CONSTRUCTING METHOD OF GROUND IMPROVEMENT

PURPOSE:To reduce the cost of construction, by a method wherein a suction apparatus for penetrating soft surface soil layer to intermediate superior layer is provided and superior layer earth is suck up at an overload section via the suction apparatus and surface soil layer is covered with the super...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TSUTSUMI KEIJIROU, SUGIYAMA SADAO, FUJISAKI TATATOMI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TSUTSUMI KEIJIROU
SUGIYAMA SADAO
FUJISAKI TATATOMI
description PURPOSE:To reduce the cost of construction, by a method wherein a suction apparatus for penetrating soft surface soil layer to intermediate superior layer is provided and superior layer earth is suck up at an overload section via the suction apparatus and surface soil layer is covered with the superior layer earth. CONSTITUTION:A slot through soft surface soil 1 to intermediate superior layer 2 is bored, and a feed and suction pipe 4 is inserted into a bored slot 3. Then, the superior earth 6 for the superior layer 2 is suck up at an overland section via a pump 5, and the surface soil layer 1 is covered with the superior earth 6 via the feed and suction pipe 4, a belt conveyor, a dump truck, or the like, and the surface soil layer 1 is replaced with the superior earth 6.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPS6121218A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPS6121218A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPS6121218A3</originalsourceid><addsrcrecordid>eNrjZNB09vcLDgkKdQ7x9HNX8HUN8fB3UfB3U3AP8g_1c1Hw9A0I8g9z9XX1C-FhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfFeAcFmhkZAaOFoTIQSABGuJI4</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTING METHOD OF GROUND IMPROVEMENT</title><source>esp@cenet</source><creator>TSUTSUMI KEIJIROU ; SUGIYAMA SADAO ; FUJISAKI TATATOMI</creator><creatorcontrib>TSUTSUMI KEIJIROU ; SUGIYAMA SADAO ; FUJISAKI TATATOMI</creatorcontrib><description>PURPOSE:To reduce the cost of construction, by a method wherein a suction apparatus for penetrating soft surface soil layer to intermediate superior layer is provided and superior layer earth is suck up at an overload section via the suction apparatus and surface soil layer is covered with the superior layer earth. CONSTITUTION:A slot through soft surface soil 1 to intermediate superior layer 2 is bored, and a feed and suction pipe 4 is inserted into a bored slot 3. Then, the superior earth 6 for the superior layer 2 is suck up at an overland section via a pump 5, and the surface soil layer 1 is covered with the superior earth 6 via the feed and suction pipe 4, a belt conveyor, a dump truck, or the like, and the surface soil layer 1 is replaced with the superior earth 6.</description><edition>4</edition><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1986</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19860129&amp;DB=EPODOC&amp;CC=JP&amp;NR=S6121218A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19860129&amp;DB=EPODOC&amp;CC=JP&amp;NR=S6121218A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TSUTSUMI KEIJIROU</creatorcontrib><creatorcontrib>SUGIYAMA SADAO</creatorcontrib><creatorcontrib>FUJISAKI TATATOMI</creatorcontrib><title>CONSTRUCTING METHOD OF GROUND IMPROVEMENT</title><description>PURPOSE:To reduce the cost of construction, by a method wherein a suction apparatus for penetrating soft surface soil layer to intermediate superior layer is provided and superior layer earth is suck up at an overload section via the suction apparatus and surface soil layer is covered with the superior layer earth. CONSTITUTION:A slot through soft surface soil 1 to intermediate superior layer 2 is bored, and a feed and suction pipe 4 is inserted into a bored slot 3. Then, the superior earth 6 for the superior layer 2 is suck up at an overland section via a pump 5, and the surface soil layer 1 is covered with the superior earth 6 via the feed and suction pipe 4, a belt conveyor, a dump truck, or the like, and the surface soil layer 1 is replaced with the superior earth 6.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1986</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNB09vcLDgkKdQ7x9HNX8HUN8fB3UfB3U3AP8g_1c1Hw9A0I8g9z9XX1C-FhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfFeAcFmhkZAaOFoTIQSABGuJI4</recordid><startdate>19860129</startdate><enddate>19860129</enddate><creator>TSUTSUMI KEIJIROU</creator><creator>SUGIYAMA SADAO</creator><creator>FUJISAKI TATATOMI</creator><scope>EVB</scope></search><sort><creationdate>19860129</creationdate><title>CONSTRUCTING METHOD OF GROUND IMPROVEMENT</title><author>TSUTSUMI KEIJIROU ; SUGIYAMA SADAO ; FUJISAKI TATATOMI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPS6121218A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1986</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>TSUTSUMI KEIJIROU</creatorcontrib><creatorcontrib>SUGIYAMA SADAO</creatorcontrib><creatorcontrib>FUJISAKI TATATOMI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TSUTSUMI KEIJIROU</au><au>SUGIYAMA SADAO</au><au>FUJISAKI TATATOMI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTING METHOD OF GROUND IMPROVEMENT</title><date>1986-01-29</date><risdate>1986</risdate><abstract>PURPOSE:To reduce the cost of construction, by a method wherein a suction apparatus for penetrating soft surface soil layer to intermediate superior layer is provided and superior layer earth is suck up at an overload section via the suction apparatus and surface soil layer is covered with the superior layer earth. CONSTITUTION:A slot through soft surface soil 1 to intermediate superior layer 2 is bored, and a feed and suction pipe 4 is inserted into a bored slot 3. Then, the superior earth 6 for the superior layer 2 is suck up at an overland section via a pump 5, and the surface soil layer 1 is covered with the superior earth 6 via the feed and suction pipe 4, a belt conveyor, a dump truck, or the like, and the surface soil layer 1 is replaced with the superior earth 6.</abstract><edition>4</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPS6121218A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title CONSTRUCTING METHOD OF GROUND IMPROVEMENT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-24T20%3A58%3A58IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TSUTSUMI%20KEIJIROU&rft.date=1986-01-29&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPS6121218A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true