CONSTRUCTING METHOD OF COMPOSITE STRUCTURE

PROBLEM TO BE SOLVED: To improve workability by projecting a column steel frame, to which a reinforced beam in the inter-beam direction is built, in specified length from height, in which a beam in the girder direction is disposed, supporting a temporary beam at the upper ends of both column steel f...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: OKURA HISANORI
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator OKURA HISANORI
description PROBLEM TO BE SOLVED: To improve workability by projecting a column steel frame, to which a reinforced beam in the inter-beam direction is built, in specified length from height, in which a beam in the girder direction is disposed, supporting a temporary beam at the upper ends of both column steel frames and constructing the reinforced beam under a suspended state. SOLUTION: In a composite structure 15, in which beams in the girder direction are formed in steel-framed beams 12 or steel-framed reinforced beams and a beam in the inter-beam direction 13 is formed in a reinforced beam 14, coin steel frames 16 are disposed in upright while the column steel frames 16 are projected in specified length from height, in which the steel-framed beams 12 in the girder direction are arranged. A temporary beam 17, from which the beforehand assembled reinforced beam 14 in the inter-beam direction 13 are hung down, is hung up and placed at the upper ends of both column steel frames 16 projected in specified length by a crane, and the reinforced beam 14 is built at a fixed place. Hanging jigs 18 supported to the temporary beam 17 consist of angle materials 19 installed to the temporary beam 17 and hang bolts 20 mounted at both ends of the angle material 19, and the upper end reinforcement of the reinforced beam 14 is supported. Accordingly, the erection works and removing works of supports need not be conducted, and workability and safety can be improved.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH1113141A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH1113141A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH1113141A3</originalsourceid><addsrcrecordid>eNrjZNBy9vcLDgkKdQ7x9HNX8HUN8fB3UfB3U3D29w3wD_YMcVWAyIYGufIwsKYl5hSn8kJpbgYFN9cQZw_d1IL8-NTigsTk1LzUknivAA9DQ0NjQxNDR2MilAAAOwkkxg</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CONSTRUCTING METHOD OF COMPOSITE STRUCTURE</title><source>esp@cenet</source><creator>OKURA HISANORI</creator><creatorcontrib>OKURA HISANORI</creatorcontrib><description>PROBLEM TO BE SOLVED: To improve workability by projecting a column steel frame, to which a reinforced beam in the inter-beam direction is built, in specified length from height, in which a beam in the girder direction is disposed, supporting a temporary beam at the upper ends of both column steel frames and constructing the reinforced beam under a suspended state. SOLUTION: In a composite structure 15, in which beams in the girder direction are formed in steel-framed beams 12 or steel-framed reinforced beams and a beam in the inter-beam direction 13 is formed in a reinforced beam 14, coin steel frames 16 are disposed in upright while the column steel frames 16 are projected in specified length from height, in which the steel-framed beams 12 in the girder direction are arranged. A temporary beam 17, from which the beforehand assembled reinforced beam 14 in the inter-beam direction 13 are hung down, is hung up and placed at the upper ends of both column steel frames 16 projected in specified length by a crane, and the reinforced beam 14 is built at a fixed place. Hanging jigs 18 supported to the temporary beam 17 consist of angle materials 19 installed to the temporary beam 17 and hang bolts 20 mounted at both ends of the angle material 19, and the upper end reinforcement of the reinforced beam 14 is supported. Accordingly, the erection works and removing works of supports need not be conducted, and workability and safety can be improved.</description><edition>6</edition><language>eng</language><subject>BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; CEILINGS ; FIXED CONSTRUCTIONS ; FLOORS ; FORMS ; GENERAL BUILDING CONSTRUCTIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; INSULATION OR OTHER PROTECTION OF BUILDINGS ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; ROOFS ; SCAFFOLDING ; SHUTTERING ; WALLS, e.g. PARTITIONS</subject><creationdate>1999</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19990119&amp;DB=EPODOC&amp;CC=JP&amp;NR=H1113141A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25543,76293</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19990119&amp;DB=EPODOC&amp;CC=JP&amp;NR=H1113141A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>OKURA HISANORI</creatorcontrib><title>CONSTRUCTING METHOD OF COMPOSITE STRUCTURE</title><description>PROBLEM TO BE SOLVED: To improve workability by projecting a column steel frame, to which a reinforced beam in the inter-beam direction is built, in specified length from height, in which a beam in the girder direction is disposed, supporting a temporary beam at the upper ends of both column steel frames and constructing the reinforced beam under a suspended state. SOLUTION: In a composite structure 15, in which beams in the girder direction are formed in steel-framed beams 12 or steel-framed reinforced beams and a beam in the inter-beam direction 13 is formed in a reinforced beam 14, coin steel frames 16 are disposed in upright while the column steel frames 16 are projected in specified length from height, in which the steel-framed beams 12 in the girder direction are arranged. A temporary beam 17, from which the beforehand assembled reinforced beam 14 in the inter-beam direction 13 are hung down, is hung up and placed at the upper ends of both column steel frames 16 projected in specified length by a crane, and the reinforced beam 14 is built at a fixed place. Hanging jigs 18 supported to the temporary beam 17 consist of angle materials 19 installed to the temporary beam 17 and hang bolts 20 mounted at both ends of the angle material 19, and the upper end reinforcement of the reinforced beam 14 is supported. Accordingly, the erection works and removing works of supports need not be conducted, and workability and safety can be improved.</description><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>CEILINGS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FLOORS</subject><subject>FORMS</subject><subject>GENERAL BUILDING CONSTRUCTIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>INSULATION OR OTHER PROTECTION OF BUILDINGS</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>ROOFS</subject><subject>SCAFFOLDING</subject><subject>SHUTTERING</subject><subject>WALLS, e.g. PARTITIONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1999</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZNBy9vcLDgkKdQ7x9HNX8HUN8fB3UfB3U3D29w3wD_YMcVWAyIYGufIwsKYl5hSn8kJpbgYFN9cQZw_d1IL8-NTigsTk1LzUknivAA9DQ0NjQxNDR2MilAAAOwkkxg</recordid><startdate>19990119</startdate><enddate>19990119</enddate><creator>OKURA HISANORI</creator><scope>EVB</scope></search><sort><creationdate>19990119</creationdate><title>CONSTRUCTING METHOD OF COMPOSITE STRUCTURE</title><author>OKURA HISANORI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH1113141A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1999</creationdate><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>CEILINGS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FLOORS</topic><topic>FORMS</topic><topic>GENERAL BUILDING CONSTRUCTIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>INSULATION OR OTHER PROTECTION OF BUILDINGS</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>ROOFS</topic><topic>SCAFFOLDING</topic><topic>SHUTTERING</topic><topic>WALLS, e.g. PARTITIONS</topic><toplevel>online_resources</toplevel><creatorcontrib>OKURA HISANORI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>OKURA HISANORI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CONSTRUCTING METHOD OF COMPOSITE STRUCTURE</title><date>1999-01-19</date><risdate>1999</risdate><abstract>PROBLEM TO BE SOLVED: To improve workability by projecting a column steel frame, to which a reinforced beam in the inter-beam direction is built, in specified length from height, in which a beam in the girder direction is disposed, supporting a temporary beam at the upper ends of both column steel frames and constructing the reinforced beam under a suspended state. SOLUTION: In a composite structure 15, in which beams in the girder direction are formed in steel-framed beams 12 or steel-framed reinforced beams and a beam in the inter-beam direction 13 is formed in a reinforced beam 14, coin steel frames 16 are disposed in upright while the column steel frames 16 are projected in specified length from height, in which the steel-framed beams 12 in the girder direction are arranged. A temporary beam 17, from which the beforehand assembled reinforced beam 14 in the inter-beam direction 13 are hung down, is hung up and placed at the upper ends of both column steel frames 16 projected in specified length by a crane, and the reinforced beam 14 is built at a fixed place. Hanging jigs 18 supported to the temporary beam 17 consist of angle materials 19 installed to the temporary beam 17 and hang bolts 20 mounted at both ends of the angle material 19, and the upper end reinforcement of the reinforced beam 14 is supported. Accordingly, the erection works and removing works of supports need not be conducted, and workability and safety can be improved.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH1113141A
source esp@cenet
subjects BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
CEILINGS
FIXED CONSTRUCTIONS
FLOORS
FORMS
GENERAL BUILDING CONSTRUCTIONS
HANDLING BUILDING MATERIALS ON THE SITE
INSULATION OR OTHER PROTECTION OF BUILDINGS
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
ROOFS
SCAFFOLDING
SHUTTERING
WALLS, e.g. PARTITIONS
title CONSTRUCTING METHOD OF COMPOSITE STRUCTURE
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-26T14%3A22%3A51IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=OKURA%20HISANORI&rft.date=1999-01-19&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH1113141A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true