MODIFICATION METHOD OF ARRANGEMENT SCHEME OF BORE PITS, DRILLING INSTALLATION AND PROGRAMME PRODUCT

FIELD: mining. ^ SUBSTANCE: modification method of arrangement scheme of bore pits in drilling installation consists of the following stages: initial location points of bore pits are displayed on display device of control unit according to arrangement scheme of bore pits, arrangement scheme of bore...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: KHAVERINEN EHMELI
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KHAVERINEN EHMELI
description FIELD: mining. ^ SUBSTANCE: modification method of arrangement scheme of bore pits in drilling installation consists of the following stages: initial location points of bore pits are displayed on display device of control unit according to arrangement scheme of bore pits, arrangement scheme of bore pits in drilling installation is modified prior to its execution and arrangement scheme of bore pits is updated as per the performed modifications. At that, there chosen is at least one bore pit in bore pit arrangement scheme and initial location point of the chosen bore pit with location of drilling block; then, drilling block is moved manually to the chosen place at the drilling site and arrangement scheme of bore pits is modified by moving the initial location point of the chosen bore pit to a new location point specified with drilling block. The proposed method is implemented by means of drilling installation containing moving transport vehicle, at least one drilling manipulator and at least one drilling block containing guide beam installed on drilling manipulator, drilling machine moved with supply device, and the tool connected to drilling machine; at least, one control unit equipped with bore pit arrangement scheme, display device of control unit to provide the display of bore pit arrangement scheme; at least, one control element for manual control of drilling block and at least one sensor for determination of location and direction of drilling block. At that, to the control unit there loaded is programme product providing the selection by the operator at least of one bore pit in arrangement scheme of bore pits and connection of initial location point of chosen bore pit with location of drilling block; modification in arrangement scheme of bore pits of initial point of the selected bore pit from initial location point to new point in response to displacement with manual control of drilling block, and update of arrangement scheme of bore pits as per the performed modifications. ^ EFFECT: group of inventions allows determining arrangement schemes of bore pits for improvement of efficiency of driving of mine workings depending on mountain conditions immediately in the place where drilling works are performed. ^ 10 cl, 7 dwg Изобретение относится к горному делу, в частности к способу разметки схемы размещения шпуров на забое выработки. Способ модификации схемы размещения шпуров в буровой установке, содержащий следующие этапы: отображают на устройстве отображ
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2415269C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2415269C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2415269C13</originalsourceid><addsrcrecordid>eNqNjMsKwjAQRbtxIeo_zAfoovUBXcYkTQbyKJPpupQSV6KF-v9Y0Q9wdQ-Xc--6GH1U2KAUjDGA12yjgtiAIBLBaK8DQ5J2gU97jaShRU57UITOYTCAIbFw7nsggoKWoiHhl8VCqpO8LVa34T7n3S83BTSapT3k6dnneRrG_MivnrrqVJ6rSy3L4x_KG6u0M_c</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>MODIFICATION METHOD OF ARRANGEMENT SCHEME OF BORE PITS, DRILLING INSTALLATION AND PROGRAMME PRODUCT</title><source>esp@cenet</source><creator>KHAVERINEN EHMELI</creator><creatorcontrib>KHAVERINEN EHMELI</creatorcontrib><description>FIELD: mining. ^ SUBSTANCE: modification method of arrangement scheme of bore pits in drilling installation consists of the following stages: initial location points of bore pits are displayed on display device of control unit according to arrangement scheme of bore pits, arrangement scheme of bore pits in drilling installation is modified prior to its execution and arrangement scheme of bore pits is updated as per the performed modifications. At that, there chosen is at least one bore pit in bore pit arrangement scheme and initial location point of the chosen bore pit with location of drilling block; then, drilling block is moved manually to the chosen place at the drilling site and arrangement scheme of bore pits is modified by moving the initial location point of the chosen bore pit to a new location point specified with drilling block. The proposed method is implemented by means of drilling installation containing moving transport vehicle, at least one drilling manipulator and at least one drilling block containing guide beam installed on drilling manipulator, drilling machine moved with supply device, and the tool connected to drilling machine; at least, one control unit equipped with bore pit arrangement scheme, display device of control unit to provide the display of bore pit arrangement scheme; at least, one control element for manual control of drilling block and at least one sensor for determination of location and direction of drilling block. At that, to the control unit there loaded is programme product providing the selection by the operator at least of one bore pit in arrangement scheme of bore pits and connection of initial location point of chosen bore pit with location of drilling block; modification in arrangement scheme of bore pits of initial point of the selected bore pit from initial location point to new point in response to displacement with manual control of drilling block, and update of arrangement scheme of bore pits as per the performed modifications. ^ EFFECT: group of inventions allows determining arrangement schemes of bore pits for improvement of efficiency of driving of mine workings depending on mountain conditions immediately in the place where drilling works are performed. ^ 10 cl, 7 dwg Изобретение относится к горному делу, в частности к способу разметки схемы размещения шпуров на забое выработки. Способ модификации схемы размещения шпуров в буровой установке, содержащий следующие этапы: отображают на устройстве отображения блока управления начальные точки заложения шпуров согласно схеме размещения шпуров, модифицируют схему размещения шпуров в буровой установке перед ее исполнением и обновляют схему размещения шпуров по выполненным модификациям. При этом выбирают, по меньшей мере, один шпур в схеме размещения шпуров и соединяют начальную точку заложения выбранного шпура с местоположением бурильного блока, затем перемещают бурильный блок вручную в выбранное местоположение на площадке бурения и модифицируют схему размещения шпуров посредством переноса начальной точки заложения выбранного шпура в новую точку заложения, указанную бурильным блоком. Предложенный способ осуществляется с помощью буровой установки, содержащей подвижное транспортное средство, по меньшей мере, один бурильный манипулятор и, по меньшей мере, один бурильный блок, содержащий направляющую балку, установленную на бурильном манипуляторе, бурильную машину, перемещаемую устройством подачи, и инструмент, соединяемый с бурильной машиной, по меньшей мере, один блок управления, снабженный схемой размещения шпуров, устройство отображения блока управления для обеспечения отображения схемы размещения шпуров, по меньшей мере, один элемент управления для ручного управления бурильным блоком и, по меньшей мере, один датчик для определения местоположения и направления бурильного блока. При этом в блок управления загруж�</description><language>eng ; rus</language><subject>AMMUNITION ; BLASTING ; EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; GALLERIES ; HEATING ; LARGE UNDERGROUND CHAMBERS ; LIGHTING ; MECHANICAL ENGINEERING ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS ; SHAFTS ; TUNNELS ; WEAPONS</subject><creationdate>2011</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20110327&amp;DB=EPODOC&amp;CC=RU&amp;NR=2415269C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20110327&amp;DB=EPODOC&amp;CC=RU&amp;NR=2415269C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KHAVERINEN EHMELI</creatorcontrib><title>MODIFICATION METHOD OF ARRANGEMENT SCHEME OF BORE PITS, DRILLING INSTALLATION AND PROGRAMME PRODUCT</title><description>FIELD: mining. ^ SUBSTANCE: modification method of arrangement scheme of bore pits in drilling installation consists of the following stages: initial location points of bore pits are displayed on display device of control unit according to arrangement scheme of bore pits, arrangement scheme of bore pits in drilling installation is modified prior to its execution and arrangement scheme of bore pits is updated as per the performed modifications. At that, there chosen is at least one bore pit in bore pit arrangement scheme and initial location point of the chosen bore pit with location of drilling block; then, drilling block is moved manually to the chosen place at the drilling site and arrangement scheme of bore pits is modified by moving the initial location point of the chosen bore pit to a new location point specified with drilling block. The proposed method is implemented by means of drilling installation containing moving transport vehicle, at least one drilling manipulator and at least one drilling block containing guide beam installed on drilling manipulator, drilling machine moved with supply device, and the tool connected to drilling machine; at least, one control unit equipped with bore pit arrangement scheme, display device of control unit to provide the display of bore pit arrangement scheme; at least, one control element for manual control of drilling block and at least one sensor for determination of location and direction of drilling block. At that, to the control unit there loaded is programme product providing the selection by the operator at least of one bore pit in arrangement scheme of bore pits and connection of initial location point of chosen bore pit with location of drilling block; modification in arrangement scheme of bore pits of initial point of the selected bore pit from initial location point to new point in response to displacement with manual control of drilling block, and update of arrangement scheme of bore pits as per the performed modifications. ^ EFFECT: group of inventions allows determining arrangement schemes of bore pits for improvement of efficiency of driving of mine workings depending on mountain conditions immediately in the place where drilling works are performed. ^ 10 cl, 7 dwg Изобретение относится к горному делу, в частности к способу разметки схемы размещения шпуров на забое выработки. Способ модификации схемы размещения шпуров в буровой установке, содержащий следующие этапы: отображают на устройстве отображения блока управления начальные точки заложения шпуров согласно схеме размещения шпуров, модифицируют схему размещения шпуров в буровой установке перед ее исполнением и обновляют схему размещения шпуров по выполненным модификациям. При этом выбирают, по меньшей мере, один шпур в схеме размещения шпуров и соединяют начальную точку заложения выбранного шпура с местоположением бурильного блока, затем перемещают бурильный блок вручную в выбранное местоположение на площадке бурения и модифицируют схему размещения шпуров посредством переноса начальной точки заложения выбранного шпура в новую точку заложения, указанную бурильным блоком. Предложенный способ осуществляется с помощью буровой установки, содержащей подвижное транспортное средство, по меньшей мере, один бурильный манипулятор и, по меньшей мере, один бурильный блок, содержащий направляющую балку, установленную на бурильном манипуляторе, бурильную машину, перемещаемую устройством подачи, и инструмент, соединяемый с бурильной машиной, по меньшей мере, один блок управления, снабженный схемой размещения шпуров, устройство отображения блока управления для обеспечения отображения схемы размещения шпуров, по меньшей мере, один элемент управления для ручного управления бурильным блоком и, по меньшей мере, один датчик для определения местоположения и направления бурильного блока. При этом в блок управления загруж�</description><subject>AMMUNITION</subject><subject>BLASTING</subject><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GALLERIES</subject><subject>HEATING</subject><subject>LARGE UNDERGROUND CHAMBERS</subject><subject>LIGHTING</subject><subject>MECHANICAL ENGINEERING</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><subject>SHAFTS</subject><subject>TUNNELS</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2011</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjMsKwjAQRbtxIeo_zAfoovUBXcYkTQbyKJPpupQSV6KF-v9Y0Q9wdQ-Xc--6GH1U2KAUjDGA12yjgtiAIBLBaK8DQ5J2gU97jaShRU57UITOYTCAIbFw7nsggoKWoiHhl8VCqpO8LVa34T7n3S83BTSapT3k6dnneRrG_MivnrrqVJ6rSy3L4x_KG6u0M_c</recordid><startdate>20110327</startdate><enddate>20110327</enddate><creator>KHAVERINEN EHMELI</creator><scope>EVB</scope></search><sort><creationdate>20110327</creationdate><title>MODIFICATION METHOD OF ARRANGEMENT SCHEME OF BORE PITS, DRILLING INSTALLATION AND PROGRAMME PRODUCT</title><author>KHAVERINEN EHMELI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2415269C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2011</creationdate><topic>AMMUNITION</topic><topic>BLASTING</topic><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GALLERIES</topic><topic>HEATING</topic><topic>LARGE UNDERGROUND CHAMBERS</topic><topic>LIGHTING</topic><topic>MECHANICAL ENGINEERING</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><topic>SHAFTS</topic><topic>TUNNELS</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>KHAVERINEN EHMELI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KHAVERINEN EHMELI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>MODIFICATION METHOD OF ARRANGEMENT SCHEME OF BORE PITS, DRILLING INSTALLATION AND PROGRAMME PRODUCT</title><date>2011-03-27</date><risdate>2011</risdate><abstract>FIELD: mining. ^ SUBSTANCE: modification method of arrangement scheme of bore pits in drilling installation consists of the following stages: initial location points of bore pits are displayed on display device of control unit according to arrangement scheme of bore pits, arrangement scheme of bore pits in drilling installation is modified prior to its execution and arrangement scheme of bore pits is updated as per the performed modifications. At that, there chosen is at least one bore pit in bore pit arrangement scheme and initial location point of the chosen bore pit with location of drilling block; then, drilling block is moved manually to the chosen place at the drilling site and arrangement scheme of bore pits is modified by moving the initial location point of the chosen bore pit to a new location point specified with drilling block. The proposed method is implemented by means of drilling installation containing moving transport vehicle, at least one drilling manipulator and at least one drilling block containing guide beam installed on drilling manipulator, drilling machine moved with supply device, and the tool connected to drilling machine; at least, one control unit equipped with bore pit arrangement scheme, display device of control unit to provide the display of bore pit arrangement scheme; at least, one control element for manual control of drilling block and at least one sensor for determination of location and direction of drilling block. At that, to the control unit there loaded is programme product providing the selection by the operator at least of one bore pit in arrangement scheme of bore pits and connection of initial location point of chosen bore pit with location of drilling block; modification in arrangement scheme of bore pits of initial point of the selected bore pit from initial location point to new point in response to displacement with manual control of drilling block, and update of arrangement scheme of bore pits as per the performed modifications. ^ EFFECT: group of inventions allows determining arrangement schemes of bore pits for improvement of efficiency of driving of mine workings depending on mountain conditions immediately in the place where drilling works are performed. ^ 10 cl, 7 dwg Изобретение относится к горному делу, в частности к способу разметки схемы размещения шпуров на забое выработки. Способ модификации схемы размещения шпуров в буровой установке, содержащий следующие этапы: отображают на устройстве отображения блока управления начальные точки заложения шпуров согласно схеме размещения шпуров, модифицируют схему размещения шпуров в буровой установке перед ее исполнением и обновляют схему размещения шпуров по выполненным модификациям. При этом выбирают, по меньшей мере, один шпур в схеме размещения шпуров и соединяют начальную точку заложения выбранного шпура с местоположением бурильного блока, затем перемещают бурильный блок вручную в выбранное местоположение на площадке бурения и модифицируют схему размещения шпуров посредством переноса начальной точки заложения выбранного шпура в новую точку заложения, указанную бурильным блоком. Предложенный способ осуществляется с помощью буровой установки, содержащей подвижное транспортное средство, по меньшей мере, один бурильный манипулятор и, по меньшей мере, один бурильный блок, содержащий направляющую балку, установленную на бурильном манипуляторе, бурильную машину, перемещаемую устройством подачи, и инструмент, соединяемый с бурильной машиной, по меньшей мере, один блок управления, снабженный схемой размещения шпуров, устройство отображения блока управления для обеспечения отображения схемы размещения шпуров, по меньшей мере, один элемент управления для ручного управления бурильным блоком и, по меньшей мере, один датчик для определения местоположения и направления бурильного блока. При этом в блок управления загруж�</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; rus
recordid cdi_epo_espacenet_RU2415269C1
source esp@cenet
subjects AMMUNITION
BLASTING
EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
GALLERIES
HEATING
LARGE UNDERGROUND CHAMBERS
LIGHTING
MECHANICAL ENGINEERING
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
SHAFTS
TUNNELS
WEAPONS
title MODIFICATION METHOD OF ARRANGEMENT SCHEME OF BORE PITS, DRILLING INSTALLATION AND PROGRAMME PRODUCT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T20%3A36%3A20IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KHAVERINEN%20EHMELI&rft.date=2011-03-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2415269C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true