Road surface grooving structure

The present invention relates to a road surface grooving structure formed by cutting a surface of a road. The road surface grooving structure comprises a plurality of main grooves (100). The plurality of main grooves (100) include a first groove (110), a second groove (120), a third groove (130), an...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LEE, HAN IK, LEE BO NAM, KOO, BON GUK
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LEE, HAN IK
LEE BO NAM
KOO, BON GUK
description The present invention relates to a road surface grooving structure formed by cutting a surface of a road. The road surface grooving structure comprises a plurality of main grooves (100). The plurality of main grooves (100) include a first groove (110), a second groove (120), a third groove (130), and a fourth groove (140) arranged in parallel in order in the horizontal direction. The plurality of main grooves (100) are repeatedly provided on the road surface at regular intervals. Accordingly, the first groove (110), the second groove (120), the third groove (130), and the fourth groove (140) are repeatedly formed in order. Therefore, the road surface grooving structure is capable of reducing functional deterioration of grooving. 본 발명은, 도로의 표면을 절삭하여 형성되는 노면 그루빙 구조에 있어서, 상기 노면 그루빙 구조는 메인홈(100)을 포함하고, 상기 메인홈(100)은 수평방향으로 순서대로 평행하게 배열되는 제1홈(110), 제2홈(120), 제3홈(130) 및 제4홈(140)을 포함하며, 상기 메인홈(100)이 일정 간격을 두고 노면에 복수 개 반복 구비됨으로써 상기 제1홈(110), 제2홈(120), 제3홈(130) 및 제4홈(140)이 순서대로 반복 형성되는 것을 특징으로 하는 노면 그루빙 구조에 관한 것이다.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_KR102468730BB1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>KR102468730BB1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_KR102468730BB13</originalsourceid><addsrcrecordid>eNrjZJAPyk9MUSguLUpLTE5VSC_Kzy_LzEtXKC4pKk0uKS1K5WFgTUvMKU7lhdLcDMpuriHOHrqpBfnxqcUFQF15qSXx3kGGBkYmZhbmxgZOTobGxKkCANjTJjM</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>Road surface grooving structure</title><source>esp@cenet</source><creator>LEE, HAN IK ; LEE BO NAM ; KOO, BON GUK</creator><creatorcontrib>LEE, HAN IK ; LEE BO NAM ; KOO, BON GUK</creatorcontrib><description>The present invention relates to a road surface grooving structure formed by cutting a surface of a road. The road surface grooving structure comprises a plurality of main grooves (100). The plurality of main grooves (100) include a first groove (110), a second groove (120), a third groove (130), and a fourth groove (140) arranged in parallel in order in the horizontal direction. The plurality of main grooves (100) are repeatedly provided on the road surface at regular intervals. Accordingly, the first groove (110), the second groove (120), the third groove (130), and the fourth groove (140) are repeatedly formed in order. Therefore, the road surface grooving structure is capable of reducing functional deterioration of grooving. 본 발명은, 도로의 표면을 절삭하여 형성되는 노면 그루빙 구조에 있어서, 상기 노면 그루빙 구조는 메인홈(100)을 포함하고, 상기 메인홈(100)은 수평방향으로 순서대로 평행하게 배열되는 제1홈(110), 제2홈(120), 제3홈(130) 및 제4홈(140)을 포함하며, 상기 메인홈(100)이 일정 간격을 두고 노면에 복수 개 반복 구비됨으로써 상기 제1홈(110), 제2홈(120), 제3홈(130) 및 제4홈(140)이 순서대로 반복 형성되는 것을 특징으로 하는 노면 그루빙 구조에 관한 것이다.</description><language>eng ; kor</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><creationdate>2022</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221118&amp;DB=EPODOC&amp;CC=KR&amp;NR=102468730B1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20221118&amp;DB=EPODOC&amp;CC=KR&amp;NR=102468730B1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LEE, HAN IK</creatorcontrib><creatorcontrib>LEE BO NAM</creatorcontrib><creatorcontrib>KOO, BON GUK</creatorcontrib><title>Road surface grooving structure</title><description>The present invention relates to a road surface grooving structure formed by cutting a surface of a road. The road surface grooving structure comprises a plurality of main grooves (100). The plurality of main grooves (100) include a first groove (110), a second groove (120), a third groove (130), and a fourth groove (140) arranged in parallel in order in the horizontal direction. The plurality of main grooves (100) are repeatedly provided on the road surface at regular intervals. Accordingly, the first groove (110), the second groove (120), the third groove (130), and the fourth groove (140) are repeatedly formed in order. Therefore, the road surface grooving structure is capable of reducing functional deterioration of grooving. 본 발명은, 도로의 표면을 절삭하여 형성되는 노면 그루빙 구조에 있어서, 상기 노면 그루빙 구조는 메인홈(100)을 포함하고, 상기 메인홈(100)은 수평방향으로 순서대로 평행하게 배열되는 제1홈(110), 제2홈(120), 제3홈(130) 및 제4홈(140)을 포함하며, 상기 메인홈(100)이 일정 간격을 두고 노면에 복수 개 반복 구비됨으로써 상기 제1홈(110), 제2홈(120), 제3홈(130) 및 제4홈(140)이 순서대로 반복 형성되는 것을 특징으로 하는 노면 그루빙 구조에 관한 것이다.</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2022</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZJAPyk9MUSguLUpLTE5VSC_Kzy_LzEtXKC4pKk0uKS1K5WFgTUvMKU7lhdLcDMpuriHOHrqpBfnxqcUFQF15qSXx3kGGBkYmZhbmxgZOTobGxKkCANjTJjM</recordid><startdate>20221118</startdate><enddate>20221118</enddate><creator>LEE, HAN IK</creator><creator>LEE BO NAM</creator><creator>KOO, BON GUK</creator><scope>EVB</scope></search><sort><creationdate>20221118</creationdate><title>Road surface grooving structure</title><author>LEE, HAN IK ; LEE BO NAM ; KOO, BON GUK</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_KR102468730BB13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; kor</language><creationdate>2022</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><toplevel>online_resources</toplevel><creatorcontrib>LEE, HAN IK</creatorcontrib><creatorcontrib>LEE BO NAM</creatorcontrib><creatorcontrib>KOO, BON GUK</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LEE, HAN IK</au><au>LEE BO NAM</au><au>KOO, BON GUK</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>Road surface grooving structure</title><date>2022-11-18</date><risdate>2022</risdate><abstract>The present invention relates to a road surface grooving structure formed by cutting a surface of a road. The road surface grooving structure comprises a plurality of main grooves (100). The plurality of main grooves (100) include a first groove (110), a second groove (120), a third groove (130), and a fourth groove (140) arranged in parallel in order in the horizontal direction. The plurality of main grooves (100) are repeatedly provided on the road surface at regular intervals. Accordingly, the first groove (110), the second groove (120), the third groove (130), and the fourth groove (140) are repeatedly formed in order. Therefore, the road surface grooving structure is capable of reducing functional deterioration of grooving. 본 발명은, 도로의 표면을 절삭하여 형성되는 노면 그루빙 구조에 있어서, 상기 노면 그루빙 구조는 메인홈(100)을 포함하고, 상기 메인홈(100)은 수평방향으로 순서대로 평행하게 배열되는 제1홈(110), 제2홈(120), 제3홈(130) 및 제4홈(140)을 포함하며, 상기 메인홈(100)이 일정 간격을 두고 노면에 복수 개 반복 구비됨으로써 상기 제1홈(110), 제2홈(120), 제3홈(130) 및 제4홈(140)이 순서대로 반복 형성되는 것을 특징으로 하는 노면 그루빙 구조에 관한 것이다.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; kor
recordid cdi_epo_espacenet_KR102468730BB1
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
FIXED CONSTRUCTIONS
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
title Road surface grooving structure
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-11T08%3A36%3A46IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LEE,%20HAN%20IK&rft.date=2022-11-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EKR102468730BB1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true