BACKSTAY
PROBLEM TO BE SOLVED: To provide a backstay easy in the construction and removal and having a high strength to shorten the construction period and to reduce the construction cost of an arch bridge. SOLUTION: This backstay is provided with a form 8 composed of a sheathing board 9 inclinedly bridged b...
Gespeichert in:
Hauptverfasser: | , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!