INTEGRATION WORK OF PILE OR CONTINUOUS WALL AND FOOTING
PURPOSE:To prevent the reduction of prestress by a method in which the end of a steel material is projected from a footing, the steel material is tensed by using a fixing tool to introduce prestress force into the steel material, and a pile or continuous wall and the footing are integrated. CONSTITU...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!