COMBINATION TUBBING FOR TUNNEL LINING AND METHOD OF ITS PRODUCTION
FIELD: tunneling technology. SUBSTANCE: this relates to building of underground structures in watered ground and it is aimed at increasing load-bearing capacity and waterproofness of tunnel lining. Ribs at places of installing bolts are made double-layer, they are steel perforated strips welded with...
Gespeichert in:
Hauptverfasser: | , , , , , , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!