PROCESS FIXING SLOPE OF SOIL FOUNDATION TRENCH

FIELD: civil engineering. SUBSTANCE: in agreement with proposed process tubular injector at least one meter longer than depth of foundation trench is driven into soil base prior to stripping of foundation trench, reinforcing rod is placed into tubular injector, lost tip is pushed by rod, injector is...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: FEDOROV V.K, LUBJAGIN A.V, SBOEV V.M
Format: Patent
Sprache:eng ; rus
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!