CONSTRUCTION METHOD OF DWELLING HOUSE FOUNDATION AND PIPING

PROBLEM TO BE SOLVED: To provide a construction method of dwelling house foundation and piping wherein by performing excavation of the foundation and piping line in the same period, work efficiency is improved, also prevention of complication in a process is realized. SOLUTION: In the same period ex...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: MAENO SHIGENOBU
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator MAENO SHIGENOBU
description PROBLEM TO BE SOLVED: To provide a construction method of dwelling house foundation and piping wherein by performing excavation of the foundation and piping line in the same period, work efficiency is improved, also prevention of complication in a process is realized. SOLUTION: In the same period execution foundation construction, piping construction is executed. A batter board 1 is provided corresponding to an objective building in a site, in this batter board, corresponding to a positioning center of peripheral foundation of the building, a building core leveling string 2 is provided, from this building core leveling string 2, with a horizontal distance set in a design step, a piping line core leveling string 3 is provided. With each leveling string 2, 3 serving as the reference, simultaneously foundation is excavated, a foundation excavation bottom surface 5 and piping line excavation 6 are formed, conforming to the piping line core leveling string 3, an external piping 7 is executed. Thereafter, a foundation reinforcing bar is formed, an internal lead-in pipe is inserted through this foundation reinforcing bar, concrete is placed, the foundation is construction.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH11159659A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH11159659A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH11159659A3</originalsourceid><addsrcrecordid>eNrjZLB29vcLDgkKdQ7x9PdT8HUN8fB3UfB3U3AJd_Xx8fRzV_DwDw12VXDzD_VzcQSrcfRzUQjwDADK8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeK8AD0NDQ1NLM1NLR2Ni1AAA_Rgpug</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTION METHOD OF DWELLING HOUSE FOUNDATION AND PIPING</title><source>esp@cenet</source><creator>MAENO SHIGENOBU</creator><creatorcontrib>MAENO SHIGENOBU</creatorcontrib><description>PROBLEM TO BE SOLVED: To provide a construction method of dwelling house foundation and piping wherein by performing excavation of the foundation and piping line in the same period, work efficiency is improved, also prevention of complication in a process is realized. SOLUTION: In the same period execution foundation construction, piping construction is executed. A batter board 1 is provided corresponding to an objective building in a site, in this batter board, corresponding to a positioning center of peripheral foundation of the building, a building core leveling string 2 is provided, from this building core leveling string 2, with a horizontal distance set in a design step, a piping line core leveling string 3 is provided. With each leveling string 2, 3 serving as the reference, simultaneously foundation is excavated, a foundation excavation bottom surface 5 and piping line excavation 6 are formed, conforming to the piping line core leveling string 3, an external piping 7 is executed. Thereafter, a foundation reinforcing bar is formed, an internal lead-in pipe is inserted through this foundation reinforcing bar, concrete is placed, the foundation is construction.</description><edition>6</edition><language>eng</language><subject>BLASTING ; DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER ; ENGINEERING ELEMENTS AND UNITS ; FIXED CONSTRUCTIONS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HEATING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; PIPES ; SEWERAGE ; SINKS ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; WATER SUPPLY ; WEAPONS</subject><creationdate>1999</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19990615&amp;DB=EPODOC&amp;CC=JP&amp;NR=H11159659A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76294</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19990615&amp;DB=EPODOC&amp;CC=JP&amp;NR=H11159659A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>MAENO SHIGENOBU</creatorcontrib><title>CONSTRUCTION METHOD OF DWELLING HOUSE FOUNDATION AND PIPING</title><description>PROBLEM TO BE SOLVED: To provide a construction method of dwelling house foundation and piping wherein by performing excavation of the foundation and piping line in the same period, work efficiency is improved, also prevention of complication in a process is realized. SOLUTION: In the same period execution foundation construction, piping construction is executed. A batter board 1 is provided corresponding to an objective building in a site, in this batter board, corresponding to a positioning center of peripheral foundation of the building, a building core leveling string 2 is provided, from this building core leveling string 2, with a horizontal distance set in a design step, a piping line core leveling string 3 is provided. With each leveling string 2, 3 serving as the reference, simultaneously foundation is excavated, a foundation excavation bottom surface 5 and piping line excavation 6 are formed, conforming to the piping line core leveling string 3, an external piping 7 is executed. Thereafter, a foundation reinforcing bar is formed, an internal lead-in pipe is inserted through this foundation reinforcing bar, concrete is placed, the foundation is construction.</description><subject>BLASTING</subject><subject>DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HEATING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>PIPES</subject><subject>SEWERAGE</subject><subject>SINKS</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WATER SUPPLY</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1999</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZLB29vcLDgkKdQ7x9PdT8HUN8fB3UfB3U3AJd_Xx8fRzV_DwDw12VXDzD_VzcQSrcfRzUQjwDADK8TCwpiXmFKfyQmluBkU31xBnD93Ugvz41OKCxOTUvNSSeK8AD0NDQ1NLM1NLR2Ni1AAA_Rgpug</recordid><startdate>19990615</startdate><enddate>19990615</enddate><creator>MAENO SHIGENOBU</creator><scope>EVB</scope></search><sort><creationdate>19990615</creationdate><title>CONSTRUCTION METHOD OF DWELLING HOUSE FOUNDATION AND PIPING</title><author>MAENO SHIGENOBU</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH11159659A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1999</creationdate><topic>BLASTING</topic><topic>DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HEATING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>PIPES</topic><topic>SEWERAGE</topic><topic>SINKS</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WATER SUPPLY</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>MAENO SHIGENOBU</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>MAENO SHIGENOBU</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTION METHOD OF DWELLING HOUSE FOUNDATION AND PIPING</title><date>1999-06-15</date><risdate>1999</risdate><abstract>PROBLEM TO BE SOLVED: To provide a construction method of dwelling house foundation and piping wherein by performing excavation of the foundation and piping line in the same period, work efficiency is improved, also prevention of complication in a process is realized. SOLUTION: In the same period execution foundation construction, piping construction is executed. A batter board 1 is provided corresponding to an objective building in a site, in this batter board, corresponding to a positioning center of peripheral foundation of the building, a building core leveling string 2 is provided, from this building core leveling string 2, with a horizontal distance set in a design step, a piping line core leveling string 3 is provided. With each leveling string 2, 3 serving as the reference, simultaneously foundation is excavated, a foundation excavation bottom surface 5 and piping line excavation 6 are formed, conforming to the piping line core leveling string 3, an external piping 7 is executed. Thereafter, a foundation reinforcing bar is formed, an internal lead-in pipe is inserted through this foundation reinforcing bar, concrete is placed, the foundation is construction.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH11159659A
source esp@cenet
subjects BLASTING
DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER
ENGINEERING ELEMENTS AND UNITS
FIXED CONSTRUCTIONS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HEATING
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MEANS FOR THERMAL INSULATION IN GENERAL
MECHANICAL ENGINEERING
PIPES
SEWERAGE
SINKS
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
THERMAL INSULATION IN GENERAL
WATER SUPPLY
WEAPONS
title CONSTRUCTION METHOD OF DWELLING HOUSE FOUNDATION AND PIPING
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-23T00%3A11%3A44IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=MAENO%20SHIGENOBU&rft.date=1999-06-15&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH11159659A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true