LABOR-SAVING TRACK STRUCTURE ON SOIL STRUCTURE, AND SETTLEMENT REPAIR METHOD OF LABOR-SAVING TRACK ON SOIL STRUCTURE
PROBLEM TO BE SOLVED: To provide labor-saving track structure on a soil structure and the settlement repair method of labor-saving track on the soil structure, in which settlement can be repaired by easy following at low cost when settlement is generated in the soil structure. SOLUTION: The labor-sa...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!