METHOD OF BALLASTING SUBTERRANEAN PIPE LINE

construction engineering; repair of main pipe lines in water-bearing ground; laying main pipe lines. SUBSTANCE: pipe line is ballasted in trench with fill-up soil kept in longitudinal pots made from flexible material. Pots are located along pipe line at gaps between end walls of longitudinal pots fo...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TEPLINSKIJ JU.A, ILATOVSKIJ JU.V, JAKOVLEV A.JA, SHARYGIN V.M, BEREZIN S.S
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!