CLIMBING ELEVATOR
PROBLEM TO BE SOLVED: To accomplish increase in the number of stopping floors and in a using time for an elevator, to shorten a transferring time, and to facilitate a changeover to main equipment. SOLUTION: This elevator is provided with a sheave unit 2 arranged at the top of an elevator lifting pas...
Gespeichert in:
Hauptverfasser: | , , , , |
---|---|
Format: | Patent |
Sprache: | eng |
Schlagworte: | |
Online-Zugang: | Volltext bestellen |
Tags: |
Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
|
container_end_page | |
---|---|
container_issue | |
container_start_page | |
container_title | |
container_volume | |
creator | FUKUNAGA TERUO YANAGIDA RYUICHI HAYASHI YUTAKA MOROI YOJI SAWAMOTO KEIJI |
description | PROBLEM TO BE SOLVED: To accomplish increase in the number of stopping floors and in a using time for an elevator, to shorten a transferring time, and to facilitate a changeover to main equipment. SOLUTION: This elevator is provided with a sheave unit 2 arranged at the top of an elevator lifting passage 1, a supporting member arranged in the upper part of the sheave unit 2, a lifting device which is arranged in the supporting member so as to lift the sheave unit 2, a rope feeding device 9 arranged in the sheave unit 2, a temporary machine chamber 10 arranged on the outside of the elevator lifting passage 1, a hoisting device 11 arranged in the temporary machine chamber 10, a car 15, and a counterweight 16. Then, a rope 23 whose one end is fixed to the sheave unit 2 is connected to the rope feeding device 9 via the counterweight 16, a sheave 7 in the shave unit 2, the hoisting device 11, sheaves 6, 5 in the sheave unit 2, and the car 15. |
format | Patent |
fullrecord | <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH10316331A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH10316331A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH10316331A3</originalsourceid><addsrcrecordid>eNrjZBB09vH0dfL0c1dw9XENcwzxD-JhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfFeAR6GBsaGZsbGho7GxKgBACHgHeU</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>CLIMBING ELEVATOR</title><source>esp@cenet</source><creator>FUKUNAGA TERUO ; YANAGIDA RYUICHI ; HAYASHI YUTAKA ; MOROI YOJI ; SAWAMOTO KEIJI</creator><creatorcontrib>FUKUNAGA TERUO ; YANAGIDA RYUICHI ; HAYASHI YUTAKA ; MOROI YOJI ; SAWAMOTO KEIJI</creatorcontrib><description>PROBLEM TO BE SOLVED: To accomplish increase in the number of stopping floors and in a using time for an elevator, to shorten a transferring time, and to facilitate a changeover to main equipment. SOLUTION: This elevator is provided with a sheave unit 2 arranged at the top of an elevator lifting passage 1, a supporting member arranged in the upper part of the sheave unit 2, a lifting device which is arranged in the supporting member so as to lift the sheave unit 2, a rope feeding device 9 arranged in the sheave unit 2, a temporary machine chamber 10 arranged on the outside of the elevator lifting passage 1, a hoisting device 11 arranged in the temporary machine chamber 10, a car 15, and a counterweight 16. Then, a rope 23 whose one end is fixed to the sheave unit 2 is connected to the rope feeding device 9 via the counterweight 16, a sheave 7 in the shave unit 2, the hoisting device 11, sheaves 6, 5 in the sheave unit 2, and the car 15.</description><edition>6</edition><language>eng</language><subject>ELEVATORS ; ESCALATORS OR MOVING WALKWAYS ; HAULING ; HOISTING ; LIFTING ; PERFORMING OPERATIONS ; TRANSPORTING</subject><creationdate>1998</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19981202&DB=EPODOC&CC=JP&NR=H10316331A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&date=19981202&DB=EPODOC&CC=JP&NR=H10316331A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>FUKUNAGA TERUO</creatorcontrib><creatorcontrib>YANAGIDA RYUICHI</creatorcontrib><creatorcontrib>HAYASHI YUTAKA</creatorcontrib><creatorcontrib>MOROI YOJI</creatorcontrib><creatorcontrib>SAWAMOTO KEIJI</creatorcontrib><title>CLIMBING ELEVATOR</title><description>PROBLEM TO BE SOLVED: To accomplish increase in the number of stopping floors and in a using time for an elevator, to shorten a transferring time, and to facilitate a changeover to main equipment. SOLUTION: This elevator is provided with a sheave unit 2 arranged at the top of an elevator lifting passage 1, a supporting member arranged in the upper part of the sheave unit 2, a lifting device which is arranged in the supporting member so as to lift the sheave unit 2, a rope feeding device 9 arranged in the sheave unit 2, a temporary machine chamber 10 arranged on the outside of the elevator lifting passage 1, a hoisting device 11 arranged in the temporary machine chamber 10, a car 15, and a counterweight 16. Then, a rope 23 whose one end is fixed to the sheave unit 2 is connected to the rope feeding device 9 via the counterweight 16, a sheave 7 in the shave unit 2, the hoisting device 11, sheaves 6, 5 in the sheave unit 2, and the car 15.</description><subject>ELEVATORS</subject><subject>ESCALATORS OR MOVING WALKWAYS</subject><subject>HAULING</subject><subject>HOISTING</subject><subject>LIFTING</subject><subject>PERFORMING OPERATIONS</subject><subject>TRANSPORTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1998</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZBB09vH0dfL0c1dw9XENcwzxD-JhYE1LzClO5YXS3AyKbq4hzh66qQX58anFBYnJqXmpJfFeAR6GBsaGZsbGho7GxKgBACHgHeU</recordid><startdate>19981202</startdate><enddate>19981202</enddate><creator>FUKUNAGA TERUO</creator><creator>YANAGIDA RYUICHI</creator><creator>HAYASHI YUTAKA</creator><creator>MOROI YOJI</creator><creator>SAWAMOTO KEIJI</creator><scope>EVB</scope></search><sort><creationdate>19981202</creationdate><title>CLIMBING ELEVATOR</title><author>FUKUNAGA TERUO ; YANAGIDA RYUICHI ; HAYASHI YUTAKA ; MOROI YOJI ; SAWAMOTO KEIJI</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH10316331A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1998</creationdate><topic>ELEVATORS</topic><topic>ESCALATORS OR MOVING WALKWAYS</topic><topic>HAULING</topic><topic>HOISTING</topic><topic>LIFTING</topic><topic>PERFORMING OPERATIONS</topic><topic>TRANSPORTING</topic><toplevel>online_resources</toplevel><creatorcontrib>FUKUNAGA TERUO</creatorcontrib><creatorcontrib>YANAGIDA RYUICHI</creatorcontrib><creatorcontrib>HAYASHI YUTAKA</creatorcontrib><creatorcontrib>MOROI YOJI</creatorcontrib><creatorcontrib>SAWAMOTO KEIJI</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>FUKUNAGA TERUO</au><au>YANAGIDA RYUICHI</au><au>HAYASHI YUTAKA</au><au>MOROI YOJI</au><au>SAWAMOTO KEIJI</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>CLIMBING ELEVATOR</title><date>1998-12-02</date><risdate>1998</risdate><abstract>PROBLEM TO BE SOLVED: To accomplish increase in the number of stopping floors and in a using time for an elevator, to shorten a transferring time, and to facilitate a changeover to main equipment. SOLUTION: This elevator is provided with a sheave unit 2 arranged at the top of an elevator lifting passage 1, a supporting member arranged in the upper part of the sheave unit 2, a lifting device which is arranged in the supporting member so as to lift the sheave unit 2, a rope feeding device 9 arranged in the sheave unit 2, a temporary machine chamber 10 arranged on the outside of the elevator lifting passage 1, a hoisting device 11 arranged in the temporary machine chamber 10, a car 15, and a counterweight 16. Then, a rope 23 whose one end is fixed to the sheave unit 2 is connected to the rope feeding device 9 via the counterweight 16, a sheave 7 in the shave unit 2, the hoisting device 11, sheaves 6, 5 in the sheave unit 2, and the car 15.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record> |
fulltext | fulltext_linktorsrc |
identifier | |
ispartof | |
issn | |
language | eng |
recordid | cdi_epo_espacenet_JPH10316331A |
source | esp@cenet |
subjects | ELEVATORS ESCALATORS OR MOVING WALKWAYS HAULING HOISTING LIFTING PERFORMING OPERATIONS TRANSPORTING |
title | CLIMBING ELEVATOR |
url | https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-23T08%3A44%3A07IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=FUKUNAGA%20TERUO&rft.date=1998-12-02&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH10316331A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true |