TEST-MANAGING EQUIPMENT FOR POWER SYSTEM MONITOR AND CONTROLLER, AND RECORDING MEDIUM WITH PROGRAM RECORDED THEREOF
PROBLEM TO BE SOLVED: To eliminate writing of program in a medium, transportation of the medium, and installation of software from the medium, when conducting factory tests after shipment or on-site tests after a Revision (updating). SOLUTION: A network system is constituted of at least one power sy...
Gespeichert in:
Hauptverfasser: | , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!