METHOD FOR CONSTRUCTION OF WELL FOR OPERATING PRODUCTIVE BED OF OIL OR GAS DEPOSIT

FIELD: oil and gas extractive industry. ^ SUBSTANCE: method includes drilling of operation well, forming in productive bed within feeding range of operation bed of at least one level of main draining system by drilling horizontal shafts from operation well above productive bed, and driving said shaf...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: POVALIKHIN A.S
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator POVALIKHIN A.S
description FIELD: oil and gas extractive industry. ^ SUBSTANCE: method includes drilling of operation well, forming in productive bed within feeding range of operation bed of at least one level of main draining system by drilling horizontal shafts from operation well above productive bed, and driving said shafts in radial direction, also, to prevent fast watering of well, before start of its operation, hollows of horizontal shafts are isolated from operation well. In productive bed in feeding range of operation well on one level with main draining system additional draining system is formed, one additional level of main and/or additional draining systems is formed, hollows of operation well and horizontal shafts is additionally connected by hydraulic fracturing of bed, before isolation of hollow of operation well from hollow of horizontal shafts, filter is mounted in the latter, as well as porous oil-attracting hydro-repelling material. ^ EFFECT: higher efficiency and durability. ^ 6 cl, 2 dwg, 1 ex
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2245439C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2245439C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2245439C13</originalsourceid><addsrcrecordid>eNrjZAjydQ3x8HdRcPMPUnD29wsOCQp1DvH091Pwd1MId_XxAUv4B7gGOYZ4-rkrBAT5u4AUhLkqOLm6gBT5e_ooAJW4OwYruLgG-Ad7hvAwsKYl5hSn8kJpbgYFN9cQZw_d1IL8-NTigsTk1LzUkvigUCMjE1MTY0tnQ2MilAAAaqQvLA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR CONSTRUCTION OF WELL FOR OPERATING PRODUCTIVE BED OF OIL OR GAS DEPOSIT</title><source>esp@cenet</source><creator>POVALIKHIN A.S</creator><creatorcontrib>POVALIKHIN A.S</creatorcontrib><description>FIELD: oil and gas extractive industry. ^ SUBSTANCE: method includes drilling of operation well, forming in productive bed within feeding range of operation bed of at least one level of main draining system by drilling horizontal shafts from operation well above productive bed, and driving said shafts in radial direction, also, to prevent fast watering of well, before start of its operation, hollows of horizontal shafts are isolated from operation well. In productive bed in feeding range of operation well on one level with main draining system additional draining system is formed, one additional level of main and/or additional draining systems is formed, hollows of operation well and horizontal shafts is additionally connected by hydraulic fracturing of bed, before isolation of hollow of operation well from hollow of horizontal shafts, filter is mounted in the latter, as well as porous oil-attracting hydro-repelling material. ^ EFFECT: higher efficiency and durability. ^ 6 cl, 2 dwg, 1 ex</description><edition>7</edition><language>eng ; rus</language><subject>EARTH DRILLING ; EARTH DRILLING, e.g. DEEP DRILLING ; FIXED CONSTRUCTIONS ; MINING ; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><creationdate>2005</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20050127&amp;DB=EPODOC&amp;CC=RU&amp;NR=2245439C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76419</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20050127&amp;DB=EPODOC&amp;CC=RU&amp;NR=2245439C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>POVALIKHIN A.S</creatorcontrib><title>METHOD FOR CONSTRUCTION OF WELL FOR OPERATING PRODUCTIVE BED OF OIL OR GAS DEPOSIT</title><description>FIELD: oil and gas extractive industry. ^ SUBSTANCE: method includes drilling of operation well, forming in productive bed within feeding range of operation bed of at least one level of main draining system by drilling horizontal shafts from operation well above productive bed, and driving said shafts in radial direction, also, to prevent fast watering of well, before start of its operation, hollows of horizontal shafts are isolated from operation well. In productive bed in feeding range of operation well on one level with main draining system additional draining system is formed, one additional level of main and/or additional draining systems is formed, hollows of operation well and horizontal shafts is additionally connected by hydraulic fracturing of bed, before isolation of hollow of operation well from hollow of horizontal shafts, filter is mounted in the latter, as well as porous oil-attracting hydro-repelling material. ^ EFFECT: higher efficiency and durability. ^ 6 cl, 2 dwg, 1 ex</description><subject>EARTH DRILLING</subject><subject>EARTH DRILLING, e.g. DEEP DRILLING</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MINING</subject><subject>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2005</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZAjydQ3x8HdRcPMPUnD29wsOCQp1DvH091Pwd1MId_XxAUv4B7gGOYZ4-rkrBAT5u4AUhLkqOLm6gBT5e_ooAJW4OwYruLgG-Ad7hvAwsKYl5hSn8kJpbgYFN9cQZw_d1IL8-NTigsTk1LzUkvigUCMjE1MTY0tnQ2MilAAAaqQvLA</recordid><startdate>20050127</startdate><enddate>20050127</enddate><creator>POVALIKHIN A.S</creator><scope>EVB</scope></search><sort><creationdate>20050127</creationdate><title>METHOD FOR CONSTRUCTION OF WELL FOR OPERATING PRODUCTIVE BED OF OIL OR GAS DEPOSIT</title><author>POVALIKHIN A.S</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2245439C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; rus</language><creationdate>2005</creationdate><topic>EARTH DRILLING</topic><topic>EARTH DRILLING, e.g. DEEP DRILLING</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MINING</topic><topic>OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS</topic><toplevel>online_resources</toplevel><creatorcontrib>POVALIKHIN A.S</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>POVALIKHIN A.S</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR CONSTRUCTION OF WELL FOR OPERATING PRODUCTIVE BED OF OIL OR GAS DEPOSIT</title><date>2005-01-27</date><risdate>2005</risdate><abstract>FIELD: oil and gas extractive industry. ^ SUBSTANCE: method includes drilling of operation well, forming in productive bed within feeding range of operation bed of at least one level of main draining system by drilling horizontal shafts from operation well above productive bed, and driving said shafts in radial direction, also, to prevent fast watering of well, before start of its operation, hollows of horizontal shafts are isolated from operation well. In productive bed in feeding range of operation well on one level with main draining system additional draining system is formed, one additional level of main and/or additional draining systems is formed, hollows of operation well and horizontal shafts is additionally connected by hydraulic fracturing of bed, before isolation of hollow of operation well from hollow of horizontal shafts, filter is mounted in the latter, as well as porous oil-attracting hydro-repelling material. ^ EFFECT: higher efficiency and durability. ^ 6 cl, 2 dwg, 1 ex</abstract><edition>7</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; rus
recordid cdi_epo_espacenet_RU2245439C1
source esp@cenet
subjects EARTH DRILLING
EARTH DRILLING, e.g. DEEP DRILLING
FIXED CONSTRUCTIONS
MINING
OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR ASLURRY OF MINERALS FROM WELLS
title METHOD FOR CONSTRUCTION OF WELL FOR OPERATING PRODUCTIVE BED OF OIL OR GAS DEPOSIT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-07T16%3A16%3A09IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=POVALIKHIN%20A.S&rft.date=2005-01-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2245439C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true