WATER CUT-OFF WORK FOR INNER SURFACE OF HOLE EXCAVATED UNDER GROUND

PURPOSE:To easily obtain a dangerless treating or depository place by connecting an inorganic water-proof layer coated on the surface of cement mortar layer on the hole side and a water-tight synthetic resin sheet provided on said inorganic water-proof layer by using a synthetic resin laminate. CONS...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: TAGUCHI TOORU, NAKADA HIROSHI, WAKI YOSHIO, NARABE GANJI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TAGUCHI TOORU
NAKADA HIROSHI
WAKI YOSHIO
NARABE GANJI
description PURPOSE:To easily obtain a dangerless treating or depository place by connecting an inorganic water-proof layer coated on the surface of cement mortar layer on the hole side and a water-tight synthetic resin sheet provided on said inorganic water-proof layer by using a synthetic resin laminate. CONSTITUTION:A cement mortar layer 3 is formed on the side 2 of a hole 1 excavated under the ground, and an inorganic water-proof layer 7 is provided on the surface of the cement mortar layer 3. A synthetic resin laminate 6 both sides of which are laminated with nonwoven cloths is bonded to a proper place in the water-proof layer 7, and the bottom of the hole 1 and the water-proof layer 7 close to the bottom and the laminate 6 are covered with a water-tight synthetic resin sheet 5' in such a way as to connect the sheet 5' and the water-proof layer 7 with the laminate 6. In this case, before the water-proof layer 7 coated and bonded is hardened, the laminate layer 6 is pressed, the nonwoven cloth on one side of the laminate 6 is integrated with the water- proof layer 7, and then the water-proof layer is hardened. Afterwards, the nonwoven cloth on the other side and the sheet 5' are fixed with hot melt bonding, etc. The sheet 5' can thus be easily and strongly fixed to the side of the cement mortar reinforced.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPS598816A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPS598816A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPS598816A3</originalsourceid><addsrcrecordid>eNrjZHAOdwxxDVJwDg3R9XdzUwj3D_JWcPMPUvD08wMKB4cGuTk6uyr4uyl4-Pu4KrhGODuGATW4KIT6uQDl3YP8gQweBta0xJziVF4ozc0g7-Ya4uyhm1qQH59aXJCYnJqXWhLvFRBsamlhYWjmaExYBQBtFyrN</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>WATER CUT-OFF WORK FOR INNER SURFACE OF HOLE EXCAVATED UNDER GROUND</title><source>esp@cenet</source><creator>TAGUCHI TOORU ; NAKADA HIROSHI ; WAKI YOSHIO ; NARABE GANJI</creator><creatorcontrib>TAGUCHI TOORU ; NAKADA HIROSHI ; WAKI YOSHIO ; NARABE GANJI</creatorcontrib><description>PURPOSE:To easily obtain a dangerless treating or depository place by connecting an inorganic water-proof layer coated on the surface of cement mortar layer on the hole side and a water-tight synthetic resin sheet provided on said inorganic water-proof layer by using a synthetic resin laminate. CONSTITUTION:A cement mortar layer 3 is formed on the side 2 of a hole 1 excavated under the ground, and an inorganic water-proof layer 7 is provided on the surface of the cement mortar layer 3. A synthetic resin laminate 6 both sides of which are laminated with nonwoven cloths is bonded to a proper place in the water-proof layer 7, and the bottom of the hole 1 and the water-proof layer 7 close to the bottom and the laminate 6 are covered with a water-tight synthetic resin sheet 5' in such a way as to connect the sheet 5' and the water-proof layer 7 with the laminate 6. In this case, before the water-proof layer 7 coated and bonded is hardened, the laminate layer 6 is pressed, the nonwoven cloth on one side of the laminate 6 is integrated with the water- proof layer 7, and then the water-proof layer is hardened. Afterwards, the nonwoven cloth on the other side and the sheet 5' are fixed with hot melt bonding, etc. The sheet 5' can thus be easily and strongly fixed to the side of the cement mortar reinforced.</description><language>eng</language><subject>DISPOSAL OF SOLID WASTE ; EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; PERFORMING OPERATIONS ; RECLAMATION OF CONTAMINED SOIL SOIL ; SOIL SHIFTING ; TRANSPORTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1984</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19840118&amp;DB=EPODOC&amp;CC=JP&amp;NR=S598816A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19840118&amp;DB=EPODOC&amp;CC=JP&amp;NR=S598816A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TAGUCHI TOORU</creatorcontrib><creatorcontrib>NAKADA HIROSHI</creatorcontrib><creatorcontrib>WAKI YOSHIO</creatorcontrib><creatorcontrib>NARABE GANJI</creatorcontrib><title>WATER CUT-OFF WORK FOR INNER SURFACE OF HOLE EXCAVATED UNDER GROUND</title><description>PURPOSE:To easily obtain a dangerless treating or depository place by connecting an inorganic water-proof layer coated on the surface of cement mortar layer on the hole side and a water-tight synthetic resin sheet provided on said inorganic water-proof layer by using a synthetic resin laminate. CONSTITUTION:A cement mortar layer 3 is formed on the side 2 of a hole 1 excavated under the ground, and an inorganic water-proof layer 7 is provided on the surface of the cement mortar layer 3. A synthetic resin laminate 6 both sides of which are laminated with nonwoven cloths is bonded to a proper place in the water-proof layer 7, and the bottom of the hole 1 and the water-proof layer 7 close to the bottom and the laminate 6 are covered with a water-tight synthetic resin sheet 5' in such a way as to connect the sheet 5' and the water-proof layer 7 with the laminate 6. In this case, before the water-proof layer 7 coated and bonded is hardened, the laminate layer 6 is pressed, the nonwoven cloth on one side of the laminate 6 is integrated with the water- proof layer 7, and then the water-proof layer is hardened. Afterwards, the nonwoven cloth on the other side and the sheet 5' are fixed with hot melt bonding, etc. The sheet 5' can thus be easily and strongly fixed to the side of the cement mortar reinforced.</description><subject>DISPOSAL OF SOLID WASTE</subject><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>PERFORMING OPERATIONS</subject><subject>RECLAMATION OF CONTAMINED SOIL SOIL</subject><subject>SOIL SHIFTING</subject><subject>TRANSPORTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1984</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZHAOdwxxDVJwDg3R9XdzUwj3D_JWcPMPUvD08wMKB4cGuTk6uyr4uyl4-Pu4KrhGODuGATW4KIT6uQDl3YP8gQweBta0xJziVF4ozc0g7-Ya4uyhm1qQH59aXJCYnJqXWhLvFRBsamlhYWjmaExYBQBtFyrN</recordid><startdate>19840118</startdate><enddate>19840118</enddate><creator>TAGUCHI TOORU</creator><creator>NAKADA HIROSHI</creator><creator>WAKI YOSHIO</creator><creator>NARABE GANJI</creator><scope>EVB</scope></search><sort><creationdate>19840118</creationdate><title>WATER CUT-OFF WORK FOR INNER SURFACE OF HOLE EXCAVATED UNDER GROUND</title><author>TAGUCHI TOORU ; NAKADA HIROSHI ; WAKI YOSHIO ; NARABE GANJI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPS598816A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1984</creationdate><topic>DISPOSAL OF SOLID WASTE</topic><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>PERFORMING OPERATIONS</topic><topic>RECLAMATION OF CONTAMINED SOIL SOIL</topic><topic>SOIL SHIFTING</topic><topic>TRANSPORTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>TAGUCHI TOORU</creatorcontrib><creatorcontrib>NAKADA HIROSHI</creatorcontrib><creatorcontrib>WAKI YOSHIO</creatorcontrib><creatorcontrib>NARABE GANJI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TAGUCHI TOORU</au><au>NAKADA HIROSHI</au><au>WAKI YOSHIO</au><au>NARABE GANJI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>WATER CUT-OFF WORK FOR INNER SURFACE OF HOLE EXCAVATED UNDER GROUND</title><date>1984-01-18</date><risdate>1984</risdate><abstract>PURPOSE:To easily obtain a dangerless treating or depository place by connecting an inorganic water-proof layer coated on the surface of cement mortar layer on the hole side and a water-tight synthetic resin sheet provided on said inorganic water-proof layer by using a synthetic resin laminate. CONSTITUTION:A cement mortar layer 3 is formed on the side 2 of a hole 1 excavated under the ground, and an inorganic water-proof layer 7 is provided on the surface of the cement mortar layer 3. A synthetic resin laminate 6 both sides of which are laminated with nonwoven cloths is bonded to a proper place in the water-proof layer 7, and the bottom of the hole 1 and the water-proof layer 7 close to the bottom and the laminate 6 are covered with a water-tight synthetic resin sheet 5' in such a way as to connect the sheet 5' and the water-proof layer 7 with the laminate 6. In this case, before the water-proof layer 7 coated and bonded is hardened, the laminate layer 6 is pressed, the nonwoven cloth on one side of the laminate 6 is integrated with the water- proof layer 7, and then the water-proof layer is hardened. Afterwards, the nonwoven cloth on the other side and the sheet 5' are fixed with hot melt bonding, etc. The sheet 5' can thus be easily and strongly fixed to the side of the cement mortar reinforced.</abstract><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPS598816A
source esp@cenet
subjects DISPOSAL OF SOLID WASTE
EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
PERFORMING OPERATIONS
RECLAMATION OF CONTAMINED SOIL SOIL
SOIL SHIFTING
TRANSPORTING
UNDERGROUND OR UNDERWATER STRUCTURES
title WATER CUT-OFF WORK FOR INNER SURFACE OF HOLE EXCAVATED UNDER GROUND
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T02%3A39%3A26IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TAGUCHI%20TOORU&rft.date=1984-01-18&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPS598816A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true