is performed: working agent is pumped through rows of injection wells, product is extracted through rows of production wells, production wells pattern is sealed, watered production wells are changed to injection wells. Sealing is performed starting from the second row of production wells in relation to row of injection wells. During sealing branch vertical and/or horizontal bores are drilled from production wells of the second row. At that bottom holes of new bores are arranged in productive formation between first and second rows of production wells equally spaced from bottom holes of adjacent wells. If productive formation thickness is above 1.5 m, branch horizontal bore is drilled as branch bore with length of horizontal part in productive formation not less than 30 m. If productive formation thickness is below 1.5 m, branch bore is drilled with vertical part in productive formation as branch bore. As watering out advances, simultaneous separate well operation with branch bores is started. At that as watering-out advances, watered branch bores are deactivated or changed to injection, or this is performed to wells depending on priority of watering out. As watering out of the second row of production wells advances, sealing and operation of wells is performed starting from the third row analogous to activities starting from the second row. Sealing of central row of production wells is performed towards both rows of injection wells. ^ EFFECT: increasing oil recovery of deposit and reducing the costs of wells pattern sealing. ^ 1 ex, 1 dwg
Изобретение относится к области нефтяной промышленности и может найти применение при разработке нефтяной залежи. Обеспечивает повышение нефтеотдачи залежи и снижение затрат на уплотнение сетки скважин. Сущность изобретения: по способу ведут закачку рабочего агента через ряды нагнетательных скважин, отбор продукции через ряды добывающих скважин, уплотнение сетки добывающих скважин и перевод обводнившихся добывающих скважин в нагнетательные. Уплотнение выполняют со второго от ряда нагнетательных скважин ряда добывающих скважин. При уплотнении из добывающих скважин второго ряда бурят боковые вертикальные и/или горизонтальные стволы с размещением забоев новых стволов в продуктивном пласте между первым и вторым рядами добывающих скважин равноудаленно от забоев соседних скважин. При толщине продуктивного пласта более 1,5 м в качестве бокового ствола бурят боковой горизонтальный ствол с длиной горизонтальной части в продуктивном пласте не менее 30 м. При толщине продуктивного пласта менее 1,5 м в качестве бокового ствола бурят боковой ствол с вертикальной частью в продуктивном пласте. По мере обводнения переходят к одновременно-раздельной эксплуатации скважин с боковыми стволами, причем по мере обводнения отключают или переводят под нагнетание обводнившиеся боковые стволы или сами скважины в зависимости от очередности обводнения. По мере обводнения второго ряда добывающих скважин уплотнение и эксплуатацию скважин проводят с третьего ряда аналогично работам со второго ряда. Уплотнение центрального ряда добывающих скважин проводят в направлении обоих рядов нагнетательных скважин. 1 пр., 1 ил.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJDz9_RRcHEN8A_2DAHSYa4-_gG-rn4hCr6uIR7-LjwMrGmJOcWpvFCam0HBzTXE2UM3tSA_PrW4IDE5NS-1JD4o1MjE1NDQzMzZ0JgIJQB83SEn</recordid><startdate>20120520</startdate><enddate>20120520</enddate><creator>MIRONOVA LJUBOV' MIKHAJLOVNA</creator><creator>EVDOKIMOV ALEKSANDR MIKHAJLOVICH</creator><creator>KHISAMOV RAIS SALIKHOVICH</creator><creator>GALIMOV IL'JA FANUZOVICH</creator><creator>RAMAZANOV RASHIT GAZNAVIEVICH</creator><scope>EVB</scope></search><sort><creationdate>20120520</creationdate><title>OIL DEPOSIT DEVELOPMENT METHOD</title><author>MIRONOVA LJUBOV' MIKHAJLOVNA ; EVDOKIMOV ALEKSANDR MIKHAJLOVICH ; KHISAMOV RAIS SALIKHOVICH ; GALIMOV IL'JA FANUZOVICH ; RAMAZANOV RASHIT GAZNAVIEVICH</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2451166C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2012</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>MIRONOVA LJUBOV' MIKHAJLOVNA</creatorcontrib><creatorcontrib>EVDOKIMOV ALEKSANDR MIKHAJLOVICH</creatorcontrib><creatorcontrib>KHISAMOV RAIS SALIKHOVICH</creatorcontrib><creatorcontrib>GALIMOV IL'JA FANUZOVICH</creatorcontrib><creatorcontrib>RAMAZANOV RASHIT GAZNAVIEVICH</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MIRONOVA LJUBOV' MIKHAJLOVNA</au><au>EVDOKIMOV ALEKSANDR MIKHAJLOVICH</au><au>KHISAMOV RAIS SALIKHOVICH</au><au>GALIMOV IL'JA FANUZOVICH</au><au>RAMAZANOV RASHIT GAZNAVIEVICH</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>OIL DEPOSIT DEVELOPMENT METHOD</title><date>2012-05-20</date><risdate>2012</risdate><abstract>FIELD: oil and gas industry. ^ SUBSTANCE: according to the method the following is performed: working agent is pumped through rows of injection wells, product is extracted through rows of production wells, production wells pattern is sealed, watered production wells are changed to injection wells. Sealing is performed starting from the second row of production wells in relation to row of injection wells. During sealing branch vertical and/or horizontal bores are drilled from production wells of the second row. At that bottom holes of new bores are arranged in productive formation between first and second rows of production wells equally spaced from bottom holes of adjacent wells. If productive formation thickness is above 1.5 m, branch horizontal bore is drilled as branch bore with length of horizontal part in productive formation not less than 30 m. If productive formation thickness is below 1.5 m, branch bore is drilled with vertical part in productive formation as branch bore. As watering out advances, simultaneous separate well operation with branch bores is started. At that as watering-out advances, watered branch bores are deactivated or changed to injection, or this is performed to wells depending on priority of watering out. As watering out of the second row of production wells advances, sealing and operation of wells is performed starting from the third row analogous to activities starting from the second row. Sealing of central row of production wells is performed towards both rows of injection wells. ^ EFFECT: increasing oil recovery of deposit and reducing the costs of wells pattern sealing. ^ 1 ex, 1 dwg
Изобретение относится к области нефтяной промышленности и может найти применение при разработке нефтяной залежи. Обеспечивает повышение нефтеотдачи залежи и снижение затрат на уплотнение сетки скважин. Сущность изобретения: по способу ведут закачку рабочего агента через ряды нагнетательных скважин, отбор продукции через ряды добывающих скважин, уплотнение сетки добывающих скважин и перевод обводнившихся добывающих скважин в нагнетательные. Уплотнение выполняют со второго от ряда нагнетательных скважин ряда добывающих скважин. При уплотнении из добывающих скважин второго ряда бурят боковые вертикальные и/или горизонтальные стволы с размещением забоев новых стволов в продуктивном пласте между первым и вторым рядами добывающих скважин равноудаленно от забоев соседних скважин. При толщине продуктивного пласта более 1,5 м в качестве бокового ствола бурят боковой горизонтальный ствол с длиной горизонтальной части в продуктивном пласте не менее 30 м. При толщине продуктивного пласта менее 1,5 м в качестве бокового ствола бурят боковой ствол с вертикальной частью в продуктивном пласте. По мере обводнения переходят к одновременно-раздельной эксплуатации скважин с боковыми стволами, причем по мере обводнения отключают или переводят под нагнетание обводнившиеся боковые стволы или сами скважины в зависимости от очередности обводнения. По мере обводнения второго ряда добывающих скважин уплотнение и эксплуатацию скважин проводят с третьего ряда аналогично работам со второго ряда. Уплотнение центрального ряда добывающих скважин проводят в направлении обоих рядов нагнетательных скважин. 1 пр., 1 ил.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; rus |
recordid | cdi_epo_espacenet_RU2451166C1 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS |
title | OIL DEPOSIT DEVELOPMENT METHOD |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-20T18%3A33%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MIRONOVA%20LJUBOV'%20MIKHAJLOVNA&rft.date=2012-05-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2451166C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |