SLOPE FACE GREENING CONSTRUCTION METHOD

PROBLEM TO BE SOLVED: To certainly grow trees by digging a hole on a face of slope, providing a planting container in the hole so that its opening comes to be horizontal and providing the planting container with a seedling in the hole thereof with a vegetation base material. SOLUTION: A planting con...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: TAMAOKI ISAO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator TAMAOKI ISAO
description PROBLEM TO BE SOLVED: To certainly grow trees by digging a hole on a face of slope, providing a planting container in the hole so that its opening comes to be horizontal and providing the planting container with a seedling in the hole thereof with a vegetation base material. SOLUTION: A planting container 8 is set against a hole 7 of a face of slope 1 from a surface side of a sodding body 2 laid on the face of slope 1, the container 8 is set so that one end side opening 8a becomes horizontal and the other end side opening 8b faces the sodding body 2 in the periphery of the hole 7, a presser member 15 is inserted into a hole opened on a lug, and the container 8 is fixed on the face of slope 1. Thereafter, a tree seedling 12 is inserted into the hole 7 through the opening 8a in a state of its root with soil 16, a vegetation base material 13 is put in a clearance of the tree seedling 12, the container 8 and the hole 7, and the tree seedling 12 is roughly horizontally planted by properly backfilling. Thereafter, even when it snows heavily and snow is accumulated on the face of slope 1 for a while immediately after plantation of the tree seedling 12, the container 8 becomes a guard, it prevents application of pressurizing force of snow accumulation on the tree seedling 12, and it is possible to certainly grow a tree.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH10159105A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH10159105A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH10159105A3</originalsourceid><addsrcrecordid>eNrjZFAP9vEPcFVwc3R2VXAPcnX18_RzV3D29wsOCQp1DvH091PwdQ3x8HfhYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxXgEehgaGppaGBqaOxsSoAQDsuSQJ</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>SLOPE FACE GREENING CONSTRUCTION METHOD</title><source>esp@cenet</source><creator>TAMAOKI ISAO</creator><creatorcontrib>TAMAOKI ISAO</creatorcontrib><description>PROBLEM TO BE SOLVED: To certainly grow trees by digging a hole on a face of slope, providing a planting container in the hole so that its opening comes to be horizontal and providing the planting container with a seedling in the hole thereof with a vegetation base material. SOLUTION: A planting container 8 is set against a hole 7 of a face of slope 1 from a surface side of a sodding body 2 laid on the face of slope 1, the container 8 is set so that one end side opening 8a becomes horizontal and the other end side opening 8b faces the sodding body 2 in the periphery of the hole 7, a presser member 15 is inserted into a hole opened on a lug, and the container 8 is fixed on the face of slope 1. Thereafter, a tree seedling 12 is inserted into the hole 7 through the opening 8a in a state of its root with soil 16, a vegetation base material 13 is put in a clearance of the tree seedling 12, the container 8 and the hole 7, and the tree seedling 12 is roughly horizontally planted by properly backfilling. Thereafter, even when it snows heavily and snow is accumulated on the face of slope 1 for a while immediately after plantation of the tree seedling 12, the container 8 becomes a guard, it prevents application of pressurizing force of snow accumulation on the tree seedling 12, and it is possible to certainly grow a tree.</description><edition>6</edition><language>eng</language><subject>EMBANKMENTS ; EXCAVATIONS ; FIXED CONSTRUCTIONS ; FOUNDATIONS ; HYDRAULIC ENGINEERING ; SOIL SHIFTING ; UNDERGROUND OR UNDERWATER STRUCTURES</subject><creationdate>1998</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19980616&amp;DB=EPODOC&amp;CC=JP&amp;NR=H10159105A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,780,885,25563,76418</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19980616&amp;DB=EPODOC&amp;CC=JP&amp;NR=H10159105A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>TAMAOKI ISAO</creatorcontrib><title>SLOPE FACE GREENING CONSTRUCTION METHOD</title><description>PROBLEM TO BE SOLVED: To certainly grow trees by digging a hole on a face of slope, providing a planting container in the hole so that its opening comes to be horizontal and providing the planting container with a seedling in the hole thereof with a vegetation base material. SOLUTION: A planting container 8 is set against a hole 7 of a face of slope 1 from a surface side of a sodding body 2 laid on the face of slope 1, the container 8 is set so that one end side opening 8a becomes horizontal and the other end side opening 8b faces the sodding body 2 in the periphery of the hole 7, a presser member 15 is inserted into a hole opened on a lug, and the container 8 is fixed on the face of slope 1. Thereafter, a tree seedling 12 is inserted into the hole 7 through the opening 8a in a state of its root with soil 16, a vegetation base material 13 is put in a clearance of the tree seedling 12, the container 8 and the hole 7, and the tree seedling 12 is roughly horizontally planted by properly backfilling. Thereafter, even when it snows heavily and snow is accumulated on the face of slope 1 for a while immediately after plantation of the tree seedling 12, the container 8 becomes a guard, it prevents application of pressurizing force of snow accumulation on the tree seedling 12, and it is possible to certainly grow a tree.</description><subject>EMBANKMENTS</subject><subject>EXCAVATIONS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FOUNDATIONS</subject><subject>HYDRAULIC ENGINEERING</subject><subject>SOIL SHIFTING</subject><subject>UNDERGROUND OR UNDERWATER STRUCTURES</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1998</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFAP9vEPcFVwc3R2VXAPcnX18_RzV3D29wsOCQp1DvH091PwdQ3x8HfhYWBNS8wpTuWF0twMim6uIc4euqkF-fGpxQWJyal5qSXxXgEehgaGppaGBqaOxsSoAQDsuSQJ</recordid><startdate>19980616</startdate><enddate>19980616</enddate><creator>TAMAOKI ISAO</creator><scope>EVB</scope></search><sort><creationdate>19980616</creationdate><title>SLOPE FACE GREENING CONSTRUCTION METHOD</title><author>TAMAOKI ISAO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH10159105A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1998</creationdate><topic>EMBANKMENTS</topic><topic>EXCAVATIONS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FOUNDATIONS</topic><topic>HYDRAULIC ENGINEERING</topic><topic>SOIL SHIFTING</topic><topic>UNDERGROUND OR UNDERWATER STRUCTURES</topic><toplevel>online_resources</toplevel><creatorcontrib>TAMAOKI ISAO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>TAMAOKI ISAO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>SLOPE FACE GREENING CONSTRUCTION METHOD</title><date>1998-06-16</date><risdate>1998</risdate><abstract>PROBLEM TO BE SOLVED: To certainly grow trees by digging a hole on a face of slope, providing a planting container in the hole so that its opening comes to be horizontal and providing the planting container with a seedling in the hole thereof with a vegetation base material. SOLUTION: A planting container 8 is set against a hole 7 of a face of slope 1 from a surface side of a sodding body 2 laid on the face of slope 1, the container 8 is set so that one end side opening 8a becomes horizontal and the other end side opening 8b faces the sodding body 2 in the periphery of the hole 7, a presser member 15 is inserted into a hole opened on a lug, and the container 8 is fixed on the face of slope 1. Thereafter, a tree seedling 12 is inserted into the hole 7 through the opening 8a in a state of its root with soil 16, a vegetation base material 13 is put in a clearance of the tree seedling 12, the container 8 and the hole 7, and the tree seedling 12 is roughly horizontally planted by properly backfilling. Thereafter, even when it snows heavily and snow is accumulated on the face of slope 1 for a while immediately after plantation of the tree seedling 12, the container 8 becomes a guard, it prevents application of pressurizing force of snow accumulation on the tree seedling 12, and it is possible to certainly grow a tree.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH10159105A
source esp@cenet
subjects EMBANKMENTS
EXCAVATIONS
FIXED CONSTRUCTIONS
FOUNDATIONS
HYDRAULIC ENGINEERING
SOIL SHIFTING
UNDERGROUND OR UNDERWATER STRUCTURES
title SLOPE FACE GREENING CONSTRUCTION METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-01-08T15%3A55%3A45IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=TAMAOKI%20ISAO&rft.date=1998-06-16&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH10159105A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true