BUILDING GROUP MANAGEMENT SYSTEM
PROBLEM TO BE SOLVED: To provide a building group management system where two monitor centers can automatically grasp respective monitor times of error data. SOLUTION: The system is provided with a remote monitor 1 that detects a fault of installed devices of a building and a 1st monitor center 3 co...
Gespeichert in:
Hauptverfasser: | , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | NANBA YASUYUKI KAWANISHI SEIJI |
description | PROBLEM TO BE SOLVED: To provide a building group management system where two monitor centers can automatically grasp respective monitor times of error data. SOLUTION: The system is provided with a remote monitor 1 that detects a fault of installed devices of a building and a 1st monitor center 3 connecting to the remote monitor 1 via a telephone line 2. The 1st monitor center 3 is provided with a CPU 5 having a storage section, a monitor time collection section 7 that receives a monitor state of a fault signal from the CPU 5, and a monitor time display section 10 that displays the monitor times collected by the monitor time collection section 7. The 1st monitor center 3 is provided with a 2nd monitor center 12 connecting thereto by a 2nd telephone line 11. The 2nd monitor center 12 is provided with a CPU 14 having a storage section, a monitor time collection section 16 that receives a monitor state of a fault signal from the CPU 14, and a monitor time display section 17 that displays the monitor time collected by the monitor time collection section 16. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH11317992A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH11317992A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH11317992A3</originalsourceid><addsrcrecordid>eNrjZFBwCvX0cfH0c1dwD_IPDVDwdfRzdHf1dfULUQiODA5x9eVhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfFeAR6GhsaG5paWRo7GxKgBAAhYIkg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>BUILDING GROUP MANAGEMENT SYSTEM</title><source>esp@cenet</source><creator>NANBA YASUYUKI ; KAWANISHI SEIJI</creator><creatorcontrib>NANBA YASUYUKI ; KAWANISHI SEIJI</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a building group management system where two monitor centers can automatically grasp respective monitor times of error data. SOLUTION: The system is provided with a remote monitor 1 that detects a fault of installed devices of a building and a 1st monitor center 3 connecting to the remote monitor 1 via a telephone line 2. The 1st monitor center 3 is provided with a CPU 5 having a storage section, a monitor time collection section 7 that receives a monitor state of a fault signal from the CPU 5, and a monitor time display section 10 that displays the monitor times collected by the monitor time collection section 7. The 1st monitor center 3 is provided with a 2nd monitor center 12 connecting thereto by a 2nd telephone line 11. The 2nd monitor center 12 is provided with a CPU 14 having a storage section, a monitor time collection section 16 that receives a monitor state of a fault signal from the CPU 14, and a monitor time display section 17 that displays the monitor time collected by the monitor time collection section 16.</description><edition>6</edition><language>eng</language><subject>ALARM SYSTEMS ; ELECTRIC COMMUNICATION TECHNIQUE ; ELECTRICITY ; ORDER TELEGRAPHS ; PHYSICS ; SELECTING ; SIGNALLING ; SIGNALLING OR CALLING SYSTEMS ; TELEPHONIC COMMUNICATION</subject><creationdate>1999</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19991116&DB=EPODOC&CC=JP&NR=H11317992A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19991116&DB=EPODOC&CC=JP&NR=H11317992A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>NANBA YASUYUKI</creatorcontrib><creatorcontrib>KAWANISHI SEIJI</creatorcontrib><title>BUILDING GROUP MANAGEMENT SYSTEM</title><description>PROBLEM TO BE SOLVED: To provide a building group management system where two monitor centers can automatically grasp respective monitor times of error data. SOLUTION: The system is provided with a remote monitor 1 that detects a fault of installed devices of a building and a 1st monitor center 3 connecting to the remote monitor 1 via a telephone line 2. The 1st monitor center 3 is provided with a CPU 5 having a storage section, a monitor time collection section 7 that receives a monitor state of a fault signal from the CPU 5, and a monitor time display section 10 that displays the monitor times collected by the monitor time collection section 7. The 1st monitor center 3 is provided with a 2nd monitor center 12 connecting thereto by a 2nd telephone line 11. The 2nd monitor center 12 is provided with a CPU 14 having a storage section, a monitor time collection section 16 that receives a monitor state of a fault signal from the CPU 14, and a monitor time display section 17 that displays the monitor time collected by the monitor time collection section 16.</description><subject>ALARM SYSTEMS</subject><subject>ELECTRIC COMMUNICATION TECHNIQUE</subject><subject>ELECTRICITY</subject><subject>ORDER TELEGRAPHS</subject><subject>PHYSICS</subject><subject>SELECTING</subject><subject>SIGNALLING</subject><subject>SIGNALLING OR CALLING SYSTEMS</subject><subject>TELEPHONIC COMMUNICATION</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1999</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFBwCvX0cfH0c1dwD_IPDVDwdfRzdHf1dfULUQiODA5x9eVhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfFeAR6GhsaG5paWRo7GxKgBAAhYIkg</recordid><startdate>19991116</startdate><enddate>19991116</enddate><creator>NANBA YASUYUKI</creator><creator>KAWANISHI SEIJI</creator><scope>EVB</scope></search><sort><creationdate>19991116</creationdate><title>BUILDING GROUP MANAGEMENT SYSTEM</title><author>NANBA YASUYUKI ; KAWANISHI SEIJI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH11317992A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1999</creationdate><topic>ALARM SYSTEMS</topic><topic>ELECTRIC COMMUNICATION TECHNIQUE</topic><topic>ELECTRICITY</topic><topic>ORDER TELEGRAPHS</topic><topic>PHYSICS</topic><topic>SELECTING</topic><topic>SIGNALLING</topic><topic>SIGNALLING OR CALLING SYSTEMS</topic><topic>TELEPHONIC COMMUNICATION</topic><toplevel>online_resources</toplevel><creatorcontrib>NANBA YASUYUKI</creatorcontrib><creatorcontrib>KAWANISHI SEIJI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>NANBA YASUYUKI</au><au>KAWANISHI SEIJI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>BUILDING GROUP MANAGEMENT SYSTEM</title><date>1999-11-16</date><risdate>1999</risdate><abstract>PROBLEM TO BE SOLVED: To provide a building group management system where two monitor centers can automatically grasp respective monitor times of error data. SOLUTION: The system is provided with a remote monitor 1 that detects a fault of installed devices of a building and a 1st monitor center 3 connecting to the remote monitor 1 via a telephone line 2. The 1st monitor center 3 is provided with a CPU 5 having a storage section, a monitor time collection section 7 that receives a monitor state of a fault signal from the CPU 5, and a monitor time display section 10 that displays the monitor times collected by the monitor time collection section 7. The 1st monitor center 3 is provided with a 2nd monitor center 12 connecting thereto by a 2nd telephone line 11. The 2nd monitor center 12 is provided with a CPU 14 having a storage section, a monitor time collection section 16 that receives a monitor state of a fault signal from the CPU 14, and a monitor time display section 17 that displays the monitor time collected by the monitor time collection section 16.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JPH11317992A |
source | esp@cenet |
subjects | ALARM SYSTEMS ELECTRIC COMMUNICATION TECHNIQUE ELECTRICITY ORDER TELEGRAPHS PHYSICS SELECTING SIGNALLING SIGNALLING OR CALLING SYSTEMS TELEPHONIC COMMUNICATION |
title | BUILDING GROUP MANAGEMENT SYSTEM |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-29T20%3A15%3A15IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=NANBA%20YASUYUKI&rft.date=1999-11-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH11317992A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |