PRECAST CONCRETE SLAB SYSTEM FOR BUILDING WHICH HAVE LONG SPAN AND REQUIRE HIGH DESIGN LOAD AND CONSTRUCTION METHOD USING THIS SYSTEM

PURPOSE: A PC(precast concrete) slab for a long-span and high-load building and a construction method thereof are provided to minimize cracks generated between plates by efficiently transferring an unbalanced load to the plates. CONSTITUTION: A PC slab(10) for a long-span and high-load building is c...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: LEE, WON KYU, CHOI, IL SUP, KO, SOO
Format: Patent
Sprache:eng ; kor
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator LEE, WON KYU
CHOI, IL SUP
KO, SOO
description PURPOSE: A PC(precast concrete) slab for a long-span and high-load building and a construction method thereof are provided to minimize cracks generated between plates by efficiently transferring an unbalanced load to the plates. CONSTITUTION: A PC slab(10) for a long-span and high-load building is composed of a bottom part(11), multiple rib parts(12), and a top part. The bottom part is reinforced by reinforcing bars or wire meshes arranged in a latticed shape. The ribs are protruded from the bottom part in a longitudinal direction. Shear reinforcement bars(122) are arranged along the longitudinal direction of the ribs. The top part is formed on the top of the rib parts to be parallel to the bottom part. L-shaped reinforcing bars(131) for transferring an unbalanced load are arranged on both ends of the top part at uniform intervals.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_KR101152270BB1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>KR101152270BB1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_KR101152270BB13</originalsourceid><addsrcrecordid>eNqNjU0KwjAUhLtxIeodHrgW2oq4zs9rE2yTmpcorkqRuBIt1Ct4b6v0AK6GYT6-mSfvxqFg5EFYIxx6BKoYB7qQxxoK64AHXUltSjgrLRQodkKo7NipYQaYkeDwGLRDULpUIJF0aUaCyd84esm7ILy2Bmr0ykoI9PV5pWk6WiazW3cf4mrKRbIu0Au1if2zjUPfXeMjvtqDy9Is2-X5PuU82_5HfQBlWj48</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PRECAST CONCRETE SLAB SYSTEM FOR BUILDING WHICH HAVE LONG SPAN AND REQUIRE HIGH DESIGN LOAD AND CONSTRUCTION METHOD USING THIS SYSTEM</title><source>esp@cenet</source><creator>LEE, WON KYU ; CHOI, IL SUP ; KO, SOO</creator><creatorcontrib>LEE, WON KYU ; CHOI, IL SUP ; KO, SOO</creatorcontrib><description>PURPOSE: A PC(precast concrete) slab for a long-span and high-load building and a construction method thereof are provided to minimize cracks generated between plates by efficiently transferring an unbalanced load to the plates. CONSTITUTION: A PC slab(10) for a long-span and high-load building is composed of a bottom part(11), multiple rib parts(12), and a top part. The bottom part is reinforced by reinforcing bars or wire meshes arranged in a latticed shape. The ribs are protruded from the bottom part in a longitudinal direction. Shear reinforcement bars(122) are arranged along the longitudinal direction of the ribs. The top part is formed on the top of the rib parts to be parallel to the bottom part. L-shaped reinforcing bars(131) for transferring an unbalanced load are arranged on both ends of the top part at uniform intervals.</description><language>eng ; kor</language><subject>BUILDING ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; WALLS, e.g. PARTITIONS</subject><creationdate>2012</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20120619&amp;DB=EPODOC&amp;CC=KR&amp;NR=101152270B1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76318</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20120619&amp;DB=EPODOC&amp;CC=KR&amp;NR=101152270B1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>LEE, WON KYU</creatorcontrib><creatorcontrib>CHOI, IL SUP</creatorcontrib><creatorcontrib>KO, SOO</creatorcontrib><title>PRECAST CONCRETE SLAB SYSTEM FOR BUILDING WHICH HAVE LONG SPAN AND REQUIRE HIGH DESIGN LOAD AND CONSTRUCTION METHOD USING THIS SYSTEM</title><description>PURPOSE: A PC(precast concrete) slab for a long-span and high-load building and a construction method thereof are provided to minimize cracks generated between plates by efficiently transferring an unbalanced load to the plates. CONSTITUTION: A PC slab(10) for a long-span and high-load building is composed of a bottom part(11), multiple rib parts(12), and a top part. The bottom part is reinforced by reinforcing bars or wire meshes arranged in a latticed shape. The ribs are protruded from the bottom part in a longitudinal direction. Shear reinforcement bars(122) are arranged along the longitudinal direction of the ribs. The top part is formed on the top of the rib parts to be parallel to the bottom part. L-shaped reinforcing bars(131) for transferring an unbalanced load are arranged on both ends of the top part at uniform intervals.</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2012</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNjU0KwjAUhLtxIeodHrgW2oq4zs9rE2yTmpcorkqRuBIt1Ct4b6v0AK6GYT6-mSfvxqFg5EFYIxx6BKoYB7qQxxoK64AHXUltSjgrLRQodkKo7NipYQaYkeDwGLRDULpUIJF0aUaCyd84esm7ILy2Bmr0ykoI9PV5pWk6WiazW3cf4mrKRbIu0Au1if2zjUPfXeMjvtqDy9Is2-X5PuU82_5HfQBlWj48</recordid><startdate>20120619</startdate><enddate>20120619</enddate><creator>LEE, WON KYU</creator><creator>CHOI, IL SUP</creator><creator>KO, SOO</creator><scope>EVB</scope></search><sort><creationdate>20120619</creationdate><title>PRECAST CONCRETE SLAB SYSTEM FOR BUILDING WHICH HAVE LONG SPAN AND REQUIRE HIGH DESIGN LOAD AND CONSTRUCTION METHOD USING THIS SYSTEM</title><author>LEE, WON KYU ; CHOI, IL SUP ; KO, SOO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_KR101152270BB13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng ; kor</language><creationdate>2012</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>LEE, WON KYU</creatorcontrib><creatorcontrib>CHOI, IL SUP</creatorcontrib><creatorcontrib>KO, SOO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>LEE, WON KYU</au><au>CHOI, IL SUP</au><au>KO, SOO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PRECAST CONCRETE SLAB SYSTEM FOR BUILDING WHICH HAVE LONG SPAN AND REQUIRE HIGH DESIGN LOAD AND CONSTRUCTION METHOD USING THIS SYSTEM</title><date>2012-06-19</date><risdate>2012</risdate><abstract>PURPOSE: A PC(precast concrete) slab for a long-span and high-load building and a construction method thereof are provided to minimize cracks generated between plates by efficiently transferring an unbalanced load to the plates. CONSTITUTION: A PC slab(10) for a long-span and high-load building is composed of a bottom part(11), multiple rib parts(12), and a top part. The bottom part is reinforced by reinforcing bars or wire meshes arranged in a latticed shape. The ribs are protruded from the bottom part in a longitudinal direction. Shear reinforcement bars(122) are arranged along the longitudinal direction of the ribs. The top part is formed on the top of the rib parts to be parallel to the bottom part. L-shaped reinforcing bars(131) for transferring an unbalanced load are arranged on both ends of the top part at uniform intervals.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng ; kor
recordid cdi_epo_espacenet_KR101152270BB1
source esp@cenet
subjects BUILDING
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
GENERAL BUILDING CONSTRUCTIONS
INSULATION OR OTHER PROTECTION OF BUILDINGS
ROOFS
WALLS, e.g. PARTITIONS
title PRECAST CONCRETE SLAB SYSTEM FOR BUILDING WHICH HAVE LONG SPAN AND REQUIRE HIGH DESIGN LOAD AND CONSTRUCTION METHOD USING THIS SYSTEM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-11T13%3A17%3A03IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=LEE,%20WON%20KYU&rft.date=2012-06-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EKR101152270BB1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true