PROCEDURE FOR LAYOUT OF BLAST HOLES PLACEMENT IN CURVILINEAR TUNNELS; DRILL RIG AND SOFT WARE
FIELD: oil and gas production. ^ SUBSTANCE: axial line of driven tunnel is determined with, for example, curve fitting. Data on location of drill platform on axial line of the tunnel are transmitted to the control panel; navigation plane of the blast holes placement layout is arranged on axial line...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng ; rus |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | SALENIEMI TOMMI |
description | FIELD: oil and gas production. ^ SUBSTANCE: axial line of driven tunnel is determined with, for example, curve fitting. Data on location of drill platform on axial line of the tunnel are transmitted to the control panel; navigation plane of the blast holes placement layout is arranged on axial line of the tunnel. The initial point of set of the blast holes is positioned on the axial line of the tunnel considering length (L) of the blast holes set. Additionally, the final point of the blast holes set is arranged at distance corresponding to length of blast holes set from the initial point; the coordinate system of blast holes placement layout is directed to facilitate one of its axes running from the initial point to the final point. Finally, various systems of coordinates are utilised. ^ EFFECT: new and improved procedure for directing layout of blast holes placement in curvilinear tunnel, also development of soft ware for implementation of procedure and drill rig. ^ 19 cl, 8 dwg
Изобретение относится к способу определения направления схемы размещения шпуров в расчете кривой туннеля, подлежащем исполнению в блоке управления буровой установки. Изобретение дополнительно относится к программному продукту и буровой установке. Техническим результатом является создание нового и усовершенствованного способа направления схемы размещения шпуров в криволинейном туннеле, программного продукта для реализации способа и буровой установки. Для этого осевую линию проходимого туннеля определяют, например, с использованием проведения кривой по точкам. Данные местоположения площадки бурения на осевой линии туннеля сообщают в блок управления и навигационную плоскость схемы размещения шпуров располагают на осевой линии туннеля. Начальную точку комплекта шпуров располагают на осевой линии туннеля и предусматривают длину (L) комплекта шпуров. Дополнительно, конечную точку комплекта шпуров располагают на расстоянии, соответствующем длине комплекта шпуров от начальной точки, и систему координат схемы размещения шпуров направляют так, чтобы одна из ее осей была направлена из начальной точки в конечную точку. В конечном итоге преобразуют различные системы координат. 4 н. и 15 з.п. ф-лы, 8 ил. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2416027C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2416027C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2416027C13</originalsourceid><addsrcrecordid>eNqNyjEKwjAUBuAuDqLe4b-AYKvo4BTTFxt4JuUlURykFImTaKHeHxcP4PQt37S4teI11UkIxgtYXX2K8AYHViGi8UwBLStNJ3IR1kEnOVu2jpQgJueIwx61WGaIPUK5GsGbiIsSmheTR_8c8-LnrIChqJtlHt5dHof-nl_500mqNuV2Ve10uf6jfAF5WzIj</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PROCEDURE FOR LAYOUT OF BLAST HOLES PLACEMENT IN CURVILINEAR TUNNELS; DRILL RIG AND SOFT WARE</title><source>esp@cenet</source><creator>SALENIEMI TOMMI</creator><creatorcontrib>SALENIEMI TOMMI</creatorcontrib><description>FIELD: oil and gas production. ^ SUBSTANCE: axial line of driven tunnel is determined with, for example, curve fitting. Data on location of drill platform on axial line of the tunnel are transmitted to the control panel; navigation plane of the blast holes placement layout is arranged on axial line of the tunnel. The initial point of set of the blast holes is positioned on the axial line of the tunnel considering length (L) of the blast holes set. Additionally, the final point of the blast holes set is arranged at distance corresponding to length of blast holes set from the initial point; the coordinate system of blast holes placement layout is directed to facilitate one of its axes running from the initial point to the final point. Finally, various systems of coordinates are utilised. ^ EFFECT: new and improved procedure for directing layout of blast holes placement in curvilinear tunnel, also development of soft ware for implementation of procedure and drill rig. ^ 19 cl, 8 dwg
Изобретение относится к способу определения направления схемы размещения шпуров в расчете кривой туннеля, подлежащем исполнению в блоке управления буровой установки. Изобретение дополнительно относится к программному продукту и буровой установке. Техническим результатом является создание нового и усовершенствованного способа направления схемы размещения шпуров в криволинейном туннеле, программного продукта для реализации способа и буровой установки. Для этого осевую линию проходимого туннеля определяют, например, с использованием проведения кривой по точкам. Данные местоположения площадки бурения на осевой линии туннеля сообщают в блок управления и навигационную плоскость схемы размещения шпуров располагают на осевой линии туннеля. Начальную точку комплекта шпуров располагают на осевой линии туннеля и предусматривают длину (L) комплекта шпуров. Дополнительно, конечную точку комплекта шпуров располагают на расстоянии, соответствующем длине комплекта шпуров от начальной точки, и систему координат схемы размещения шпуров направляют так, чтобы одна из ее осей была направлена из начальной точки в конечную точку. В конечном итоге преобразуют различные системы координат. 4 н. и 15 з.п. ф-лы, 8 ил.</description><language>eng ; rus</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; LARGE UNDERGROUND CHAMBERS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SHAFTS ; TUNNELS</subject><creationdate>2011</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20110410&DB=EPODOC&CC=RU&NR=2416027C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25551,76302</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=20110410&DB=EPODOC&CC=RU&NR=2416027C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>SALENIEMI TOMMI</creatorcontrib><title>PROCEDURE FOR LAYOUT OF BLAST HOLES PLACEMENT IN CURVILINEAR TUNNELS; DRILL RIG AND SOFT WARE</title><description>FIELD: oil and gas production. ^ SUBSTANCE: axial line of driven tunnel is determined with, for example, curve fitting. Data on location of drill platform on axial line of the tunnel are transmitted to the control panel; navigation plane of the blast holes placement layout is arranged on axial line of the tunnel. The initial point of set of the blast holes is positioned on the axial line of the tunnel considering length (L) of the blast holes set. Additionally, the final point of the blast holes set is arranged at distance corresponding to length of blast holes set from the initial point; the coordinate system of blast holes placement layout is directed to facilitate one of its axes running from the initial point to the final point. Finally, various systems of coordinates are utilised. ^ EFFECT: new and improved procedure for directing layout of blast holes placement in curvilinear tunnel, also development of soft ware for implementation of procedure and drill rig. ^ 19 cl, 8 dwg
Изобретение относится к способу определения направления схемы размещения шпуров в расчете кривой туннеля, подлежащем исполнению в блоке управления буровой установки. Изобретение дополнительно относится к программному продукту и буровой установке. Техническим результатом является создание нового и усовершенствованного способа направления схемы размещения шпуров в криволинейном туннеле, программного продукта для реализации способа и буровой установки. Для этого осевую линию проходимого туннеля определяют, например, с использованием проведения кривой по точкам. Данные местоположения площадки бурения на осевой линии туннеля сообщают в блок управления и навигационную плоскость схемы размещения шпуров располагают на осевой линии туннеля. Начальную точку комплекта шпуров располагают на осевой линии туннеля и предусматривают длину (L) комплекта шпуров. Дополнительно, конечную точку комплекта шпуров располагают на расстоянии, соответствующем длине комплекта шпуров от начальной точки, и систему координат схемы размещения шпуров направляют так, чтобы одна из ее осей была направлена из начальной точки в конечную точку. В конечном итоге преобразуют различные системы координат. 4 н. и 15 з.п. ф-лы, 8 ил.</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2011</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwjAUBuAuDqLe4b-AYKvo4BTTFxt4JuUlURykFImTaKHeHxcP4PQt37S4teI11UkIxgtYXX2K8AYHViGi8UwBLStNJ3IR1kEnOVu2jpQgJueIwx61WGaIPUK5GsGbiIsSmheTR_8c8-LnrIChqJtlHt5dHof-nl_500mqNuV2Ve10uf6jfAF5WzIj</recordid><startdate>20110410</startdate><enddate>20110410</enddate><creator>SALENIEMI TOMMI</creator><scope>EVB</scope></search><sort><creationdate>20110410</creationdate><title>PROCEDURE FOR LAYOUT OF BLAST HOLES PLACEMENT IN CURVILINEAR TUNNELS; DRILL RIG AND SOFT WARE</title><author>SALENIEMI TOMMI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2416027C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2011</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><toplevel>online_resources</toplevel><creatorcontrib>SALENIEMI TOMMI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>SALENIEMI TOMMI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PROCEDURE FOR LAYOUT OF BLAST HOLES PLACEMENT IN CURVILINEAR TUNNELS; DRILL RIG AND SOFT WARE</title><date>2011-04-10</date><risdate>2011</risdate><abstract>FIELD: oil and gas production. ^ SUBSTANCE: axial line of driven tunnel is determined with, for example, curve fitting. Data on location of drill platform on axial line of the tunnel are transmitted to the control panel; navigation plane of the blast holes placement layout is arranged on axial line of the tunnel. The initial point of set of the blast holes is positioned on the axial line of the tunnel considering length (L) of the blast holes set. Additionally, the final point of the blast holes set is arranged at distance corresponding to length of blast holes set from the initial point; the coordinate system of blast holes placement layout is directed to facilitate one of its axes running from the initial point to the final point. Finally, various systems of coordinates are utilised. ^ EFFECT: new and improved procedure for directing layout of blast holes placement in curvilinear tunnel, also development of soft ware for implementation of procedure and drill rig. ^ 19 cl, 8 dwg
Изобретение относится к способу определения направления схемы размещения шпуров в расчете кривой туннеля, подлежащем исполнению в блоке управления буровой установки. Изобретение дополнительно относится к программному продукту и буровой установке. Техническим результатом является создание нового и усовершенствованного способа направления схемы размещения шпуров в криволинейном туннеле, программного продукта для реализации способа и буровой установки. Для этого осевую линию проходимого туннеля определяют, например, с использованием проведения кривой по точкам. Данные местоположения площадки бурения на осевой линии туннеля сообщают в блок управления и навигационную плоскость схемы размещения шпуров располагают на осевой линии туннеля. Начальную точку комплекта шпуров располагают на осевой линии туннеля и предусматривают длину (L) комплекта шпуров. Дополнительно, конечную точку комплекта шпуров располагают на расстоянии, соответствующем длине комплекта шпуров от начальной точки, и систему координат схемы размещения шпуров направляют так, чтобы одна из ее осей была направлена из начальной точки в конечную точку. В конечном итоге преобразуют различные системы координат. 4 н. и 15 з.п. ф-лы, 8 ил.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng ; rus |
recordid | cdi_epo_espacenet_RU2416027C1 |
source | esp@cenet |
subjects | EARTH DRILLING EARTH DRILLING, e.g. DEEP DRILLING FIXED CONSTRUCTIONS GALLERIES LARGE UNDERGROUND CHAMBERS MINING OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS SHAFTS TUNNELS |
title | PROCEDURE FOR LAYOUT OF BLAST HOLES PLACEMENT IN CURVILINEAR TUNNELS; DRILL RIG AND SOFT WARE |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-15T17%3A40%3A55IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=SALENIEMI%20TOMMI&rft.date=2011-04-10&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2416027C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |