METHOD AND SYSTEM FOR MEASURING CLOGGING OF PAVEMENT

PROBLEM TO BE SOLVED: To measure the clogged state of pavement accurately in a short time by observing the current flowing between a pair of electrodes arranged on a road to be measured as a function of the time. SOLUTION: A pair of electrodes 11 , 12 are arranged on a road and the current flowing b...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: ISHIBASHI SHIZUKA
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator ISHIBASHI SHIZUKA
description PROBLEM TO BE SOLVED: To measure the clogged state of pavement accurately in a short time by observing the current flowing between a pair of electrodes arranged on a road to be measured as a function of the time. SOLUTION: A pair of electrodes 11 , 12 are arranged on a road and the current flowing between the electrodes 11 , 12 is measured at a measuring section 3 as a function of the time and recorded. A plurality of models corresponding to different clogging states are previously held at the measuring section 3 and the recorded current values are compared with the models to determine the clogging state of the road which is then presented at a display section 2. Installation interval of the electrodes 11 , 12 is set at 30-50 cm and about 100 cc of brine is employed as an electrolyte. The electrolyte is poured from a tunnel section 4 and absorbed by a water absorbing layer 10. The electrolyte is absorbed, as it is, into the ground when a clogging layer 20 is not clogged and the electric resistance between the electrodes 11 , 12 is sustained at a high level for a long time as compared with the case where the clogging layer 20 is clogged. According to the method, clogging of the clogging layer 20 can be measured accurately in a short time.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH10293108A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH10293108A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH10293108A3</originalsourceid><addsrcrecordid>eNrjZDDxdQ3x8HdRcPRzUQiODA5x9VVw8w9S8HV1DA4N8vRzV3D28Xd3BzH83RQCHMNcfV39QngYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbxXgIehgZGlsaGBhaMxMWoAwDcndw</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>METHOD AND SYSTEM FOR MEASURING CLOGGING OF PAVEMENT</title><source>esp@cenet</source><creator>ISHIBASHI SHIZUKA</creator><creatorcontrib>ISHIBASHI SHIZUKA</creatorcontrib><description>PROBLEM TO BE SOLVED: To measure the clogged state of pavement accurately in a short time by observing the current flowing between a pair of electrodes arranged on a road to be measured as a function of the time. SOLUTION: A pair of electrodes 11 , 12 are arranged on a road and the current flowing between the electrodes 11 , 12 is measured at a measuring section 3 as a function of the time and recorded. A plurality of models corresponding to different clogging states are previously held at the measuring section 3 and the recorded current values are compared with the models to determine the clogging state of the road which is then presented at a display section 2. Installation interval of the electrodes 11 , 12 is set at 30-50 cm and about 100 cc of brine is employed as an electrolyte. The electrolyte is poured from a tunnel section 4 and absorbed by a water absorbing layer 10. The electrolyte is absorbed, as it is, into the ground when a clogging layer 20 is not clogged and the electric resistance between the electrodes 11 , 12 is sustained at a high level for a long time as compared with the case where the clogging layer 20 is clogged. According to the method, clogging of the clogging layer 20 can be measured accurately in a short time.</description><edition>6</edition><language>eng</language><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES ; CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE ; FIXED CONSTRUCTIONS ; INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES ; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR ; MEASURING ; PHYSICS ; TESTING</subject><creationdate>1998</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19981104&amp;DB=EPODOC&amp;CC=JP&amp;NR=H10293108A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25564,76547</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19981104&amp;DB=EPODOC&amp;CC=JP&amp;NR=H10293108A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>ISHIBASHI SHIZUKA</creatorcontrib><title>METHOD AND SYSTEM FOR MEASURING CLOGGING OF PAVEMENT</title><description>PROBLEM TO BE SOLVED: To measure the clogged state of pavement accurately in a short time by observing the current flowing between a pair of electrodes arranged on a road to be measured as a function of the time. SOLUTION: A pair of electrodes 11 , 12 are arranged on a road and the current flowing between the electrodes 11 , 12 is measured at a measuring section 3 as a function of the time and recorded. A plurality of models corresponding to different clogging states are previously held at the measuring section 3 and the recorded current values are compared with the models to determine the clogging state of the road which is then presented at a display section 2. Installation interval of the electrodes 11 , 12 is set at 30-50 cm and about 100 cc of brine is employed as an electrolyte. The electrolyte is poured from a tunnel section 4 and absorbed by a water absorbing layer 10. The electrolyte is absorbed, as it is, into the ground when a clogging layer 20 is not clogged and the electric resistance between the electrodes 11 , 12 is sustained at a high level for a long time as compared with the case where the clogging layer 20 is clogged. According to the method, clogging of the clogging layer 20 can be measured accurately in a short time.</description><subject>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</subject><subject>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</subject><subject>FIXED CONSTRUCTIONS</subject><subject>INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES</subject><subject>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</subject><subject>MEASURING</subject><subject>PHYSICS</subject><subject>TESTING</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1998</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZDDxdQ3x8HdRcPRzUQiODA5x9VVw8w9S8HV1DA4N8vRzV3D28Xd3BzH83RQCHMNcfV39QngYWNMSc4pTeaE0N4Oim2uIs4duakF-fGpxQWJyal5qSbxXgIehgZGlsaGBhaMxMWoAwDcndw</recordid><startdate>19981104</startdate><enddate>19981104</enddate><creator>ISHIBASHI SHIZUKA</creator><scope>EVB</scope></search><sort><creationdate>19981104</creationdate><title>METHOD AND SYSTEM FOR MEASURING CLOGGING OF PAVEMENT</title><author>ISHIBASHI SHIZUKA</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH10293108A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1998</creationdate><topic>CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES</topic><topic>CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE</topic><topic>FIXED CONSTRUCTIONS</topic><topic>INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES</topic><topic>MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR</topic><topic>MEASURING</topic><topic>PHYSICS</topic><topic>TESTING</topic><toplevel>online_resources</toplevel><creatorcontrib>ISHIBASHI SHIZUKA</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>ISHIBASHI SHIZUKA</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>METHOD AND SYSTEM FOR MEASURING CLOGGING OF PAVEMENT</title><date>1998-11-04</date><risdate>1998</risdate><abstract>PROBLEM TO BE SOLVED: To measure the clogged state of pavement accurately in a short time by observing the current flowing between a pair of electrodes arranged on a road to be measured as a function of the time. SOLUTION: A pair of electrodes 11 , 12 are arranged on a road and the current flowing between the electrodes 11 , 12 is measured at a measuring section 3 as a function of the time and recorded. A plurality of models corresponding to different clogging states are previously held at the measuring section 3 and the recorded current values are compared with the models to determine the clogging state of the road which is then presented at a display section 2. Installation interval of the electrodes 11 , 12 is set at 30-50 cm and about 100 cc of brine is employed as an electrolyte. The electrolyte is poured from a tunnel section 4 and absorbed by a water absorbing layer 10. The electrolyte is absorbed, as it is, into the ground when a clogging layer 20 is not clogged and the electric resistance between the electrodes 11 , 12 is sustained at a high level for a long time as compared with the case where the clogging layer 20 is clogged. According to the method, clogging of the clogging layer 20 can be measured accurately in a short time.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH10293108A
source esp@cenet
subjects CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, ORTHE LIKE
FIXED CONSTRUCTIONS
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIRCHEMICAL OR PHYSICAL PROPERTIES
MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
MEASURING
PHYSICS
TESTING
title METHOD AND SYSTEM FOR MEASURING CLOGGING OF PAVEMENT
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2024-12-28T14%3A24%3A39IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=ISHIBASHI%20SHIZUKA&rft.date=1998-11-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH10293108A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true