METHOD FOR DEEP VIBRATION COMPACTING OF SANDY GROUND
FIELD: construction engineering. SUBSTANCE: according to method, sunken into sandy ground is vibrating compactor. Sinking depth is dictated by design requirements. Operating compactor is kept in ground as required and then is lifted to ground surface. In its lower part, compactor has three-dimension...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | MINAEV O.P SEVENARD JU.K PERLEJ E.M SOSNIN A.I |
description | FIELD: construction engineering. SUBSTANCE: according to method, sunken into sandy ground is vibrating compactor. Sinking depth is dictated by design requirements. Operating compactor is kept in ground as required and then is lifted to ground surface. In its lower part, compactor has three-dimensional structure which is made up of radial components. Compactor together with three-dimensional structure is used in ground section with height h from 1.5-2 m to 1/2 of designed depth of ground to be compacted. This relates to each layer of ground being compacted and subjected to compacting action produced by three-dimensional structure of compactor. Duration of compacting action depends on initial density of ground in given layer so as to ensure more or less uniform density of ground in depth. EFFECT: higher efficiency. 2 cl, 4 dwg |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2135690C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2135690C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2135690C13</originalsourceid><addsrcrecordid>eNrjZDDxdQ3x8HdRcPMPUnBxdQ1QCPN0CnIM8fT3U3D29w1wdA7x9HNX8HdTCHb0c4lUcA_yD_Vz4WFgTUvMKU7lhdLcDApuriHOHrqpBfnxqcUFicmpeakl8UGhRobGpmaWBs6GxkQoAQBs2yb7</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD FOR DEEP VIBRATION COMPACTING OF SANDY GROUND</title><source>esp@cenet</source><creator>MINAEV O.P ; SEVENARD JU.K ; PERLEJ E.M ; SOSNIN A.I</creator><creatorcontrib>MINAEV O.P ; SEVENARD JU.K ; PERLEJ E.M ; SOSNIN A.I</creatorcontrib><description>FIELD: construction engineering. SUBSTANCE: according to method, sunken into sandy ground is vibrating compactor. Sinking depth is dictated by design requirements. Operating compactor is kept in ground as required and then is lifted to ground surface. In its lower part, compactor has three-dimensional structure which is made up of radial components. Compactor together with three-dimensional structure is used in ground section with height h from 1.5-2 m to 1/2 of designed depth of ground to be compacted. This relates to each layer of ground being compacted and subjected to compacting action produced by three-dimensional structure of compactor. Duration of compacting action depends on initial density of ground in given layer so as to ensure more or less uniform density of ground in depth. EFFECT: higher efficiency. 2 cl, 4 dwg</description><edition>6</edition><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1999</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19990827&DB=EPODOC&CC=RU&NR=2135690C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25562,76317</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19990827&DB=EPODOC&CC=RU&NR=2135690C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MINAEV O.P</creatorcontrib><creatorcontrib>SEVENARD JU.K</creatorcontrib><creatorcontrib>PERLEJ E.M</creatorcontrib><creatorcontrib>SOSNIN A.I</creatorcontrib><title>METHOD FOR DEEP VIBRATION COMPACTING OF SANDY GROUND</title><description>FIELD: construction engineering. SUBSTANCE: according to method, sunken into sandy ground is vibrating compactor. Sinking depth is dictated by design requirements. Operating compactor is kept in ground as required and then is lifted to ground surface. In its lower part, compactor has three-dimensional structure which is made up of radial components. Compactor together with three-dimensional structure is used in ground section with height h from 1.5-2 m to 1/2 of designed depth of ground to be compacted. This relates to each layer of ground being compacted and subjected to compacting action produced by three-dimensional structure of compactor. Duration of compacting action depends on initial density of ground in given layer so as to ensure more or less uniform density of ground in depth. EFFECT: higher efficiency. 2 cl, 4 dwg</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1999</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDDxdQ3x8HdRcPMPUnBxdQ1QCPN0CnIM8fT3U3D29w1wdA7x9HNX8HdTCHb0c4lUcA_yD_Vz4WFgTUvMKU7lhdLcDApuriHOHrqpBfnxqcUFicmpeakl8UGhRobGpmaWBs6GxkQoAQBs2yb7</recordid><startdate>19990827</startdate><enddate>19990827</enddate><creator>MINAEV O.P</creator><creator>SEVENARD JU.K</creator><creator>PERLEJ E.M</creator><creator>SOSNIN A.I</creator><scope>EVB</scope></search><sort><creationdate>19990827</creationdate><title>METHOD FOR DEEP VIBRATION COMPACTING OF SANDY GROUND</title><author>MINAEV O.P ; SEVENARD JU.K ; PERLEJ E.M ; SOSNIN A.I</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2135690C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1999</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>MINAEV O.P</creatorcontrib><creatorcontrib>SEVENARD JU.K</creatorcontrib><creatorcontrib>PERLEJ E.M</creatorcontrib><creatorcontrib>SOSNIN A.I</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MINAEV O.P</au><au>SEVENARD JU.K</au><au>PERLEJ E.M</au><au>SOSNIN A.I</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD FOR DEEP VIBRATION COMPACTING OF SANDY GROUND</title><date>1999-08-27</date><risdate>1999</risdate><abstract>FIELD: construction engineering. SUBSTANCE: according to method, sunken into sandy ground is vibrating compactor. Sinking depth is dictated by design requirements. Operating compactor is kept in ground as required and then is lifted to ground surface. In its lower part, compactor has three-dimensional structure which is made up of radial components. Compactor together with three-dimensional structure is used in ground section with height h from 1.5-2 m to 1/2 of designed depth of ground to be compacted. This relates to each layer of ground being compacted and subjected to compacting action produced by three-dimensional structure of compactor. Duration of compacting action depends on initial density of ground in given layer so as to ensure more or less uniform density of ground in depth. EFFECT: higher efficiency. 2 cl, 4 dwg</abstract><edition>6</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_RU2135690C1 |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | METHOD FOR DEEP VIBRATION COMPACTING OF SANDY GROUND |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-09T18%3A03%3A53IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MINAEV%20O.P&rft.date=1999-08-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2135690C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |