METHOD OF AND COMPLEX FOR RELIEVING TEMPERATURE STRESSES IN CONTINUOUS WELDED RAIL LENGTHS
FIELD: railway transport; permanent way servicing. SUBSTANCE: according to proposed method, length-to-tie connections are loosened and rail length is lifted on supports featuring low friction coefficient, then tension is applied to length and the latter is heated. Complex includes track machine with...
Gespeichert in:
Hauptverfasser: | , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | ISHCHENKO D.M FENDRIKOV A.I DOBROSKOKIN V.N KONOVALOV S.V SEIN N.I ARASLANKIN V.N |
description | FIELD: railway transport; permanent way servicing. SUBSTANCE: according to proposed method, length-to-tie connections are loosened and rail length is lifted on supports featuring low friction coefficient, then tension is applied to length and the latter is heated. Complex includes track machine with tension device, continuous rail length lifting device, heating device is form of steam heating plant with system of steam passing channels, and nut runner. EFFECT: increased efficiency of stress relief. 5 cl, 10 dwg |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_RU2135669C1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>RU2135669C1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_RU2135669C13</originalsourceid><addsrcrecordid>eNqNyjEKwjAUBuAuDqLe4V3AoRYLjqX52wTSpLy8VHEpReIkWqj3RwcP4PQt3zq7dhDtFfmGKqeo9l1vcaHGMzGswWBcS4KuB1cSGRSEEQICGffdToyLPgY6wyoo4spYsnCt6LDNVvfpsaTdz01GDaTW-zS_xrTM0y0903vkeMiLY1me6rz4o3wACPgxyA</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD OF AND COMPLEX FOR RELIEVING TEMPERATURE STRESSES IN CONTINUOUS WELDED RAIL LENGTHS</title><source>esp@cenet</source><creator>ISHCHENKO D.M ; FENDRIKOV A.I ; DOBROSKOKIN V.N ; KONOVALOV S.V ; SEIN N.I ; ARASLANKIN V.N</creator><creatorcontrib>ISHCHENKO D.M ; FENDRIKOV A.I ; DOBROSKOKIN V.N ; KONOVALOV S.V ; SEIN N.I ; ARASLANKIN V.N</creatorcontrib><description>FIELD: railway transport; permanent way servicing. SUBSTANCE: according to proposed method, length-to-tie connections are loosened and rail length is lifted on supports featuring low friction coefficient, then tension is applied to length and the latter is heated. Complex includes track machine with tension device, continuous rail length lifting device, heating device is form of steam heating plant with system of steam passing channels, and nut runner. EFFECT: increased efficiency of stress relief. 5 cl, 10 dwg</description><edition>6</edition><language>eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; MACHINES FOR MAKING RAILWAYS OF ALL KINDS ; PERMANENT WAY ; PERMANENT-WAY TOOLS</subject><creationdate>1999</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19990827&DB=EPODOC&CC=RU&NR=2135669C1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19990827&DB=EPODOC&CC=RU&NR=2135669C1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ISHCHENKO D.M</creatorcontrib><creatorcontrib>FENDRIKOV A.I</creatorcontrib><creatorcontrib>DOBROSKOKIN V.N</creatorcontrib><creatorcontrib>KONOVALOV S.V</creatorcontrib><creatorcontrib>SEIN N.I</creatorcontrib><creatorcontrib>ARASLANKIN V.N</creatorcontrib><title>METHOD OF AND COMPLEX FOR RELIEVING TEMPERATURE STRESSES IN CONTINUOUS WELDED RAIL LENGTHS</title><description>FIELD: railway transport; permanent way servicing. SUBSTANCE: according to proposed method, length-to-tie connections are loosened and rail length is lifted on supports featuring low friction coefficient, then tension is applied to length and the latter is heated. Complex includes track machine with tension device, continuous rail length lifting device, heating device is form of steam heating plant with system of steam passing channels, and nut runner. EFFECT: increased efficiency of stress relief. 5 cl, 10 dwg</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</subject><subject>PERMANENT WAY</subject><subject>PERMANENT-WAY TOOLS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1999</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNyjEKwjAUBuAuDqLe4V3AoRYLjqX52wTSpLy8VHEpReIkWqj3RwcP4PQt3zq7dhDtFfmGKqeo9l1vcaHGMzGswWBcS4KuB1cSGRSEEQICGffdToyLPgY6wyoo4spYsnCt6LDNVvfpsaTdz01GDaTW-zS_xrTM0y0903vkeMiLY1me6rz4o3wACPgxyA</recordid><startdate>19990827</startdate><enddate>19990827</enddate><creator>ISHCHENKO D.M</creator><creator>FENDRIKOV A.I</creator><creator>DOBROSKOKIN V.N</creator><creator>KONOVALOV S.V</creator><creator>SEIN N.I</creator><creator>ARASLANKIN V.N</creator><scope>EVB</scope></search><sort><creationdate>19990827</creationdate><title>METHOD OF AND COMPLEX FOR RELIEVING TEMPERATURE STRESSES IN CONTINUOUS WELDED RAIL LENGTHS</title><author>ISHCHENKO D.M ; FENDRIKOV A.I ; DOBROSKOKIN V.N ; KONOVALOV S.V ; SEIN N.I ; ARASLANKIN V.N</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_RU2135669C13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1999</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES FOR MAKING RAILWAYS OF ALL KINDS</topic><topic>PERMANENT WAY</topic><topic>PERMANENT-WAY TOOLS</topic><toplevel>online_resources</toplevel><creatorcontrib>ISHCHENKO D.M</creatorcontrib><creatorcontrib>FENDRIKOV A.I</creatorcontrib><creatorcontrib>DOBROSKOKIN V.N</creatorcontrib><creatorcontrib>KONOVALOV S.V</creatorcontrib><creatorcontrib>SEIN N.I</creatorcontrib><creatorcontrib>ARASLANKIN V.N</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ISHCHENKO D.M</au><au>FENDRIKOV A.I</au><au>DOBROSKOKIN V.N</au><au>KONOVALOV S.V</au><au>SEIN N.I</au><au>ARASLANKIN V.N</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD OF AND COMPLEX FOR RELIEVING TEMPERATURE STRESSES IN CONTINUOUS WELDED RAIL LENGTHS</title><date>1999-08-27</date><risdate>1999</risdate><abstract>FIELD: railway transport; permanent way servicing. SUBSTANCE: according to proposed method, length-to-tie connections are loosened and rail length is lifted on supports featuring low friction coefficient, then tension is applied to length and the latter is heated. Complex includes track machine with tension device, continuous rail length lifting device, heating device is form of steam heating plant with system of steam passing channels, and nut runner. EFFECT: increased efficiency of stress relief. 5 cl, 10 dwg</abstract><edition>6</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_RU2135669C1 |
source | esp@cenet |
subjects | CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES FIXED CONSTRUCTIONS MACHINES FOR MAKING RAILWAYS OF ALL KINDS PERMANENT WAY PERMANENT-WAY TOOLS |
title | METHOD OF AND COMPLEX FOR RELIEVING TEMPERATURE STRESSES IN CONTINUOUS WELDED RAIL LENGTHS |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-04T14%3A17%3A37IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ISHCHENKO%20D.M&rft.date=1999-08-27&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3ERU2135669C1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |