AQUIFER CUT-OFF METHOD FOR EXISTING WELL
PROBLEM TO BE SOLVED: To surely and efficiently prevent the incursion of ground water in an optional unnecessary aquifer of the existing well into the well. SOLUTION: A aquifer cut-off method of the existing well excavates a plurality of guide holes H2 up to a position near to a boundary B2 between...
Gespeichert in:
1. Verfasser: | |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
Schreiben Sie den ersten Kommentar!