SCOURING PREVENTION WORK FOR CAISSON FOUNDATION
PURPOSE:To prevent the occurrence of scouring during the settling period of caisson by a method in which a caisson with cutting edge is settled along a sheet laid on the bottom under water for preventing scouring, and the sheet is cut off and removed according to the progress of work. CONSTITUTION:P...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | OOTA WATARU HASEGAWA KEIICHI |
description | PURPOSE:To prevent the occurrence of scouring during the settling period of caisson by a method in which a caisson with cutting edge is settled along a sheet laid on the bottom under water for preventing scouring, and the sheet is cut off and removed according to the progress of work. CONSTITUTION:Plural sheets 8 having bags 2 incorporated with weights 3 on its both ends for preventing scouring are adjacently laid by lapping the edges of the sheets 8 on the bottom 4 on which a caisson 5 is to be settled under water. The caisson 5 is settled on the sheets 8 and the inside sheet 1 of the sheets 8 is cut off along its lower end 5b by the cutting edge 6. The sheet 1 is removed, together with the weight 3, from the cutting edge 6. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPS626011A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPS626011A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPS626011A3</originalsourceid><addsrcrecordid>eNrjZNAPdvYPDfL0c1cICHINc_UL8fT3Uwj3D_JWcPMPUnB29AwOBgq4-Yf6uTiC5HgYWNMSc4pTeaE0N4O8m2uIs4duakF-fGpxQWJyal5qSbxXQLCZkZmBoaGjMWEVAKZ4Jc8</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SCOURING PREVENTION WORK FOR CAISSON FOUNDATION</title><source>esp@cenet</source><creator>OOTA WATARU ; HASEGAWA KEIICHI</creator><creatorcontrib>OOTA WATARU ; HASEGAWA KEIICHI</creatorcontrib><description>PURPOSE:To prevent the occurrence of scouring during the settling period of caisson by a method in which a caisson with cutting edge is settled along a sheet laid on the bottom under water for preventing scouring, and the sheet is cut off and removed according to the progress of work. CONSTITUTION:Plural sheets 8 having bags 2 incorporated with weights 3 on its both ends for preventing scouring are adjacently laid by lapping the edges of the sheets 8 on the bottom 4 on which a caisson 5 is to be settled under water. The caisson 5 is settled on the sheets 8 and the inside sheet 1 of the sheets 8 is cut off along its lower end 5b by the cutting edge 6. The sheet 1 is removed, together with the weight 3, from the cutting edge 6.</description><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1987</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19870113&DB=EPODOC&CC=JP&NR=S626011A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19870113&DB=EPODOC&CC=JP&NR=S626011A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>OOTA WATARU</creatorcontrib><creatorcontrib>HASEGAWA KEIICHI</creatorcontrib><title>SCOURING PREVENTION WORK FOR CAISSON FOUNDATION</title><description>PURPOSE:To prevent the occurrence of scouring during the settling period of caisson by a method in which a caisson with cutting edge is settled along a sheet laid on the bottom under water for preventing scouring, and the sheet is cut off and removed according to the progress of work. CONSTITUTION:Plural sheets 8 having bags 2 incorporated with weights 3 on its both ends for preventing scouring are adjacently laid by lapping the edges of the sheets 8 on the bottom 4 on which a caisson 5 is to be settled under water. The caisson 5 is settled on the sheets 8 and the inside sheet 1 of the sheets 8 is cut off along its lower end 5b by the cutting edge 6. The sheet 1 is removed, together with the weight 3, from the cutting edge 6.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1987</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNAPdvYPDfL0c1cICHINc_UL8fT3Uwj3D_JWcPMPUnB29AwOBgq4-Yf6uTiC5HgYWNMSc4pTeaE0N4O8m2uIs4duakF-fGpxQWJyal5qSbxXQLCZkZmBoaGjMWEVAKZ4Jc8</recordid><startdate>19870113</startdate><enddate>19870113</enddate><creator>OOTA WATARU</creator><creator>HASEGAWA KEIICHI</creator><scope>EVB</scope></search><sort><creationdate>19870113</creationdate><title>SCOURING PREVENTION WORK FOR CAISSON FOUNDATION</title><author>OOTA WATARU ; HASEGAWA KEIICHI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPS626011A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1987</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>OOTA WATARU</creatorcontrib><creatorcontrib>HASEGAWA KEIICHI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>OOTA WATARU</au><au>HASEGAWA KEIICHI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SCOURING PREVENTION WORK FOR CAISSON FOUNDATION</title><date>1987-01-13</date><risdate>1987</risdate><abstract>PURPOSE:To prevent the occurrence of scouring during the settling period of caisson by a method in which a caisson with cutting edge is settled along a sheet laid on the bottom under water for preventing scouring, and the sheet is cut off and removed according to the progress of work. CONSTITUTION:Plural sheets 8 having bags 2 incorporated with weights 3 on its both ends for preventing scouring are adjacently laid by lapping the edges of the sheets 8 on the bottom 4 on which a caisson 5 is to be settled under water. The caisson 5 is settled on the sheets 8 and the inside sheet 1 of the sheets 8 is cut off along its lower end 5b by the cutting edge 6. The sheet 1 is removed, together with the weight 3, from the cutting edge 6.</abstract><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JPS626011A |
source | esp@cenet |
subjects | EMBANKMENTS EXCAVATIONS FIXED CONSTRUCTIONS FOUNDATIONS HYDRAULIC ENGINEERING SOIL SHIFTING UNDERGROUND OR UNDERWATER STRUCTURES |
title | SCOURING PREVENTION WORK FOR CAISSON FOUNDATION |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-03T14%3A44%3A08IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=OOTA%20WATARU&rft.date=1987-01-13&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPS626011A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |