CONSTRUCTION METHOD USING DRY TYPE WALL FOR BATHROOM

A construction method of a dry wall for a bathroom is provided to make construction simple, to shorten a period of construction and to reduce the thickness of a wall in contrast to wet wall construction method. A construction method of a dry wall for a bathroom using an upper wall panel and a lower...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KIM, JEONG TAEG, KO, YONG KEUN, SUK, CHANG KYUN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KIM, JEONG TAEG
KO, YONG KEUN
SUK, CHANG KYUN
description A construction method of a dry wall for a bathroom is provided to make construction simple, to shorten a period of construction and to reduce the thickness of a wall in contrast to wet wall construction method. A construction method of a dry wall for a bathroom using an upper wall panel and a lower wall panel supported to a cement wall of a bathroom comprises the steps of: applying a waterproof material having a thickness of about 5mm on a cement wall(100) and installing a thermal insulating material(111); installing many height regulating member(150) on the bottom of a bathroom along one side of the cement wall using adhesives; putting and fixing a lower wall panel on the top of the height regulating member, and fixing the lower wall panel to the cement wall by many brackets(170); fixing upper and lower panel fixing brackets(180), for fixing two upper parts of a lower wall panel and two lower parts of an upper wall panel to a cement wall, to the cement wall while coupled to two upper parts of the lower wall panel; coupling two lower parts of an upper wall panel to the upper and lower panel fixing brackets fixed to the cement wall; and fixing the upper wall panel coupled by the upper and lower panel fixing brackets to the cement wall by many brackets. The upper and lower panel fixing bracket comprises a fixing plate(181) fixed to the cement wall by screws(190), and a fitting plate(182) provided with upper and lower grooves(183) extended downward and downward to couple hanging projection members of the upper wall panel and the lower wall panel.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_KR100804825BB1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>KR100804825BB1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_KR100804825BB13</originalsourceid><addsrcrecordid>eNrjZDBx9vcLDgkKdQ7x9PdT8HUN8fB3UQgN9vRzV3AJilQIiQxwVQh39PFRcPMPUnByDPEI8vf35WFgTUvMKU7lhdLcDMpuriHOHrqpBfnxqcUFicmpeakl8d5BhgYGFgYmFkamTk6GxsSpAgCCOyiN</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION METHOD USING DRY TYPE WALL FOR BATHROOM</title><source>esp@cenet</source><creator>KIM, JEONG TAEG ; KO, YONG KEUN ; SUK, CHANG KYUN</creator><creatorcontrib>KIM, JEONG TAEG ; KO, YONG KEUN ; SUK, CHANG KYUN</creatorcontrib><description>A construction method of a dry wall for a bathroom is provided to make construction simple, to shorten a period of construction and to reduce the thickness of a wall in contrast to wet wall construction method. A construction method of a dry wall for a bathroom using an upper wall panel and a lower wall panel supported to a cement wall of a bathroom comprises the steps of: applying a waterproof material having a thickness of about 5mm on a cement wall(100) and installing a thermal insulating material(111); installing many height regulating member(150) on the bottom of a bathroom along one side of the cement wall using adhesives; putting and fixing a lower wall panel on the top of the height regulating member, and fixing the lower wall panel to the cement wall by many brackets(170); fixing upper and lower panel fixing brackets(180), for fixing two upper parts of a lower wall panel and two lower parts of an upper wall panel to a cement wall, to the cement wall while coupled to two upper parts of the lower wall panel; coupling two lower parts of an upper wall panel to the upper and lower panel fixing brackets fixed to the cement wall; and fixing the upper wall panel coupled by the upper and lower panel fixing brackets to the cement wall by many brackets. The upper and lower panel fixing bracket comprises a fixing plate(181) fixed to the cement wall by screws(190), and a fitting plate(182) provided with upper and lower grooves(183) extended downward and downward to couple hanging projection members of the upper wall panel and the lower wall panel.</description><language>eng</language><subject>BUILDING ; CEILINGS ; FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS ; FIXED CONSTRUCTIONS ; FLOORS ; GENERAL BUILDING CONSTRUCTIONS ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; ROOFS ; WALLS, e.g. PARTITIONS</subject><creationdate>2008</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20080220&amp;DB=EPODOC&amp;CC=KR&amp;NR=100804825B1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20080220&amp;DB=EPODOC&amp;CC=KR&amp;NR=100804825B1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KIM, JEONG TAEG</creatorcontrib><creatorcontrib>KO, YONG KEUN</creatorcontrib><creatorcontrib>SUK, CHANG KYUN</creatorcontrib><title>CONSTRUCTION METHOD USING DRY TYPE WALL FOR BATHROOM</title><description>A construction method of a dry wall for a bathroom is provided to make construction simple, to shorten a period of construction and to reduce the thickness of a wall in contrast to wet wall construction method. A construction method of a dry wall for a bathroom using an upper wall panel and a lower wall panel supported to a cement wall of a bathroom comprises the steps of: applying a waterproof material having a thickness of about 5mm on a cement wall(100) and installing a thermal insulating material(111); installing many height regulating member(150) on the bottom of a bathroom along one side of the cement wall using adhesives; putting and fixing a lower wall panel on the top of the height regulating member, and fixing the lower wall panel to the cement wall by many brackets(170); fixing upper and lower panel fixing brackets(180), for fixing two upper parts of a lower wall panel and two lower parts of an upper wall panel to a cement wall, to the cement wall while coupled to two upper parts of the lower wall panel; coupling two lower parts of an upper wall panel to the upper and lower panel fixing brackets fixed to the cement wall; and fixing the upper wall panel coupled by the upper and lower panel fixing brackets to the cement wall by many brackets. The upper and lower panel fixing bracket comprises a fixing plate(181) fixed to the cement wall by screws(190), and a fitting plate(182) provided with upper and lower grooves(183) extended downward and downward to couple hanging projection members of the upper wall panel and the lower wall panel.</description><subject>BUILDING</subject><subject>CEILINGS</subject><subject>FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>ROOFS</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2008</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDBx9vcLDgkKdQ7x9PdT8HUN8fB3UQgN9vRzV3AJilQIiQxwVQh39PFRcPMPUnByDPEI8vf35WFgTUvMKU7lhdLcDMpuriHOHrqpBfnxqcUFicmpeakl8d5BhgYGFgYmFkamTk6GxsSpAgCCOyiN</recordid><startdate>20080220</startdate><enddate>20080220</enddate><creator>KIM, JEONG TAEG</creator><creator>KO, YONG KEUN</creator><creator>SUK, CHANG KYUN</creator><scope>EVB</scope></search><sort><creationdate>20080220</creationdate><title>CONSTRUCTION METHOD USING DRY TYPE WALL FOR BATHROOM</title><author>KIM, JEONG TAEG ; KO, YONG KEUN ; SUK, CHANG KYUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_KR100804825BB13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2008</creationdate><topic>BUILDING</topic><topic>CEILINGS</topic><topic>FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>ROOFS</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>KIM, JEONG TAEG</creatorcontrib><creatorcontrib>KO, YONG KEUN</creatorcontrib><creatorcontrib>SUK, CHANG KYUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KIM, JEONG TAEG</au><au>KO, YONG KEUN</au><au>SUK, CHANG KYUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION METHOD USING DRY TYPE WALL FOR BATHROOM</title><date>2008-02-20</date><risdate>2008</risdate><abstract>A construction method of a dry wall for a bathroom is provided to make construction simple, to shorten a period of construction and to reduce the thickness of a wall in contrast to wet wall construction method. A construction method of a dry wall for a bathroom using an upper wall panel and a lower wall panel supported to a cement wall of a bathroom comprises the steps of: applying a waterproof material having a thickness of about 5mm on a cement wall(100) and installing a thermal insulating material(111); installing many height regulating member(150) on the bottom of a bathroom along one side of the cement wall using adhesives; putting and fixing a lower wall panel on the top of the height regulating member, and fixing the lower wall panel to the cement wall by many brackets(170); fixing upper and lower panel fixing brackets(180), for fixing two upper parts of a lower wall panel and two lower parts of an upper wall panel to a cement wall, to the cement wall while coupled to two upper parts of the lower wall panel; coupling two lower parts of an upper wall panel to the upper and lower panel fixing brackets fixed to the cement wall; and fixing the upper wall panel coupled by the upper and lower panel fixing brackets to the cement wall by many brackets. The upper and lower panel fixing bracket comprises a fixing plate(181) fixed to the cement wall by screws(190), and a fitting plate(182) provided with upper and lower grooves(183) extended downward and downward to couple hanging projection members of the upper wall panel and the lower wall panel.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_KR100804825BB1
source esp@cenet
subjects BUILDING
CEILINGS
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
FIXED CONSTRUCTIONS
FLOORS
GENERAL BUILDING CONSTRUCTIONS
INSULATION OR OTHER PROTECTION OF BUILDINGS
ROOFS
WALLS, e.g. PARTITIONS
title CONSTRUCTION METHOD USING DRY TYPE WALL FOR BATHROOM
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-05T10%3A26%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KIM,%20JEONG%20TAEG&rft.date=2008-02-20&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EKR100804825BB1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true