CONSTRUCTION METHOD FOR TOWER OF BRIDGE AND REVISE SYSTEM FOR LOCATION OF MOLD USED IN THE SAME

A construction method for a vertical structure of a bridge using a position compensation system is provided to construct a vertical structure of a bridge exactly using a simple method. A construction method for a vertical structure of a bridge comprises the steps of: installing a GPS receiver on a f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: AHN, SANG RO, LEE, YUN HYANG, YOON, JAH GEOL, JHUN, GUI HYUN, SHIN, JU YEOUL, LEE, JUNG SEOK, KIM, DO GYUN
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator AHN, SANG RO
LEE, YUN HYANG
YOON, JAH GEOL
JHUN, GUI HYUN
SHIN, JU YEOUL
LEE, JUNG SEOK
KIM, DO GYUN
description A construction method for a vertical structure of a bridge using a position compensation system is provided to construct a vertical structure of a bridge exactly using a simple method. A construction method for a vertical structure of a bridge comprises the steps of: installing a GPS receiver on a form to receive position information from a GPS satellite; after curing lower concrete, stripping off the form, ascending and installing temporarily; picking out the appropriate design coordinate data to the coordinates of the GPS received from the design coordinate data stored in the design coordinate database of the vertical structure; measuring the construction error of the temporarily installed form by comparing the picked targeted design coordinate data with the actual measured coordinate date inputted from the GPS receiver; and compensating the position of the form and placing concrete in the form, and then curing the concrete surface. A position compensation system for constructing a vertical structure of a bridge comprises: a communication unit installed to communicate with a GPS receiver by wire or wireless; a moving point coordinate database storing up the moving point coordinate data inputted from the GPS receiver using the communication unit; a design coordinate database composed of design coordinate data of the vertical structure; and a construction error data processing unit comparing the picked design coordinate data and the moving point coordinate data and operating the direction and distance of errors of the moving point coordinate data.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_KR100667030BB1</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>KR100667030BB1</sourcerecordid><originalsourceid>FETCH-epo_espacenet_KR100667030BB13</originalsourceid><addsrcrecordid>eNqNy7EKwjAQgOEuDqK-w4GzkFKoc5tcTLDJQXJVnEKROIkW6vtjKT6A0798_7pIknzk0Eu25MEhG1KgKQDTFQOQhjZYdUJovIKAFxsR4i0yukV1JJvlnKGjTkEfUYH1wGZ2jcNtsXoMzynvft0Ue40szSGP75SncbjnV_6kcyiFqOujqETbltV_6gv7ZjO0</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION METHOD FOR TOWER OF BRIDGE AND REVISE SYSTEM FOR LOCATION OF MOLD USED IN THE SAME</title><source>esp@cenet</source><creator>AHN, SANG RO ; LEE, YUN HYANG ; YOON, JAH GEOL ; JHUN, GUI HYUN ; SHIN, JU YEOUL ; LEE, JUNG SEOK ; KIM, DO GYUN</creator><creatorcontrib>AHN, SANG RO ; LEE, YUN HYANG ; YOON, JAH GEOL ; JHUN, GUI HYUN ; SHIN, JU YEOUL ; LEE, JUNG SEOK ; KIM, DO GYUN</creatorcontrib><description>A construction method for a vertical structure of a bridge using a position compensation system is provided to construct a vertical structure of a bridge exactly using a simple method. A construction method for a vertical structure of a bridge comprises the steps of: installing a GPS receiver on a form to receive position information from a GPS satellite; after curing lower concrete, stripping off the form, ascending and installing temporarily; picking out the appropriate design coordinate data to the coordinates of the GPS received from the design coordinate data stored in the design coordinate database of the vertical structure; measuring the construction error of the temporarily installed form by comparing the picked targeted design coordinate data with the actual measured coordinate date inputted from the GPS receiver; and compensating the position of the form and placing concrete in the form, and then curing the concrete surface. A position compensation system for constructing a vertical structure of a bridge comprises: a communication unit installed to communicate with a GPS receiver by wire or wireless; a moving point coordinate database storing up the moving point coordinate data inputted from the GPS receiver using the communication unit; a design coordinate database composed of design coordinate data of the vertical structure; and a construction error data processing unit comparing the picked design coordinate data and the moving point coordinate data and operating the direction and distance of errors of the moving point coordinate data.</description><language>eng</language><subject>ASSEMBLY OF BRIDGES ; CONSTRUCTION OF BRIDGES ; CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; FIXED CONSTRUCTIONS ; OR VIADUCTS</subject><creationdate>2007</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070112&amp;DB=EPODOC&amp;CC=KR&amp;NR=100667030B1$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76289</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=20070112&amp;DB=EPODOC&amp;CC=KR&amp;NR=100667030B1$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>AHN, SANG RO</creatorcontrib><creatorcontrib>LEE, YUN HYANG</creatorcontrib><creatorcontrib>YOON, JAH GEOL</creatorcontrib><creatorcontrib>JHUN, GUI HYUN</creatorcontrib><creatorcontrib>SHIN, JU YEOUL</creatorcontrib><creatorcontrib>LEE, JUNG SEOK</creatorcontrib><creatorcontrib>KIM, DO GYUN</creatorcontrib><title>CONSTRUCTION METHOD FOR TOWER OF BRIDGE AND REVISE SYSTEM FOR LOCATION OF MOLD USED IN THE SAME</title><description>A construction method for a vertical structure of a bridge using a position compensation system is provided to construct a vertical structure of a bridge exactly using a simple method. A construction method for a vertical structure of a bridge comprises the steps of: installing a GPS receiver on a form to receive position information from a GPS satellite; after curing lower concrete, stripping off the form, ascending and installing temporarily; picking out the appropriate design coordinate data to the coordinates of the GPS received from the design coordinate data stored in the design coordinate database of the vertical structure; measuring the construction error of the temporarily installed form by comparing the picked targeted design coordinate data with the actual measured coordinate date inputted from the GPS receiver; and compensating the position of the form and placing concrete in the form, and then curing the concrete surface. A position compensation system for constructing a vertical structure of a bridge comprises: a communication unit installed to communicate with a GPS receiver by wire or wireless; a moving point coordinate database storing up the moving point coordinate data inputted from the GPS receiver using the communication unit; a design coordinate database composed of design coordinate data of the vertical structure; and a construction error data processing unit comparing the picked design coordinate data and the moving point coordinate data and operating the direction and distance of errors of the moving point coordinate data.</description><subject>ASSEMBLY OF BRIDGES</subject><subject>CONSTRUCTION OF BRIDGES</subject><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>FIXED CONSTRUCTIONS</subject><subject>OR VIADUCTS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>2007</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNqNy7EKwjAQgOEuDqK-w4GzkFKoc5tcTLDJQXJVnEKROIkW6vtjKT6A0798_7pIknzk0Eu25MEhG1KgKQDTFQOQhjZYdUJovIKAFxsR4i0yukV1JJvlnKGjTkEfUYH1wGZ2jcNtsXoMzynvft0Ue40szSGP75SncbjnV_6kcyiFqOujqETbltV_6gv7ZjO0</recordid><startdate>20070112</startdate><enddate>20070112</enddate><creator>AHN, SANG RO</creator><creator>LEE, YUN HYANG</creator><creator>YOON, JAH GEOL</creator><creator>JHUN, GUI HYUN</creator><creator>SHIN, JU YEOUL</creator><creator>LEE, JUNG SEOK</creator><creator>KIM, DO GYUN</creator><scope>EVB</scope></search><sort><creationdate>20070112</creationdate><title>CONSTRUCTION METHOD FOR TOWER OF BRIDGE AND REVISE SYSTEM FOR LOCATION OF MOLD USED IN THE SAME</title><author>AHN, SANG RO ; LEE, YUN HYANG ; YOON, JAH GEOL ; JHUN, GUI HYUN ; SHIN, JU YEOUL ; LEE, JUNG SEOK ; KIM, DO GYUN</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_KR100667030BB13</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>2007</creationdate><topic>ASSEMBLY OF BRIDGES</topic><topic>CONSTRUCTION OF BRIDGES</topic><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>FIXED CONSTRUCTIONS</topic><topic>OR VIADUCTS</topic><toplevel>online_resources</toplevel><creatorcontrib>AHN, SANG RO</creatorcontrib><creatorcontrib>LEE, YUN HYANG</creatorcontrib><creatorcontrib>YOON, JAH GEOL</creatorcontrib><creatorcontrib>JHUN, GUI HYUN</creatorcontrib><creatorcontrib>SHIN, JU YEOUL</creatorcontrib><creatorcontrib>LEE, JUNG SEOK</creatorcontrib><creatorcontrib>KIM, DO GYUN</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>AHN, SANG RO</au><au>LEE, YUN HYANG</au><au>YOON, JAH GEOL</au><au>JHUN, GUI HYUN</au><au>SHIN, JU YEOUL</au><au>LEE, JUNG SEOK</au><au>KIM, DO GYUN</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION METHOD FOR TOWER OF BRIDGE AND REVISE SYSTEM FOR LOCATION OF MOLD USED IN THE SAME</title><date>2007-01-12</date><risdate>2007</risdate><abstract>A construction method for a vertical structure of a bridge using a position compensation system is provided to construct a vertical structure of a bridge exactly using a simple method. A construction method for a vertical structure of a bridge comprises the steps of: installing a GPS receiver on a form to receive position information from a GPS satellite; after curing lower concrete, stripping off the form, ascending and installing temporarily; picking out the appropriate design coordinate data to the coordinates of the GPS received from the design coordinate data stored in the design coordinate database of the vertical structure; measuring the construction error of the temporarily installed form by comparing the picked targeted design coordinate data with the actual measured coordinate date inputted from the GPS receiver; and compensating the position of the form and placing concrete in the form, and then curing the concrete surface. A position compensation system for constructing a vertical structure of a bridge comprises: a communication unit installed to communicate with a GPS receiver by wire or wireless; a moving point coordinate database storing up the moving point coordinate data inputted from the GPS receiver using the communication unit; a design coordinate database composed of design coordinate data of the vertical structure; and a construction error data processing unit comparing the picked design coordinate data and the moving point coordinate data and operating the direction and distance of errors of the moving point coordinate data.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_KR100667030BB1
source esp@cenet
subjects ASSEMBLY OF BRIDGES
CONSTRUCTION OF BRIDGES
CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
FIXED CONSTRUCTIONS
OR VIADUCTS
title CONSTRUCTION METHOD FOR TOWER OF BRIDGE AND REVISE SYSTEM FOR LOCATION OF MOLD USED IN THE SAME
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-06T15%3A04%3A50IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=AHN,%20SANG%20RO&rft.date=2007-01-12&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EKR100667030BB1%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true