SYSTEM FOR EASILY CALCULATING PRODUCTION SCHEDULE

PROBLEM TO BE SOLVED: To provide a system for easily calculating a production schedule which any variation due to an individual difference or the presence or absence of an experience can be prevented, and any high level technical knowledge such as the introduction or time-sequential analysis of a sh...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: KUDO KAORU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KUDO KAORU
description PROBLEM TO BE SOLVED: To provide a system for easily calculating a production schedule which any variation due to an individual difference or the presence or absence of an experience can be prevented, and any high level technical knowledge such as the introduction or time-sequential analysis of a shipping prediction system can be unnecessitated. SOLUTION: This system for easily calculating a production schedule is provided with a result data receiving means 11 for receiving the shipping high result of a latest month from a host computer 2 or the like, result data updating means 12 for updating the shipping high result data for the past prescribed months based on the received data, future data predicting means 13 for operating the shipping high prediction for further prescribed months by a time- sequential analytic method based on the shipping high result data, production schedule parameter updating means 15 for setting and updating a parameter such as a customer made product ratio or a term end reference stock rate, production schedule establishing means 14 for establishing a production schedule from the further shipping rate prediction and the parameter set by the production schedule parameter updating means 15, and file system 16 for filing each data.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH11203361A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH11203361A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH11203361A3</originalsourceid><addsrcrecordid>eNrjZDAMjgwOcfVVcPMPUnB1DPb0iVRwdvRxDvVxDPH0c1cICPJ3CXUO8fT3Uwh29nB1CfVx5WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8V4BHoaGRgbGxmaGjsbEqAEAcbEm6g</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SYSTEM FOR EASILY CALCULATING PRODUCTION SCHEDULE</title><source>esp@cenet</source><creator>KUDO KAORU</creator><creatorcontrib>KUDO KAORU</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a system for easily calculating a production schedule which any variation due to an individual difference or the presence or absence of an experience can be prevented, and any high level technical knowledge such as the introduction or time-sequential analysis of a shipping prediction system can be unnecessitated. SOLUTION: This system for easily calculating a production schedule is provided with a result data receiving means 11 for receiving the shipping high result of a latest month from a host computer 2 or the like, result data updating means 12 for updating the shipping high result data for the past prescribed months based on the received data, future data predicting means 13 for operating the shipping high prediction for further prescribed months by a time- sequential analytic method based on the shipping high result data, production schedule parameter updating means 15 for setting and updating a parameter such as a customer made product ratio or a term end reference stock rate, production schedule establishing means 14 for establishing a production schedule from the further shipping rate prediction and the parameter set by the production schedule parameter updating means 15, and file system 16 for filing each data.</description><edition>6</edition><language>eng</language><subject>CALCULATING ; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOTDIRECTED TO A PARTICULAR RESULT ; COMPUTING ; CONTROL OR REGULATING SYSTEMS IN GENERAL ; CONTROLLING ; CONVEYING ; COUNTING ; DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES ; DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g.ARRANGEMENTS FOR COPYING OR CONTROLLING ; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS ; HANDLING THIN OR FILAMENTARY MATERIAL ; MACHINE TOOLS ; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OFPARTICULAR DETAILS OR COMPONENTS ; METAL-WORKING NOT OTHERWISE PROVIDED FOR ; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS ; PACKING ; PERFORMING OPERATIONS ; PHYSICS ; PNEUMATIC TUBE CONVEYORS ; REGULATING ; SHOP CONVEYOR SYSTEMS ; STORING ; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR ; TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING ORTIPPING ; TRANSPORTING</subject><creationdate>1999</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19990730&amp;DB=EPODOC&amp;CC=JP&amp;NR=H11203361A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,778,883,25547,76298</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19990730&amp;DB=EPODOC&amp;CC=JP&amp;NR=H11203361A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KUDO KAORU</creatorcontrib><title>SYSTEM FOR EASILY CALCULATING PRODUCTION SCHEDULE</title><description>PROBLEM TO BE SOLVED: To provide a system for easily calculating a production schedule which any variation due to an individual difference or the presence or absence of an experience can be prevented, and any high level technical knowledge such as the introduction or time-sequential analysis of a shipping prediction system can be unnecessitated. SOLUTION: This system for easily calculating a production schedule is provided with a result data receiving means 11 for receiving the shipping high result of a latest month from a host computer 2 or the like, result data updating means 12 for updating the shipping high result data for the past prescribed months based on the received data, future data predicting means 13 for operating the shipping high prediction for further prescribed months by a time- sequential analytic method based on the shipping high result data, production schedule parameter updating means 15 for setting and updating a parameter such as a customer made product ratio or a term end reference stock rate, production schedule establishing means 14 for establishing a production schedule from the further shipping rate prediction and the parameter set by the production schedule parameter updating means 15, and file system 16 for filing each data.</description><subject>CALCULATING</subject><subject>COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOTDIRECTED TO A PARTICULAR RESULT</subject><subject>COMPUTING</subject><subject>CONTROL OR REGULATING SYSTEMS IN GENERAL</subject><subject>CONTROLLING</subject><subject>CONVEYING</subject><subject>COUNTING</subject><subject>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</subject><subject>DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g.ARRANGEMENTS FOR COPYING OR CONTROLLING</subject><subject>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</subject><subject>HANDLING THIN OR FILAMENTARY MATERIAL</subject><subject>MACHINE TOOLS</subject><subject>MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OFPARTICULAR DETAILS OR COMPONENTS</subject><subject>METAL-WORKING NOT OTHERWISE PROVIDED FOR</subject><subject>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</subject><subject>PACKING</subject><subject>PERFORMING OPERATIONS</subject><subject>PHYSICS</subject><subject>PNEUMATIC TUBE CONVEYORS</subject><subject>REGULATING</subject><subject>SHOP CONVEYOR SYSTEMS</subject><subject>STORING</subject><subject>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</subject><subject>TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING ORTIPPING</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1999</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDAMjgwOcfVVcPMPUnB1DPb0iVRwdvRxDvVxDPH0c1cICPJ3CXUO8fT3Uwh29nB1CfVx5WFgTUvMKU7lhdLcDIpuriHOHrqpBfnxqcUFicmpeakl8V4BHoaGRgbGxmaGjsbEqAEAcbEm6g</recordid><startdate>19990730</startdate><enddate>19990730</enddate><creator>KUDO KAORU</creator><scope>EVB</scope></search><sort><creationdate>19990730</creationdate><title>SYSTEM FOR EASILY CALCULATING PRODUCTION SCHEDULE</title><author>KUDO KAORU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH11203361A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1999</creationdate><topic>CALCULATING</topic><topic>COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOTDIRECTED TO A PARTICULAR RESULT</topic><topic>COMPUTING</topic><topic>CONTROL OR REGULATING SYSTEMS IN GENERAL</topic><topic>CONTROLLING</topic><topic>CONVEYING</topic><topic>COUNTING</topic><topic>DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES</topic><topic>DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g.ARRANGEMENTS FOR COPYING OR CONTROLLING</topic><topic>FUNCTIONAL ELEMENTS OF SUCH SYSTEMS</topic><topic>HANDLING THIN OR FILAMENTARY MATERIAL</topic><topic>MACHINE TOOLS</topic><topic>MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OFPARTICULAR DETAILS OR COMPONENTS</topic><topic>METAL-WORKING NOT OTHERWISE PROVIDED FOR</topic><topic>MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS</topic><topic>PACKING</topic><topic>PERFORMING OPERATIONS</topic><topic>PHYSICS</topic><topic>PNEUMATIC TUBE CONVEYORS</topic><topic>REGULATING</topic><topic>SHOP CONVEYOR SYSTEMS</topic><topic>STORING</topic><topic>SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR</topic><topic>TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING ORTIPPING</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>KUDO KAORU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KUDO KAORU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SYSTEM FOR EASILY CALCULATING PRODUCTION SCHEDULE</title><date>1999-07-30</date><risdate>1999</risdate><abstract>PROBLEM TO BE SOLVED: To provide a system for easily calculating a production schedule which any variation due to an individual difference or the presence or absence of an experience can be prevented, and any high level technical knowledge such as the introduction or time-sequential analysis of a shipping prediction system can be unnecessitated. SOLUTION: This system for easily calculating a production schedule is provided with a result data receiving means 11 for receiving the shipping high result of a latest month from a host computer 2 or the like, result data updating means 12 for updating the shipping high result data for the past prescribed months based on the received data, future data predicting means 13 for operating the shipping high prediction for further prescribed months by a time- sequential analytic method based on the shipping high result data, production schedule parameter updating means 15 for setting and updating a parameter such as a customer made product ratio or a term end reference stock rate, production schedule establishing means 14 for establishing a production schedule from the further shipping rate prediction and the parameter set by the production schedule parameter updating means 15, and file system 16 for filing each data.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH11203361A
source esp@cenet
subjects CALCULATING
COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOTDIRECTED TO A PARTICULAR RESULT
COMPUTING
CONTROL OR REGULATING SYSTEMS IN GENERAL
CONTROLLING
CONVEYING
COUNTING
DATA PROCESSING SYSTEMS OR METHODS, SPECIALLY ADAPTED FORADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORYOR FORECASTING PURPOSES
DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g.ARRANGEMENTS FOR COPYING OR CONTROLLING
FUNCTIONAL ELEMENTS OF SUCH SYSTEMS
HANDLING THIN OR FILAMENTARY MATERIAL
MACHINE TOOLS
MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OFPARTICULAR DETAILS OR COMPONENTS
METAL-WORKING NOT OTHERWISE PROVIDED FOR
MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS ORELEMENTS
PACKING
PERFORMING OPERATIONS
PHYSICS
PNEUMATIC TUBE CONVEYORS
REGULATING
SHOP CONVEYOR SYSTEMS
STORING
SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE,COMMERCIAL, FINANCIAL, MANAGERIAL, SUPERVISORY OR FORECASTINGPURPOSES, NOT OTHERWISE PROVIDED FOR
TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING ORTIPPING
TRANSPORTING
title SYSTEM FOR EASILY CALCULATING PRODUCTION SCHEDULE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-16T23%3A33%3A52IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KUDO%20KAORU&rft.date=1999-07-30&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH11203361A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true