PERMANENT VERTICAL PIPING METHOD

PROBLEM TO BE SOLVED: To conduct the pipe connecting work for individual floors at a fixed position and improve execution efficiency by holding the lifted first pipe in a vertical attitude, adding and connecting the next pipe from below, again lifting the connected pipes in a vertical attitude, and...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
Hauptverfasser: KATO TSUTOMU, TANNO KOZO, MITSUBORI AKIHIRO, HIGUCHI TOSHIO, TANAKA MITSUHIRO
Format: Patent
Sprache:eng
Schlagworte:
Online-Zugang:Volltext bestellen
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
container_end_page
container_issue
container_start_page
container_title
container_volume
creator KATO TSUTOMU
TANNO KOZO
MITSUBORI AKIHIRO
HIGUCHI TOSHIO
TANAKA MITSUHIRO
description PROBLEM TO BE SOLVED: To conduct the pipe connecting work for individual floors at a fixed position and improve execution efficiency by holding the lifted first pipe in a vertical attitude, adding and connecting the next pipe from below, again lifting the connected pipes in a vertical attitude, and repeating these actions. SOLUTION: The first pipe 1a is automatically held by an automatic pipe holding device 12, and a connecting jig 4 and a lifting jig 8 are removed from the lower end. The lifting jig 8 is set to the lower end of the second pipe 1b on the first floor. The lifting jig 8 is lifted by chain blocks 9, the second pipe 1b is lifted to the height of the connection position of its upper end to the lower end of the first pipe 1a, and the pipes 1a, 1b are connected. The lifting jig 8 set to the lower end of the second pipe 1b is further lifted by the chain blocks 9, and a connected body of the pipes 1a, 1b is integrally lifted until the lower end of the pipe 1b reaches the height of the connecting work position on the second floor.
format Patent
fullrecord <record><control><sourceid>epo_EVB</sourceid><recordid>TN_cdi_epo_espacenet_JPH0960765A</recordid><sourceformat>XML</sourceformat><sourcesystem>PC</sourcesystem><sourcerecordid>JPH0960765A</sourcerecordid><originalsourceid>FETCH-epo_espacenet_JPH0960765A3</originalsourceid><addsrcrecordid>eNrjZFAIcA3ydfRz9QtRCHMNCvF0dvRRCPAM8PRzV_B1DfHwd-FhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfFeAR4GlmYG5mamjsZEKAEAxBsh1Q</addsrcrecordid><sourcetype>Open Access Repository</sourcetype><iscdi>true</iscdi><recordtype>patent</recordtype></control><display><type>patent</type><title>PERMANENT VERTICAL PIPING METHOD</title><source>esp@cenet</source><creator>KATO TSUTOMU ; TANNO KOZO ; MITSUBORI AKIHIRO ; HIGUCHI TOSHIO ; TANAKA MITSUHIRO</creator><creatorcontrib>KATO TSUTOMU ; TANNO KOZO ; MITSUBORI AKIHIRO ; HIGUCHI TOSHIO ; TANAKA MITSUHIRO</creatorcontrib><description>PROBLEM TO BE SOLVED: To conduct the pipe connecting work for individual floors at a fixed position and improve execution efficiency by holding the lifted first pipe in a vertical attitude, adding and connecting the next pipe from below, again lifting the connected pipes in a vertical attitude, and repeating these actions. SOLUTION: The first pipe 1a is automatically held by an automatic pipe holding device 12, and a connecting jig 4 and a lifting jig 8 are removed from the lower end. The lifting jig 8 is set to the lower end of the second pipe 1b on the first floor. The lifting jig 8 is lifted by chain blocks 9, the second pipe 1b is lifted to the height of the connection position of its upper end to the lower end of the first pipe 1a, and the pipes 1a, 1b are connected. The lifting jig 8 set to the lower end of the second pipe 1b is further lifted by the chain blocks 9, and a connected body of the pipes 1a, 1b is integrally lifted until the lower end of the pipe 1b reaches the height of the connecting work position on the second floor.</description><edition>6</edition><language>eng</language><subject>BLASTING ; BUILDING ; BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE ; DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER ; ENGINEERING ELEMENTS AND UNITS ; FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS ; FIXED CONSTRUCTIONS ; FORMS ; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS ; HANDLING BUILDING MATERIALS ON THE SITE ; HEATING ; JOINTS OR FITTINGS FOR PIPES ; LIGHTING ; MEANS FOR THERMAL INSULATION IN GENERAL ; MECHANICAL ENGINEERING ; PIPES ; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS ; SCAFFOLDING ; SEWERAGE ; SHUTTERING ; SINKS ; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING ; THERMAL INSULATION IN GENERAL ; WATER SUPPLY ; WEAPONS</subject><creationdate>1997</creationdate><oa>free_for_read</oa><woscitedreferencessubscribed>false</woscitedreferencessubscribed></display><links><openurl>$$Topenurl_article</openurl><openurlfulltext>$$Topenurlfull_article</openurlfulltext><thumbnail>$$Tsyndetics_thumb_exl</thumbnail><linktohtml>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19970304&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0960765A$$EHTML$$P50$$Gepo$$Hfree_for_read</linktohtml><link.rule.ids>230,308,776,881,25542,76290</link.rule.ids><linktorsrc>$$Uhttps://worldwide.espacenet.com/publicationDetails/biblio?FT=D&amp;date=19970304&amp;DB=EPODOC&amp;CC=JP&amp;NR=H0960765A$$EView_record_in_European_Patent_Office$$FView_record_in_$$GEuropean_Patent_Office$$Hfree_for_read</linktorsrc></links><search><creatorcontrib>KATO TSUTOMU</creatorcontrib><creatorcontrib>TANNO KOZO</creatorcontrib><creatorcontrib>MITSUBORI AKIHIRO</creatorcontrib><creatorcontrib>HIGUCHI TOSHIO</creatorcontrib><creatorcontrib>TANAKA MITSUHIRO</creatorcontrib><title>PERMANENT VERTICAL PIPING METHOD</title><description>PROBLEM TO BE SOLVED: To conduct the pipe connecting work for individual floors at a fixed position and improve execution efficiency by holding the lifted first pipe in a vertical attitude, adding and connecting the next pipe from below, again lifting the connected pipes in a vertical attitude, and repeating these actions. SOLUTION: The first pipe 1a is automatically held by an automatic pipe holding device 12, and a connecting jig 4 and a lifting jig 8 are removed from the lower end. The lifting jig 8 is set to the lower end of the second pipe 1b on the first floor. The lifting jig 8 is lifted by chain blocks 9, the second pipe 1b is lifted to the height of the connection position of its upper end to the lower end of the first pipe 1a, and the pipes 1a, 1b are connected. The lifting jig 8 set to the lower end of the second pipe 1b is further lifted by the chain blocks 9, and a connected body of the pipes 1a, 1b is integrally lifted until the lower end of the pipe 1b reaches the height of the connecting work position on the second floor.</description><subject>BLASTING</subject><subject>BUILDING</subject><subject>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</subject><subject>DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER</subject><subject>ENGINEERING ELEMENTS AND UNITS</subject><subject>FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS</subject><subject>FIXED CONSTRUCTIONS</subject><subject>FORMS</subject><subject>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</subject><subject>HANDLING BUILDING MATERIALS ON THE SITE</subject><subject>HEATING</subject><subject>JOINTS OR FITTINGS FOR PIPES</subject><subject>LIGHTING</subject><subject>MEANS FOR THERMAL INSULATION IN GENERAL</subject><subject>MECHANICAL ENGINEERING</subject><subject>PIPES</subject><subject>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</subject><subject>SCAFFOLDING</subject><subject>SEWERAGE</subject><subject>SHUTTERING</subject><subject>SINKS</subject><subject>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</subject><subject>THERMAL INSULATION IN GENERAL</subject><subject>WATER SUPPLY</subject><subject>WEAPONS</subject><fulltext>true</fulltext><rsrctype>patent</rsrctype><creationdate>1997</creationdate><recordtype>patent</recordtype><sourceid>EVB</sourceid><recordid>eNrjZFAIcA3ydfRz9QtRCHMNCvF0dvRRCPAM8PRzV_B1DfHwd-FhYE1LzClO5YXS3AwKbq4hzh66qQX58anFBYnJqXmpJfFeAR4GlmYG5mamjsZEKAEAxBsh1Q</recordid><startdate>19970304</startdate><enddate>19970304</enddate><creator>KATO TSUTOMU</creator><creator>TANNO KOZO</creator><creator>MITSUBORI AKIHIRO</creator><creator>HIGUCHI TOSHIO</creator><creator>TANAKA MITSUHIRO</creator><scope>EVB</scope></search><sort><creationdate>19970304</creationdate><title>PERMANENT VERTICAL PIPING METHOD</title><author>KATO TSUTOMU ; TANNO KOZO ; MITSUBORI AKIHIRO ; HIGUCHI TOSHIO ; TANAKA MITSUHIRO</author></sort><facets><frbrtype>5</frbrtype><frbrgroupid>cdi_FETCH-epo_espacenet_JPH0960765A3</frbrgroupid><rsrctype>patents</rsrctype><prefilter>patents</prefilter><language>eng</language><creationdate>1997</creationdate><topic>BLASTING</topic><topic>BUILDING</topic><topic>BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE</topic><topic>DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER</topic><topic>ENGINEERING ELEMENTS AND UNITS</topic><topic>FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS</topic><topic>FIXED CONSTRUCTIONS</topic><topic>FORMS</topic><topic>GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS</topic><topic>HANDLING BUILDING MATERIALS ON THE SITE</topic><topic>HEATING</topic><topic>JOINTS OR FITTINGS FOR PIPES</topic><topic>LIGHTING</topic><topic>MEANS FOR THERMAL INSULATION IN GENERAL</topic><topic>MECHANICAL ENGINEERING</topic><topic>PIPES</topic><topic>REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS</topic><topic>SCAFFOLDING</topic><topic>SEWERAGE</topic><topic>SHUTTERING</topic><topic>SINKS</topic><topic>SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING</topic><topic>THERMAL INSULATION IN GENERAL</topic><topic>WATER SUPPLY</topic><topic>WEAPONS</topic><toplevel>online_resources</toplevel><creatorcontrib>KATO TSUTOMU</creatorcontrib><creatorcontrib>TANNO KOZO</creatorcontrib><creatorcontrib>MITSUBORI AKIHIRO</creatorcontrib><creatorcontrib>HIGUCHI TOSHIO</creatorcontrib><creatorcontrib>TANAKA MITSUHIRO</creatorcontrib><collection>esp@cenet</collection></facets><delivery><delcategory>Remote Search Resource</delcategory><fulltext>fulltext_linktorsrc</fulltext></delivery><addata><au>KATO TSUTOMU</au><au>TANNO KOZO</au><au>MITSUBORI AKIHIRO</au><au>HIGUCHI TOSHIO</au><au>TANAKA MITSUHIRO</au><format>patent</format><genre>patent</genre><ristype>GEN</ristype><title>PERMANENT VERTICAL PIPING METHOD</title><date>1997-03-04</date><risdate>1997</risdate><abstract>PROBLEM TO BE SOLVED: To conduct the pipe connecting work for individual floors at a fixed position and improve execution efficiency by holding the lifted first pipe in a vertical attitude, adding and connecting the next pipe from below, again lifting the connected pipes in a vertical attitude, and repeating these actions. SOLUTION: The first pipe 1a is automatically held by an automatic pipe holding device 12, and a connecting jig 4 and a lifting jig 8 are removed from the lower end. The lifting jig 8 is set to the lower end of the second pipe 1b on the first floor. The lifting jig 8 is lifted by chain blocks 9, the second pipe 1b is lifted to the height of the connection position of its upper end to the lower end of the first pipe 1a, and the pipes 1a, 1b are connected. The lifting jig 8 set to the lower end of the second pipe 1b is further lifted by the chain blocks 9, and a connected body of the pipes 1a, 1b is integrally lifted until the lower end of the pipe 1b reaches the height of the connecting work position on the second floor.</abstract><edition>6</edition><oa>free_for_read</oa></addata></record>
fulltext fulltext_linktorsrc
identifier
ispartof
issn
language eng
recordid cdi_epo_espacenet_JPH0960765A
source esp@cenet
subjects BLASTING
BUILDING
BUILDING IMPLEMENTS OR OTHER BUILDING AIDS, OR THEIRUSE
DOMESTIC PLUMBING INSTALLATIONS FOR FRESH WATER OR WASTE WATER
ENGINEERING ELEMENTS AND UNITS
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
FIXED CONSTRUCTIONS
FORMS
GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVEFUNCTIONING OF MACHINES OR INSTALLATIONS
HANDLING BUILDING MATERIALS ON THE SITE
HEATING
JOINTS OR FITTINGS FOR PIPES
LIGHTING
MEANS FOR THERMAL INSULATION IN GENERAL
MECHANICAL ENGINEERING
PIPES
REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTINGBUILDINGS
SCAFFOLDING
SEWERAGE
SHUTTERING
SINKS
SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING
THERMAL INSULATION IN GENERAL
WATER SUPPLY
WEAPONS
title PERMANENT VERTICAL PIPING METHOD
url https://sfx.bib-bvb.de/sfx_tum?ctx_ver=Z39.88-2004&ctx_enc=info:ofi/enc:UTF-8&ctx_tim=2025-02-02T00%3A13%3A03IST&url_ver=Z39.88-2004&url_ctx_fmt=infofi/fmt:kev:mtx:ctx&rfr_id=info:sid/primo.exlibrisgroup.com:primo3-Article-epo_EVB&rft_val_fmt=info:ofi/fmt:kev:mtx:patent&rft.genre=patent&rft.au=KATO%20TSUTOMU&rft.date=1997-03-04&rft_id=info:doi/&rft_dat=%3Cepo_EVB%3EJPH0960765A%3C/epo_EVB%3E%3Curl%3E%3C/url%3E&disable_directlink=true&sfx.directlink=off&sfx.report_link=0&rft_id=info:oai/&rft_id=info:pmid/&rfr_iscdi=true